Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
24 May 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Jhansi
132KV S/S Hasari Jhansi
Work
2023_UPTCL_799597_1
ETS-05/ETC(J)/23-24
Open Tender
Electrical Works
Fixed-rate
90 days
Jhansi
As per PQR
2 documents required · 2 mandatory
₹590
SE ETC JHANSI
₹10,000
10 Jan 2024
29 Apr 2023
25 May 2023
29 Apr 2023
24 May 2023
29 Apr 2023
Amount
Following works are to be carried out for the work of installation, erection & comissioning of new 63 MVA 132/33 KV T/F at 132 KV S/S Mauranipur alongwith associated works including all cost of men miscellaneous consumables. etc to complete the job.
Dismantling of 132 KV LA with structures & jumpers to facilitates shifting of 40 MVA Transformer.
Re-erection 132kv LA including jumpers thereof after completion of erection of 63 MVA Transformer at 132KV S/S Mauranipur.
Opening of 132 & 33 KV Jumpers of 40 MVA T/F
Dismantling of 40 MVA T/F including removal of earthing & opening 0f cable connection, draining out the T/F Oil upto required level in 209 Ltr Capacity oil drum/tanks, removal of all radiators etc. with proper blanking to complete the job satisfactorily, including proper stacking of radiators at 132 KV S/S Mauranipur. Blanking Plates, nuts & Bolts shall be provided by department. All the T&P & man power etc. shall be arranged by the contractor.
Shifting of 40 MVA T/F with accessories to safe place upto 20 meters including turning of T/F tank if needed at 132KV S/S Mauranipur.
Additional Shifting of 40 MVA T/F main Tank upto 5 Meters or part thereof.
Shifting of main Tank of new 63MVA T/F to Plinth from place of storage upto 20 Meter distance including turning of tank, if required.
Additional Shifting of 63 MVA T/F main Tank upto 5 Meters or part thereof.
Complete erection of new 63 MVA T/F including Radiators, Conservator Tank, Bushings, Connecting Pipe Lines, Cooling Fans & Marshalling Box, OTI,WTI, Capillary, Pipes etc.
Centrifuging/Dehydration of the complete T/F oil of new 63 MVA T/F by Ultra High vaccum oil filtration plant after connecting the centrfuging pipes with T/F to oil filtration plant including taking BDV values of oil & megger values of the T/F periodically till the PPM value is achieved desired by supervisiory engineer including filling & topping of T/F oil from oil drums to the above prepared T/F, Radiator, Conservator tank etc with all cost of centrifuging machine, CFM Operator, Lubricants etc.
Earthing of main tank marshalling box drive mechanism T/F neutral etc of new 63 MVA T/F with the help of 50x6mm/75x10mm size MS Flat to be provided by department, its jointing with already laid earthmat/deltas at 2 place & necessary modification in existing suppport for earthing of neutral bushing support for its earthing work & painting of earthing strips as per technical specification/standard practice.
Complete Dismantling of 3Nos. 33 kv CT ratio 800/400/1A (old & used) including opening jumper,earthing.and cable connectin and Complete Erection of 3 Nos. 33kv CT ratio 2000/1250/1 A including cable connection, jumpering, earthing etc.
Jumpering of.132 & 33 KV side of 63 MVA T/F
Erection of new 63 MVA T/F RTCC Panel including shifting from storage place to control room and safe dismantling of existing RTCC Panel of 40MVA T/F.
Connection of the control & power cables as per new cable schedule of new 63 MVA T/F & its OLTC/RTCC Panels at both ends control & relay panel, cooling fans & pumps, marshalling box etc. using existing cable, including laying Dressing & Binding of additional control cables, if required as per site requirement and termination alongwith making necessary holes in the glands plates or box wherever required providing and fixing of cable glands of appropriate size, providing of ferrules and cable termination lugs as per standard & all other associated work as per technical specification including preparation of cable schedule drawing.
2C x 2.5 Sq mm. unarmoured.
4C x 2.5 Sq mm. unarmoured.
6C x 2.5 Sq mm. unarmoured.
Preparation of inter connection drawing, cable schedule of 63 MVA, 132/33 KV T/F, C&R Panel, RTCC Panel, junction Box, equipment ie CTs, PTs, CBs, isolators etc in 3 Set (duly approved by concerned Executive Engineer) the drawing of equipments and triple feeder Panel to be provided by the department.
Delta Earthing of 63MVA TF HV and LV Side
Loading 33KV 1250/1A CT(3 Nos) from 132KV Substation Hasari Jhansi.
Carriage of 33KV 1250/1A CT(3 Nos) from 132KV Substation hasari Jhansi to 132KV Substation Mauranipur (Distance approx. 65Km.)
Unloading 33KV 1250/1A CT(3 Nos) at 132KV Substation Mauranipur.
BARKATI ENTERPRISES
SATKAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .