Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
27 May 2026, 3:00 pmClosed
Abhishek Kumar
Director Horticulture- Cum- Mission Director
Krishi Bhawan,Mithapur, Patna
Abhishek Kumar
Director Horticulture-Cum-Mission Director
REQUEST FOR PROPOSAL (RFP) FOR EMPANELMENT OF THIRD PARTY INSPECTION AGENCY (TPIA) FOR INDEPENDENT MONITORING, VERIFICATION & EVALUATION OF PER DROP MORE CROP (PDMC) SCHEME UNDER PM-RKVY / PMKSY
130540
LetterNo. DoH/CS/58/2026-2051 Dated 30.04.2026
Open Tender
GENERAL
Patna
• Name of Firm/Company
• Address of Firm/Company
• Head Office
• Branch Office
• Name of In-Charge
• Phone No.
• Fax No.
• Mobile No.
• E-mail ID
• Date
• Place
GENERAL
ITEM RATE
H1
1
18 documents required · 18 mandatory
₹5 L
Directorate of Horticulture, Department of Agriculture, 2nd Floor, Krishi Bhawan, Mithapur, Patna.
4 May 2026
4 May 2026
29 May 2026
4 May 2026
27 May 2026
4 May 2026
13 May 2026
Financial Proposal/Bid for e-Tender
State Horticulture Mission, Bihar
E-Tender notice FOR EMPANELMENT OF THIRD PARTY INSPECTION AGENCY (TPIA) FOR INDEPENDENT MONITORING, VERIFICATION & EVALUATION OF PER DROP MORE CROP (PDMC) SCHEME UNDER PM-RKVY / PMKSY
Bidder's Information
1 Name of Firm/Company
2 Address of Firm/Company
4 Branch Office
5 Name of In-Charge
Rate quoted for E-Tender notice for FOR EMPANELMENT OF THIRD PARTY INSPECTION AGENCY (TPIA) FOR INDEPENDENT MONITORING, VERIFICATION & EVALUATION OF PER DROP MORE CROP (PDMC) SCHEME UNDER PM-RKVY / PMKSY :-
Sl. Item / Activity Unit Qty (Est.) Rate per Unit (₹) Total Amount (₹) Remarks
1 Pre-Installation Verification (beneficiary list validation, SCP/TSP compliance, duplicate check) – across all 38 districts Lump Sum per annum 1
2 Concurrent Field Monitoring (random site visits, BIS compliance checks) – per beneficiary inspected Per Beneficiary [~50,000] Rate inclusive of TA/DA & logistics
3 Post-Installation Physical Verification (100% BVC generation, GPS measurement, biometric acknowledgement) – per beneficiary Per Beneficiary [~50,000] Rate inclusive of TA/DA & logistics
4 60-Day Functionality Check – per beneficiary sampled (20% of total) Per Beneficiary [~10,000]
5 180-Day Sustainability Check – per beneficiary sampled (10% of total) Per Beneficiary [~5,000]
6 Annual Impact Evaluation Report (AIER) – baseline + endline survey (5% sample with control groups) Lump Sum per annum 1 Includes survey design, data collection, analysis
7 IEC Effectiveness Assessment (random panchayat assessment, beneficiary awareness surveys) Lump Sum per annum 1
8 GIS Mapping & KML/KMZ submission (command area polygons for all installation clusters) Per District per Annum 38
9 Quarterly Progress Reports (QPR) – including data entry, MIS upload, report preparation Per QPR 8
10 Monthly Concurrent Monitoring Reports Per Report 24
11 Final Project Completion Report Lump Sum 1
12 Project Management & Overhead (Team Leader, Deputy TL, Office costs, admin, travel, insurance) Lump Sum per annum 2 Detail to be provided in tech bid
GRAND TOTAL (Inclusive of all taxes, GST, TA/DA, logistics, field costs)
Note 1: Quantities shown are estimates. Actual quantities may vary by ±20%. Payment shall be made on actual quantities verified and accepted. Note 2: All rates are to be quoted inclusive of GST, TA/DA, accommodation, field logistics, communication costs, data management costs, and all other overheads. No additional claim shall be entertained. Note 3: Rates quoted shall remain firm for the entire contract period (2 years). No price escalation shall be admissible.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NITPDMC.pdf
NIT • 10.36 MB
Financial.xls
NIT • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .