Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance R O CHAKKA SHAGAN DISTRICT RAMBAN | RAMBAN | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹12.3 L
EMD Value
₹24,680
Closing Date
23 Dec 2020, 4:00 pmClosed
ER MAQBOOL HUSSAIN
XEN PWD RNB DIVISION RAMBAN
BOQ
2020_PWDJK_111603_4
e-NIT No 46 of 2020-21 Dt 15-12-2020
Open Tender
Civil Works
Item Wise
60 days
BANIHAL
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN PWD RNB DIVISION RAMBAN
₹24,680
Yes
29 Dec 2020
15 Dec 2020
24 Dec 2020
16 Dec 2020
23 Dec 2020
16 Dec 2020
Amount
Earth work in excavation by Mechanical means ( Hydraulic excavatar ) over areas (Exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan ) including . disposal of excavated earth, lead upto 50 mtr.and lift upto 1.50 mtr, disposed earth to be levelled and neatly dressed. AKS = 80% OR = 20%
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level 1:3:6 with 30% boulders. ( 1 cement :3coarse sand :6 graded stone aggregate 20 mm nominal size) crushed.including all carriage
Providing and laying cement concrete in retaining walls, return walls (any thickness) including attached pilasters , columns , piers , posts, struts butteresses , string or laces , courses , parapets , coping , bed blocks , anchorblocks , plain window sills ,sunken,floors , fillets etc. upto floor five level , excluding the cost of centring , shuttering and finishing.1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size ) Cr. including all carriage
Random Rubble Masonry with hard stone from Nallah in foundation & plinth including levelling up with cement concrete 1:6:12 ( 1 cement :6 coarse sand :12 graded stone agg.20 mm nominal size ) at plinth level with Cement mortar 1:6( 1 cement : 6 coarse sand) including carriage
Dry Random Rubble Masonary with hard stone in foundation and plinth Using Nallah stone with out bond stone
Centring and shuttering including strutting propping etc. and removal of form for :- Foundations, footings, bases of columns etc for mass concrete .
Centring and shuttering including strutting propping etc. and removal of form FOR Walls ( any thickness ) including attached pilasters , butteresses , plinth and string course
Dumping stone including cost of stones. In Horizontal on level including cost of stone mixed with 30% earth
Mohd Hanief Shan COntractor
Farooq Ahmed Sohil
SH NISAR SHAN
Mohd Sharief Wani
MOHAMMAD SHARIEF SOHIL AND SONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .