Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | -43.99% | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 LAdmitted-Finance | -37.65% | ₹4.8 L | L2 | Admitted-Finance |
| 3 | L3₹5.1 LAdmitted-Finance | -33.99% | ₹5.1 L | L3 | Admitted-Finance |
Tender Value
₹7.8 L
EMD Value
₹15,560
Closing Date
5 Mar 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
XECUTIVE ENGINEER REW JAMMU
Construction of Community Hall near kabir Bhawan mottey pyt Kaloen Block Suchetgarh under CDF for FY 2025-26
2026_RDPR_304669_2
e-NIT No. 873 REWJ of 2025-26 dated 27-02-2026
Open Tender
Civil Works
REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GOVERNMENT TREASURY JAMMU
₹15,560
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
Earthwork in Excavation by manual means in trenches for foundations, drains, pipes, cable etc(Not Exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge, disposed earth is to be levelled and neatly dressed in all kind of soil.
Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Centring and shuttering including strutting, propping etc and removal of form work for ; Foundation , Footing , Bases of Column
Centring and shuttering including strutting, propping etc and removal of form work for ; columns upto roof level
Centring and shuttering including strutting, propping etc and removal of form work for ; P/beams & Slab Beam
Centring and shuttering including strutting, propping etc and removal of form work for ; u/slab
edge of slab
Filling available excavated earth (excluding rock) in trenches,plinth,sides of foundations etc. in layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
12 mm thick plaster in 1:4 mix
6 mm Plaster to celing of mix 1:3 (1 cement: 3 Fine Sand)
carriage of material SAND and Stone Aggregates from 30 km distance by MT
head load50mtr
Providing Display Board with Lettering and writing Complete Job
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_989660.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid