Construction of Community Bhawan atGokulgarh Aabadi Gram Panchayat Ballar
2026_PRD_564400_1
41-47 DATE 01-06-2026 GP BALLAR
Open Tender
Civil Works
180 days
GP BALLAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MD RISL
₹10,000
Yes
3 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
8 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a distance of 50 meters. | 21.8 | Cum | 143.92 | ₹3,137.46 |
| 2 | Cement concrete foundation or floor 40 mm. The stone of the renowned measure is to be poured into the limestone ballast /brick soil, cement-sand masala in the ratio of 1 cement : 5 sand :10 ballast and cutting, including lowland. | 2.3 | Cum | 3,493.44 | ₹8,034.91 |
| 3 | Foundation and chair first class brick masonry cement - gravel in 1:6 spices, including bunding and lowland. | 15.77 | Cum | 4,189.5 | ₹66,068.42 |
| 4 | Lifting and leveling up to 1.5 m or 50 m out of dug soil, mounds or tubes. And Carriage From 2KM 153 | 20.85 | Cum | 220.41 | ₹4,595.55 |
| 5 | Cement Concrete 1:1.5:3 Pouring and supplying the mixture into the reinforced cement concrete, pressing in roof slabs, balconies, beams, lintles, etc., etc., but the cost of steel and shuttering, including restrictions, etc., and leveling the surface with 1:3 cement spices, etc. | 4.27 | Cum | 5,945.68 | ₹25,388.05 |
| 6 | The work of cutting, folding and placing and tying iron for RCC work is done to supply.61 | 280.91 | Kg | 97.94 | ₹27,512.33 |
| 7 | R.C.C. of The Centering'Shuttering (Plank and Execution) Installation of roof, slab, balcony, lint etc. up to a height of 4.5 | 18.66 | Sqm | 319.04 | ₹5,953.29 |
| 8 | Additional amount from chair level up to 4.5 m height in masonry work in superstructure. | 15.63 | Cum | 4,438.11 | ₹69,367.66 |
| 9 | Cutting and plating the iron girder and applying it to a height of 4.5 meters. Note:- Analysis 6m length and size MB 300 . (44.2 kg per meter)62 | 362.44 | Kg | 92.52 | ₹33,532.95 |
| 10 | To plant and supply the rough stone cutting dahal, dasa and coping in cement masala 1:4. 37B | 1.56 | Sqm | 1,674.13 | ₹2,611.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1004446.xls
BOQ • 0.29 MB
NITDOC.pdf
Tender Documents • 6.55 MB
Download all tender documents and submit your bid