| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | ₹3.3 L | L1 | Accepted-AOC tcr |
| 2 | L2₹4.3 L+₹1.0 L (31.2%)Rejected-Finance | ₹4.3 L+₹1.0 L (31.2%) | L2 | Rejected-Finance tcr |
| 3 | L3₹4.4 L+₹1.1 L (33.0%)Rejected-Finance 00 BALITIKURI BALITIKURI NASKARPARA HOWRAH WEST BENGAL 711113 | HOWRAH | WEST BENGAL | 711113 | ₹4.4 L+₹1.1 L (33.0%) | L3 | Rejected-Finance tcr |
| Sl No | Description | Qty | Unit | CHAKRABORTY ENTERPRISE L3 | GOPINATH ENTERPRISE L1 | REYANSH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Digging of earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 meter as directed bailing out water upto 1 meter depth shoring etc, when and if required and back filling with fine sand (including cost of sand) of completion of steining works. | 12 | mtr | 78.84 ₹946.08 | 58.8 ₹705.6 Lowest | 2,000 ₹24,000 |
| 3.00 | 1st class brick work for steining wall of well in cement morter 1:4 below G.L. including cuting bricks if required.well inner dia 2.5m with 15inch thich Brickwork | 41.36 | cum | 5,999 ₹2,48,118.64 | 5,585.8 ₹2,31,028.69 | 2,000 ₹82,720 Lowest |
| 4.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement: 6 coarse sand) | 5.99 | cum | 7,200 ₹43,128 | 5,838.5 ₹34,972.61 | 2,000 ₹11,980 Lowest |
| 5.00 | CEMENT PLASTER (IN FINE SAND) 12mm thick cement plaster of mix 1:6 (1 cement: 6 fine sand) | 32.91 | sqm | 340 ₹11,189.4 | 190.52 ₹6,270.01 Lowest | 2,000 ₹65,820 |
| 6.00 | Neat cement punning. | 41.17 | sqm | 1,200 ₹49,404 | 47.8 ₹1,967.93 Lowest | 2,000 ₹82,340 |
| 7.00 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and. dressing complete. | 0.41 | cum | 5,900 ₹2,419 | 891.75 ₹365.62 Lowest | 3,000 ₹1,230 |
| 8.00 | P/L P.C.C. excluding the cost of centering and shuttering All work up to plinth level - 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | 0.62 | cum | 105 ₹65.1 Lowest | 4,932.2 ₹3,057.96 | 4,000 ₹2,480 |
| 9.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting Fixing in position and annhause a priming.coat of | 17.66 | kg | 1,010 ₹17,836.6 | 82.1 ₹1,449.89 Lowest | 4,000 ₹70,640 |
| 10.00 | supplying and fitting fixing in position 15cm dia Cl pully | 3 | ls | 62 ₹186 Lowest | 250 ₹750 | 9,000 ₹27,000 |
Tender Value
₹3.3 L
EMD Value
₹4,200
Closing Date
2 Mar 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Roof support by roof bolting for proposed stowing panel S 8 in RVII seam of Sankalpa Khani Incline of Bankola Colliery.
2026_ECL_353701_1
ECL/GM/BA/E TENDER/25-26/Minl/130 Dt 19.02.2026
Open Tender
Miscellaneous Works
Item Rate
30 days
Shyamsundarpur Colliery
Please refer to NIT document
3 documents required · 3 mandatory
₹4,200
17 Apr 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
19 Feb 2026 - 23 Feb 2026
Item Description/ Heading
Digging of earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 meter as directed bailing out water upto 1 meter depth shoring etc, when and if required and back filling with fine sand (including cost of sand) of completion of steining works.
1st class brick work for steining wall of well in cement morter 1:4 below G.L. including cuting bricks if required.well inner dia 2.5m with 15inch thich Brickwork
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement: 6 coarse sand)
CEMENT PLASTER (IN FINE SAND) 12mm thick cement plaster of mix 1:6 (1 cement: 6 fine sand)
Neat cement punning.
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and. dressing complete.
P/L P.C.C. excluding the cost of centering and shuttering All work up to plinth level - 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting Fixing in position and annhause a priming.coat of
supplying and fitting fixing in position 15cm dia Cl pully
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_366515.xls
BOQ • 0.26 MB
corrigendum.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .