Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-Finance | ₹10.9 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹12.4 L+₹1.4 L (13.3%)Accepted-Finance | ₹12.4 L+₹1.4 L (13.3%) | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | SKYWAY ENTERPRISE L2 | Parmar Ramsinghbhai Valabhai L1 |
|---|---|---|---|---|---|
| 1.00Works | |||||
| 1.01 | Scraping oil paint from steel and other metal surface and making the surface even (with Hand Scraping.) | 172 | Sqm | 30 ₹5,160 Lowest | 44 ₹7,568 |
| 1.02 | Removing dry or oil bound distemper by a washing and scraping and sand papering the wall surface smooth including necessary repairs to scratches complete. | 1,471 | Sqm | 20 ₹29,420 | 19.5 ₹28,684.5 Lowest |
| 1.03 | Applying priming coat over new steel and other metel surface after and including preparing the surface by throughly cleaning, oil,grease, dirt and other foreign matter and scoured with brushes fine steel wood, scrapers and sand paper with ready mixed priming paint brushing red lead. | 172 | Sqm | 100 ₹17,200 | 98 ₹16,856 Lowest |
| 1.04 | Painting two coats (excluding priming coat) on previously painted steel and other metal surface with enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter. | 172 | Sqm | 200 ₹34,400 | 147 ₹25,284 Lowest |
| 1.05 | Appliying priming coat over new wood and wood based surface after and including preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting. (C) Ready mixed paint brushing priming for enamel | 41 | Sqm | 150 ₹6,150 | 88 ₹3,608 Lowest |
| 1.06 | Painting two coats (excluding priming coat) on previously painted wood and wood based surface with enamel paint, to give an even shade including cleaning the of all dirt, dust and other foreign matter. | 41 | Sqm | 200 ₹8,200 | 137 ₹5,617 Lowest |
| 1.07 | Appliying priming coat of Approved brand over wall surface after and including preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting. | 1,471 | Sqm | 100 ₹1,47,100 | 73 ₹1,07,383 Lowest |
| 1.08 | Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose powdered materials.etc complete | 1,391 | Sqm | 100 ₹1,39,100 Lowest | 157 ₹2,18,387 |
| 1.09 | Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C. member including stacking of serviceable material and disposal of unserviceable from site of work with all lead and lift. | 400 | Sqm | 20 ₹8,000 Lowest | 69 ₹27,600 |
Tender Value
₹11.1 L
EMD Value
₹22,300
Closing Date
3 Jun 2026, 2:30 pmClosed
The Executive Engineer, PWD, WD-II, Diu
O/o. The Executive Engineer, PWD, WD-II, Fort Road, Diu
Repairing and Renovation of Light House in the Diu District (3rd Call)
2026_DIUDT_4795_1
e-tender Notice No. 23/2026-27
Open Tender
Civil Works - Others
Works
60 days
Diu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
The Executive Engineer, PWD, WD-II, Diu
₹22,300
27 Jul 2026
26 May 2026
3 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Works | |||||
| 1.01 | Scraping oil paint from steel and other metal surface and making the surface even (with Hand Scraping.) | 172 | Sqm | - | - |
| 1.02 | Removing dry or oil bound distemper by a washing and scraping and sand papering the wall surface smooth including necessary repairs to scratches complete. | 1,471 | Sqm | - | - |
| 1.03 | Applying priming coat over new steel and other metel surface after and including preparing the surface by throughly cleaning, oil,grease, dirt and other foreign matter and scoured with brushes fine steel wood, scrapers and sand paper with ready mixed priming paint brushing red lead. | 172 | Sqm | - | - |
| 1.04 | Painting two coats (excluding priming coat) on previously painted steel and other metal surface with enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter. | 172 | Sqm | - | - |
| 1.05 | Appliying priming coat over new wood and wood based surface after and including preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting. (C) Ready mixed paint brushing priming for enamel | 41 | Sqm | - | - |
| 1.06 | Painting two coats (excluding priming coat) on previously painted wood and wood based surface with enamel paint, to give an even shade including cleaning the of all dirt, dust and other foreign matter. | 41 | Sqm | - | - |
| 1.07 | Appliying priming coat of Approved brand over wall surface after and including preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting. | 1,471 | Sqm | - | - |
| 1.08 | Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose powdered materials.etc complete | 1,391 | Sqm | - | - |
| 1.09 | Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C. member including stacking of serviceable material and disposal of unserviceable from site of work with all lead and lift. | 400 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_4966.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .