| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L | L1 | Accepted-AOC Low rate |
| 2 | L2₹4.5 L+₹16,982.50 (3.93%)Rejected-Finance | ₹4.5 L+₹16,982.50 (3.93%) | L2 | Rejected-Finance above rate |
| Sl No | Description | Qty | Unit | M/s KRM Constructions L2 | L.ELLAPPAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 B TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 25 | M3 | 180 ₹4,500 | 150 ₹3,750 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 12.5 | M3 | 5,450 ₹68,125 | 5,300 ₹66,250 Lowest |
| 3.00 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. for Drain wall centering complete complying with standard specification. TNDSS NO: 30&86 - For Sides | 228 | M2 | 495 ₹1,12,860 | 480 ₹1,09,440 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 32.5 | M3 | 6,850 ₹2,22,625 | 6,650 ₹2,16,125 Lowest |
| 5.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 51.5 | M2 | 180 ₹9,270 | 155 ₹7,982.5 Lowest |
| 6.00 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. for Drain wall centering complete complying with standard specification. TNDSS NO: 30&86 - For Culvert | 5.5 | M2 | 680 ₹3,740 | 650 ₹3,575 Lowest |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 155 | Kg | 95 ₹14,725 | 90 ₹13,950 Lowest |
| 8.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 1.3 | M3 | 10,500 ₹13,650 | 8,800 ₹11,440 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,250
Closing Date
14 Aug 2026, 3:00 pmClosed
E O
Melachokkanathapuram Town Panchayat
Construction of Drainage at Ward 3 Bod Thevaram Salai
2026_DTP_691803_1
356/2026
Open Tender
Civil Works
Works
180 days
Melachokkanathapuram Town Panchayat
As Per Tender Notice
3 documents required · 3 mandatory
₹500
₹5,250
Yes
Melachokkanathapuram Town Panchayat
14 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
6 Aug 2026 - 14 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 B TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 25 | M3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 12.5 | M3 | - | - |
| 3 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. for Drain wall centering complete complying with standard specification. TNDSS NO: 30&86 - For Sides | 228 | M2 | - | - |
| 4 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 32.5 | M3 | - | - |
| 5 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 51.5 | M2 | - | - |
| 6 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. for Drain wall centering complete complying with standard specification. TNDSS NO: 30&86 - For Culvert | 5.5 | M2 | - | - |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 155 | Kg | - | - |
| 8 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 1.3 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.27 MB
BOQ_831815.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .