| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance BABU RAM THAKUR NIWAS BELOW UTTAM GAS AJANCY DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹6.4 L | L1 | Accepted-Finance accept |
| 2 | L2₹7.0 LAccepted-Finance | ₹7.0 L | L2 | Accepted-Finance accept |
| 3 | L3₹7.3 LAccepted-Finance R O VERMA NIWAS LOWER CEMETERY SANJAULI SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹7.3 L | L3 | Accepted-Finance accept |
Tender Value
₹5.0 L
EMD Value
₹10,100
Closing Date
21 Nov 2019, 11:00 amClosed
Additional General Manager
Additional General Manager SJPNL US Club Shimla 171001
O M sewerage scheme for Shimla town new Providing and laying 150 mm dia DI sewer pipe line from existing manhole toward house of Dr Lakhan Pal Sharma Building Janki Niwas Devi Ram house Sargeen Shimla
2019_MC_32548_1
dated 07-11-2019
Open Tender
Miscellaneous Works
90 days
Shimla
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Yes
AGM Sew SJPNL US Club Shimla 171001
₹10,100
6 Jan 2020
8 Nov 2019
21 Nov 2019
8 Nov 2019
21 Nov 2019
8 Nov 2019
8 Nov 2019 - 21 Nov 2019
Amount
Excavation in foundation, trenches etc., in earth work in all type of soil such as pick work, jumper work, blasting work Kankar, moorum shingles including decomposed soft and hard rock i/c cutting of top of metelled road etc., upto all heights stacking the excavated earth not more 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm. layers, when required into plinth and sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to all leads and lifts etc., complete in all respect.
Providing, laying jointing & testing in trenches centrifugal cast ductile iron (spun) pressure pipes as per IS:8329/2000 Class K-7 duly ISI marked, inside cement mortar lined suitable for tyton (push on joints) for sewer lines including cutting of pipes, chamfering where required (earth work in trenches and jointing of pipes to be measured and paid for separately) including carriage up to the site of work, testing etc., complete as per instructions of the Engineer-in-charge. (150 mm dia)
Providing & fixing in trenches centrifugal cast ductile iron fittings of as per IS: 9523/2000 class A, series K-12 with inside cement mortar lined suitable for tyton (push on joints) with sewers, such as socketed bends of all degrees, socketed, tees, collars and all other required fittings, including carriage up to the site of work, testing etc., complete as per instructions of the Engineer-in-charge. (earth work in trenches and jointing of fittings to be measured and paid for separately) 150 mm dia bends
11.25 degree
22.50 degree
45 degree
90 degree
Providing and fixing D.I Tees 150 mm x 150 mm x 100 mm
Providing tyton (Push on joints) to Ductile iron pipes and fittings including the testing of the joints cost of rubber gasket (SBR quality) conforming to IS 12820/1989 150 mm dia
Constructing manhole with R.C.C. top slab in 1:2;4 mix ( 1cement: 2 sand: 4 graded stone aggregate 20mm nominal size with 20cm thick foundation concrete 1:4:8 ( 1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) inside plastering 15mm thick with cement mortar 1:3 ( 1cement: 3 sand) finished with a floating coat of neat cement on 230mm thick burnt brick masonry walls and making channels in cement concrete 1:2:4 ( 1cement: 2 sand: 4 graded stone aggregate 20mm nominal size) finished smooth complete including curing and testing as per drawings.
Inside size 900mmx600mm and 600mm deep including SFRC cover with frame HD-10 (steel febre-reinforced concrete Manhole cover & frame) confirming to IS 12592 Part I & II-1988 with upto date amendments 130mm thick complete.
With 230mm thick walls of brick masonry using common burnt clay building bricks Ist class in cement mortar 1:3 ( 1 cement: 3 sand) excavation to be measured & paid for separately.
Providing and laying cement concrete 1:2:4 ( 1 cement: 2 sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth. including all leads and lifts complete in all respects and as per direction of Engineer in Charge.
Boulder filling dry hand packed tightly in foundation and plinth.
gian singh
MANOHAR LAL VERMA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid