Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-AOC | ₹31.7 L Quoted ₹32.4 L | L1 | Accepted-AOC Being L1 Bidder |
| 2 | L2₹34.1 L+₹1.8 L (5.44%)Rejected-Finance R O ZANGSTI LEH LADAKH 194101 | LEH | LEH | LADAKH | 194101 | ₹34.1 L+₹1.8 L (5.44%) | L2 | Rejected-Finance Other than L1 bidder |
| 3 | L3₹35.0 L+₹2.6 L (8.16%)Rejected-Finance | ₹35.0 L+₹2.6 L (8.16%) | L3 | Rejected-Finance Other than L1 bidder |
| 4 | L4₹35.3 L+₹2.9 L (9.10%)Rejected-Finance SHAMSHU COMPLEX FORT ROAD LEH LADAKH 194101 | LEH | LEH LADAKH | LADAKH | 194101 | ₹35.3 L+₹2.9 L (9.10%) | L4 | Rejected-Finance Other than L1 bidder |
| 5 | L5₹37.4 L+₹5.0 L (15.4%)Rejected-Finance | ₹37.4 L+₹5.0 L (15.4%) | L5 | Rejected-Finance Other than L1 bidder |
| Sl No | Description | Qty | Unit | M/S MOHD KARIM L7 | M/S INDUS HIMALAYAN EXPLORERS L4 | M/S Deldan Namgail L8 | M/S HONY CAPT RIGZIN SAMPHEL L5 | M/S MOHD MUSSA L3 | M/S GHULAM MOHAMMAD CHATAPA L1 | MEHDI ALI L6 | MS SHOWKAT ALIJOO L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Dismantling timber frame, framed work as in fillets, rails, posts, purlins, etc under 40 sqcm in section. complete, all as specified & directed by Engineer-in-charge. | 0.4 | CUM | 1,525 ₹610 | 1,500 ₹600 | 1,550 ₹620 | 1,445 ₹578 | 1,500 ₹600 | 1,390 ₹556 Lowest | 1,560 ₹624 | 1,500 ₹600 |
| 2.00 | M&L for second class hard wood in scantling, clean sawn timber framed and fixed work complete, all as specified & directed by Engineer-in-charge. | 0.4 | Cum | 1,24,200 ₹49,680 | 1,13,980 ₹45,592 Lowest | 1,24,850 ₹49,940 | 1,23,980 ₹49,592 | 1,13,980 ₹45,592 Lowest | 1,13,980 ₹45,592 Lowest | 1,13,980 ₹45,592 Lowest | 1,13,980 ₹45,592 Lowest |
| 3.00 | Dismantling timber framed work as in fillets, rails, posts, rafters, purlins, etc. under 40 sq. cm in section, complete all as specified and as directed by Engr-in-Charge. | 2,030 | RM | 38 ₹77,140 | 50 ₹1,01,500 | 50 ₹1,01,500 | 35 ₹71,050 | 50 ₹1,01,500 | 23 ₹46,690 Lowest | 80 ₹1,62,400 | 50 ₹1,01,500 |
| 4.00 | M&L for second class wrought hard wood plain fillets, square, rectangular or triangular in section, sectional area 13 sqcm but n exc 25 sqcm, secure with screws,complete, all as specified & directed by Engineer-in-charge. | 2,030 | RM | 235 ₹4,77,050 | 250 ₹5,07,500 | 300 ₹6,09,000 | 225 ₹4,56,750 | 250 ₹5,07,500 | 199 ₹4,03,970 Lowest | 250 ₹5,07,500 | 199 ₹4,03,970 Lowest |
| 5.00 | Plugging to walls complete for wood fillets, grounds moulding, etc. on cement concrete walls, at distance n. exc 1 mtr complete all as specified and as directed. | 2,030 | Rm | 125 ₹2,53,750 | 150 ₹3,04,500 | 150 ₹3,04,500 | 115 ₹2,33,450 | 83 ₹1,68,490 Lowest | 83 ₹1,68,490 Lowest | 150 ₹3,04,500 | 83 ₹1,68,490 Lowest |
| 6.00 | Dismantling of boarding, any description, fixed in any position with nailst and including fillet etc, complete all as specified and as directed by Engr-in-Charge. | 1,450 | SQM | 56 ₹81,200 | 40.2 ₹58,290 Lowest | 60 ₹87,000 | 45 ₹65,250 | 40.2 ₹58,290 Lowest | 40.2 ₹58,290 Lowest | 80 ₹1,16,000 | 40.2 ₹58,290 Lowest |
| 7.00 | M&L for 9 mm thick Prelaminated particle board, interior grade, prelaminated one side with decorative choice lamination & other side balancing white lamination, fixed with screws to timber frame work fixed in ceiling complete, all as specified & directed by Engineer-in-charge. | 1,450 | SQM | 1,252 ₹18,15,400 | 951.2 ₹13,79,240 Lowest | 1,200 ₹17,40,000 | 1,015 ₹14,71,750 | 951.2 ₹13,79,240 Lowest | 951.2 ₹13,79,240 Lowest | 951.2 ₹13,79,240 Lowest | 951.2 ₹13,79,240 Lowest |
| 8.00 | M&L 3mm thick Cover fillets of tempered hard board, 40mm wide and fixing with screws all as Specified | 536 | Rm | 85 ₹45,560 | 41.2 ₹22,083.2 Lowest | 90 ₹48,240 | 80 ₹42,880 | 41.2 ₹22,083.2 Lowest | 41.2 ₹22,083.2 Lowest | 80 ₹42,880 | 41.2 ₹22,083.2 Lowest |
| 9.00 | Dismantling wall and ceiling board or insulation boards any thickness including cover fillets complete, all as specified & directed by Engineer-in-charge. | 90 | SQM | 95 ₹8,550 | 51.2 ₹4,608 Lowest | 120 ₹10,800 | 90 ₹8,100 | 51.2 ₹4,608 Lowest | 51.2 ₹4,608 Lowest | 800 ₹72,000 | 800 ₹72,000 |
| 10.00 | M&L in repair Anodised aluminium snap grid frame work Size of grid 605 x 605mm for false ceiling complete all as specified and directed . | 90 | SQM | 625 ₹56,250 | 576 ₹51,840 Lowest | 612 ₹55,080 | 612 ₹55,080 | 576 ₹51,840 Lowest | 576 ₹51,840 Lowest | 576 ₹51,840 Lowest | 576 ₹51,840 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
20 Apr 2026, 6:00 pmClosed
GE (AF) Thoise
GE (AF) Thoise PIN 937219 c/o 56 APO
REPAIR/ REPLACEMENT OF WALL PANELING, FALSE CEILING, JOINERY, FLOORING, SHEET AND ALLIED WORKS IN VARIOUS BLDGS IN DOMESTIC AREA AT AF STN THOISE
2026_MES_758415_1
8110/E8
Open Tender
Civil Works
Item Rate
150 days
Thoise
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) Thoise
₹60,000
Yes
8 Jun 2026
30 Mar 2026
22 Apr 2026
30 Mar 2026
20 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismantling timber frame, framed work as in fillets, rails, posts, purlins, etc under 40 sqcm in section. complete, all as specified & directed by Engineer-in-charge. | - | CUM | - | - |
| - | M&L for second class hard wood in scantling, clean sawn timber framed and fixed work complete, all as specified & directed by Engineer-in-charge. | - | Cum | - | - |
| - | Dismantling timber framed work as in fillets, rails, posts, rafters, purlins, etc. under 40 sq. cm in section, complete all as specified and as directed by Engr-in-Charge. | - | RM | - | - |
| - | M&L for second class wrought hard wood plain fillets, square, rectangular or triangular in section, sectional area 13 sqcm but n exc 25 sqcm, secure with screws,complete, all as specified & directed by Engineer-in-charge. | - | RM | - | - |
| - | Plugging to walls complete for wood fillets, grounds moulding, etc. on cement concrete walls, at distance n. exc 1 mtr complete all as specified and as directed. | - | Rm | - | - |
| - | Dismantling of boarding, any description, fixed in any position with nailst and including fillet etc, complete all as specified and as directed by Engr-in-Charge. | - | SQM | - | - |
| - | M&L for 9 mm thick Prelaminated particle board, interior grade, prelaminated one side with decorative choice lamination & other side balancing white lamination, fixed with screws to timber frame work fixed in ceiling complete, all as specified & directed by Engineer-in-charge. | - | SQM | - | - |
| - | M&L 3mm thick Cover fillets of tempered hard board, 40mm wide and fixing with screws all as Specified | - | Rm | - | - |
| - | Dismantling wall and ceiling board or insulation boards any thickness including cover fillets complete, all as specified & directed by Engineer-in-charge. | - | SQM | - | - |
| - | M&L in repair Anodised aluminium snap grid frame work Size of grid 605 x 605mm for false ceiling complete all as specified and directed . | - | SQM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
8110Tender.pdf
Tender Documents • 1.13 MB
BOQ_849487.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .