Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹286.3 Cr
EMD Value
₹5.7 Cr
Closing Date
18 Dec 2026, 2:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
Yes
23/11/2026 15:30
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
HQ TENDER
30 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar Nature of Works means: A. Major Component [ Construction of underground Tunnel No. 18 (Approx. Length -255RM) and cut and cover tunnel (Approx. Length - 55M) for double line BG track between chainage 77055.00m to 77365.00m, 255 m single BG line Cut and cover tunnel between chainage 75209 m to 75464 m including protection work., Rs.218,50,16,427.67] - "Any underground transportation (Railway/Road) tunnel work executed by NATM (New Austrian Tunnelling Method) in the Himalayan / North-Eastern hilly region" B. Minor component [ Station building, platform works and other ancillary works at Zubza yard between chainage 77365.00m to 78000.0m in connection with DMV- Kohima new BG line Projects. , Rs.67,82,54,950.58 ] - "Any building works with framed structures ".
52 conditions · 7 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenders have been invited for and on behalf of the President of India for the work mentioned as per NIT.
Tender documents are not transferable .
It is understood that you are agreed to abide by the conditions those are laid down in the tender document when you submit the tender.
The tender document includes various chapters, drawings and annexures as enclosed, those are integral parts of the tender documents.
Rates enter in to rate page shall only be considered. Rates offered in any other form /letter by the tenderer shall not be considered.
Tenders other than in form of e-Tendering shall not be accepted against this tender. For this purpose, tenderers are required to submit their offer in IREPS.
In case of any difficulty faced by the tenderer while submitting their bid in the IREPS website assistance from help desk available with the website may be sought.
Railway Administration will not be responsible for any delay/difficulties /inaccessibility of the down loading facility for any reason whatsoever. In case of any discrepancy between the tender documents down loaded from internet and the master copy available in the offices, the latter shall prevail and will be binding on the tenderer(s). No claim on this account will be entertained.
Joint venture will be permitted in the tender value more than Rs.10.00 Crs.
Tenderer(s) has to go through the "Guideline & Conditions" of JOINT VENTURE included in Tender document carefully. Non- compliance of any conditions mentioned in the guideline of JV is liable to result in the tender being rejected.
General information about the project/work is attached separately. However the tenderer(s) are advised to visit the site for appreciation before submitting of tender.
Name & mailing address of the Tenderer(s) shall be clearly mentioned in ENGLISH language.
All the information requested for Tender shall be answered in the ENGLISH language. Where information is provided in another language, this shall be accompanied by a translation of its pertinent parts into ENGLISH. This translation will govern and be used for interpreting the information.
The railway reserves the right to:
Amend the scope and value of the work.
Reject or accept any tender; and
Cancel the tender process and reject any or all tenders, at any time.
The tenderer(s) have to fill up all the documents as stated in document.
Tenderer(s) are compulsorily required to indicate page number in the check list against relevant documents submitted by him / them.
In case of two packet system of tendering, the Second packet (Finance Bid) of only eligible tenderers found in the first packet (Technical Bid) will be opened.
Incomplete tenders are liable to be rejected without further correspondence.
If any one or more of the detailed information furnished in the tenderer's documents is proved to be false at any stage, the contractor/ firm will be debarred then and there, from all the commitments connected with the tender and his/their tender/contract will be rejected/terminated and further action will be taken as per extant rules.
Clarification of Bids: To assist in the examination, evaluation & comparison and prequalification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
The Railway reserves the right to reject any or all offers without assigning any reasons and his decision shall be final and binding.
Clause 6 (Care In Submission Of Tenders), Part-I of Standard General Conditions of Contract - 2022.
(a)(i) Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the r a t e s he enters in the tender f o r m s a r e adequate and all inclusive t o accord w i t h t h e provisions in Clause-37 o f the Standard General Conditions o f Contract f o r t h e completion of works to the entire satisfaction of the Engineer.
(ii) Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services T a x A c t , 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified b y Central/State G ov t & as amended from tim e t o tim e and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
(iii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately a f t e r t h e a w a r d o f contract, without w h i c h no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
(iv)In case the successful tenderer is not liable t o be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their b i l l s u n d e r r e v e r s e charge mechanism (RCM) and deposit t h e same to the concerned authority.
PRICE VARIATION clause shall be applicable for tenders having value above Rs. 2 Crores.
The Bid Security shall be deposited either in cash through e payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90days beyond the bid validity period.
Mobilization advance is applicable to tender of value of Rs. 50.00 Crs. and above.
The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI and proforma-II failing which offer shall be considered as incomplete and will be rejected summarily. (Applicable for works costing more than Rs.10.00 crore).
Tender notice attached shall also form part of tender document.
Construction of Double BG track Tunnel No. 18 (Approx. Length -255 RM) and 55 m cut and cover, 255 m single BG track Cut and cover, including Station building, platform works, Subway, Approach road, PP Shed, Retaining wall, water hydrant, Location Hut, water tank, boundary wall, water vat, Horticulture and landscape work, protection work and ancillary works between chainage 75200.00m to 78062.0m in connection with DMV - Kohima new BG line Projects.
CON-HQ-DK-MIS-2026-10~NFRCON
CON-HQ-DK-MIS-2026-10
Open
Works - General
22 Months
Unknown (Unspecified Location)
₹0
₹5.7 Cr
11 Nov 2026
11 Nov 2026
4 Dec 2026
23 Nov 2026
348 items across 6 schedules · ₹2,90,01,67,788.23 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in open excavation/cutting in all kind of soils and rock, including rock requiring use of blasting, chiseling, crow bars etc. where necessary at portals/tunnels, in cutting for road formation, approach cut of road, bridges and to make berms, surface drains/catch water drain and the like, diversion of irrigation canal, nullah & the like, in foundation of bridges and retaining wall etc. and disposal of the excavated material to dumping site etc. as per approved drawings & specifications or as directed by the Engineer. The rate for this item includes in all sites clearance (cutting of trees, shrubs, roots, vegetation etc.), lift ascent descent handling, loading, unloading & lead upto 2 km, dressing of cuttings to final profile, demarcation and setting out, cutting of trees, shrubs, vegetation etc. all | cum | 115000.00 | 99.53 | 1,14,45,950 |
| 2 | Underground excavation for tunnel, including temporary provision at the portal for the start of tunnel excavation like canopy structure (false portal) etc. trolley refuge niches, maintenance niches, MVS niches and the like and for the connection of remaining part of access tunnel (approx.85m) with the main tunnel including drilling, blasting or other means of excavation, including widening of top heading footing, breaking of shotcrete lining in temporary invert, provision of surface drainage, construction ventilation, lighting arrangement during construction, temporary back filling for traffic in tunnel, profiling/ re-profiling of tunnel as per approved cross sections, removal and disposal of excavated materials including temporary back fill to dumping site with all lift and leads upto 2 kms from portals/ shaft head as per approved drawings & specifications or as directed by Engineer. (a) Excavation in Rock class VII & VIII | cum | 37203.00 | 2,794.32 | 10,39,57,086.96 |
| 3 | Placing of 150 x 150 x 6 mm welded wire fabric of Fe 500 as reinforcement in primary lining & Inner lining as per approved drawings & specification or as directed by Engineer. The rate shall include all labour, materials, cost of pins, hook, lead, lift, handling wastage complete with contractors own equipment for the complete job. | MT | 198.00 | 3,207.71 | 6,35,126.58 |
| 4 | Fabrication, leading and erection in position permanent tunnel steel supports as per design/ approved drawing including fore poling, cutting drilling, welding /riveting, cold /hot blending, threading, fixing/removing from work, leveling, aligning, fixing in position with providing all accessories such as all nuts, bolts, washers, tie rod, gusset/wall plates, base plate etc. and providing timber struts, prestressing by blocking against rock/soil surface etc. complete including all leads and lifts from fabrication yard to erection site as directed by the Engineer. Calculation of weight for payment under this item will include all structural steel, tie rod, wall plates,base plate, nuts bolts, washers, gussets etc. as per approved drawing as all the accessories are part of permanent steel support in the tunnel. | MT | 668.00 | 9,113.7 | 60,87,951.6 |
| 5 | Supply of 150 x150 x 6mm welded wire fabric of fe 500 as reinforcement in primary lining & inner lining as per approved drawings & specification or as directed by Engineer. The rate shall include all labour, materials, cost of pins, hock. lead, lift handling, wastage complete with contractors own equipment for the complete job. | MT | 198.00 | 82,445.08 | 1,63,24,125.84 |
| 6 | Supply of approved quality steel components of various sections & other steel items conforming to relevant Code, Standards, specifications for permanent steel supports in tunnels inclusive of cost of materials, wastage, storing,handling, machines ,manpower, consumables, T&P, experts, supervision, all leads & lifts, taxes etc., complete as per scope of work, special condition of contract & instruction of Engineer- in- charge. NOTE: (i) Admissible quantities under this item will be as per item 4 of Schedule 'A' i.e. "Fabrication, leading and erection in position permanent tunnel steel supports". | MT | 668.00 | 80,180.06 | 5,35,60,280.08 |
| 7 | Supply, drilling and installation and grouting of fore poling as per approved drawings & specification or as directed by Engineer . The rate shall include costs of all materials, labour, equipment etc. required for the complete job. a)Self drilling bolts Fy >= 200KN | Metre | 1000.00 | 2,515.15 | 25,15,150 |
| 8 | Supply, drilling and installation and grouting of 76mm outer dia self drilling bolts, Fy>=1200 KN of length of 15m as per approved drawings & specification, inclusive of cost of materials, machines, manpower, consumables, T&P, experts, supervision, all leads and lift etc. complete as per scope of work, special conditions of contract and instructions of Engineer-in- charge. | RM | 32670.00 | 9,325.74 | 30,46,71,925.8 |
| 9 | Supply, drilling and installation and grouting of 76mm outer dia self drilling bolts for pipe roof, Fy>=1200 KN of length of 15m as per approved drawings & specification, inclusive of cost of materials, machines, manpower, consumables, T&P, experts, supervision, all leads and lift etc. complete as per scope of work, special conditions of contract and instructions of Engineer-in-charge. | Metre | 1000.00 | 7,637.55 | 76,37,550 |
| 10 | Fabrication and erection of lattice girders and all accessories including all lead, lift wastage, storing drilling holes, fixing in phases etc. and installation of accessories for joining the lattice girder segments as per approved workshop drawings of contractor & specification or as directed by Engineer. The rate shall include costs of all materials, labour, equipment etc. required for the complete job including additional cost for enlarging of heading footing. | MT | 72.00 | 12,264.08 | 8,83,013.76 |
| 11 | Supply of lattice girders and all accessories including all lead, lift, wastage, storing, drilling holes, fixing in phases etc. and installation of accessories for joining the lattice girder segments as per approved workshop drawings of contractor & specification or as directed by Engineer. The rate shall include costs of all materials, labour, equipment, etc. required for the complete job. | MT | 72.00 | 83,277.68 | 59,95,992.96 |
| 12 | Supply, drilling installation and grouting of 32mm dia Self Drilling bolts of the specified length Fy>=200KN (slope, tunnel support & face bolts) as per approved drawings & specification or as directed by Engineer. The rate shall include costs of all materials, labour, equipment, etc. required for the complete job. c) L = 9m | Each | 480.00 | 9,403.18 | 45,13,526.4 |
| 13 | SDA Bolts: Supply, drilling, Installation and grouting of 38mm dia Self-drilling anchor (SDA) bolts of the specified length, Fy >= 400 KN as per approved drawings & as per technical specification & conditions of contract with contractors men, material, consumables /including grout coupling), tools & plants. equipment's, machineries, including all lead & lifts, loading, unloading as directed by Engineer - in-Charge, etc complete. | Running Metre | 229370.00 | 1,392.55 | 31,94,09,193.5 |
| 14 | Fiber glass bolts: Supply, transporting to site, drilling, installation, testing and grouting of Fiber glass bolts of the specified length, 32/15, Yield load 500 KN (For Face Bolting) as per approved drawings and Specifications or as directed by Engineer, with contractors men, material, consumables, plants, equipments, machineries, including all lead & lifts loading , unloading etc required for the complete job. | Metre | 4320.00 | 1,289.74 | 55,71,676.8 |
| 15 | Shotcreting with designed mix cement concrete M 25 as per specification & drawings or as directed by Engineer in charge including all materials (excluding cement and steel fibers), labour, equipment all lead & lift etc. required for complete job (a)Face sealing, Filling of cavities, widening of top heading footing in tunnel. | cum | 3612.00 | 6,080 | 2,19,60,960 |
| 16 | Design mix cement concrete M15 or M 20 or M 25 in following RCC works excluding cement and including machine mixed machine batched, machine vibrated form work etc. a) Fill concrete in Tunnel | cum | 500.00 | 2,909.52 | 14,54,760 |
| 17 | Supply and installation of high strength steel reinforced synthetic geomat i.e. three dimensional erosion control mat made of polypropylene polymer having a minimum longitudinal tensile strength of 110kN/m, minimum ultimate punching force of 120kN to be applied to reinforce the slope to resist the ground forces. The reinforced geomat must have polypropylene filament extruded onto a mechanically woven double twisted hexagonal shaped steel wire mesh during manufacturing process for absolute homogeneity, over mesh wire dia. 2.7mm/3.7mm (ID/OD, as per IS 16014:2024) and maximum mesh opening of 8 x10 mm, wire coating Zn(95%)+Al(5%) with high abrasion resistant polymer coating having minimum 25 years of life for medium aggressive environmental level (C3) on the wire (as per IS 16014 :2024), interlaced with wire rope of 8 mm diameter during manufacturing process itself, having a minimum mass of 420 gm/sq.m. The requirement must comply to section 8.3.3 - iv of RDSO/2020/GE: IRS- 0004 (Comprehensive Guidelines and Specifications for Railway Formation). | Sqm | 15556.00 | 2,773.59 | 4,31,45,966.04 |
| 18 | Supply and application of High Performance-Flexible Growth Medium (HP-FGM) which is 100% biodegradable, composed of 100% recycled, thermally refined (within a pressurized vessel) virgin wood fibers, crimped interlocking biodegradable fibers, mineral activators, and wetting agents (including high-viscosity colloidal polysaccharides, crosslinked biopolymers and water absorbents) along with STANDARD prescriptive agronomic formulations such as fertilizer, extended-term dyes, soil pH modifiers, bio stimulant materials and seeds which is hydraulically-applied for Erosion control and faster growth of Vegetation as per secification. | Sqm | 14453.00 | 396.59 | 57,31,915.27 |
| 19 | Supply and application of Biotic Soil Media (BSM) - a combination of recycled Thermally Refined bark and wood fibers with a proprietary blend of biopolymers, biochar, seaweed extract, humic acid, endomycorrhizae and other beneficial constituents. All components of the Biotic Soil Media blend shall be of naturally derived and renewable, and engineered to optimize moisture retention, growth and establishment of vegetation. BSM is applied hydraulically over soil substrate to add organic matter so as to enrich soil nutrients prior to application of HP-FGM/BFM/ET-FGFM or other hydraulic erosion control mulch layers. as per BSM specifications along with standard prescriptive agronomic formulations such as fertilizer, extended-term dyes, soil pH modifiers, bio stimulant materials, seeds etc as as per secification. | Sqm | 14453.00 | 332.09 | 47,99,696.77 |
| 20 | Grouting (cement) for ground improvement or filling of voids and cavities using suitable materials and mixtures as appropriate. Rate is excluding cost of cement. | MT | 510.00 | 5,238.53 | 26,71,650.3 |
| 21 | Drlling of 40mm diameter holes in rock in shortcrete lining as weep hole relief holes of required length in any direction as per approved drawings & specification or as directed by Engineer. | Metre | 306.00 | 219.59 | 67,194.54 |
| 22 | Providing and installing of subsurface drain hole (horizontal/inclined) in the slope with perforated PVC pipe (lined with Geotextile) of 50 mm internal diameter complete. | RM | 24450.00 | 537.44 | 1,31,40,408 |
| 23 | Exploratory drilling & Drainage holes up to 35 m length, 10m overlay as per approved drawings & specification or directed by Engineer a) Horizontal/ Sub horizontal in all kind of rocks, Diameter equal or greater than 50mm | Metre | 378.00 | 1,026.16 | 3,87,888.48 |
| 24 | Drilling holes for different dia and upto 5.0 m deep inside concrete, shortcrete, rock for pressure / consolidation grouting with cement and additives at a pressure of upto 5.0 Kg per square cm, inside tunnels with contractors men, materials, consumables, tools and plants, equipment, machinery, including all lead and lift, unloading as directed by Engineer in Charge etc. complete. | RM | 500.00 | 376.3 | 1,88,150 |
| 25 | Rectification work inside a tunnel which involves dismantling of old concete in lining (m-25) or backfill conc.(M-20) from behind the ribs and cutting, dismantling of ISMB ribs/steel Bars/other steel sections used in tunnels etc. and removing the concrete debris / cut pieces of steel sections/other steel sections from the actual site of dismantle to outside the Tunnel. Dismantle of concrete in lining / back fill concrete. | cum | 3000.00 | 6,624.69 | 1,98,74,070 |
| 26 | Dismantling / Cutting of existing steel ISMB Ribs / other sections by any means, machineries (Everything will be arranged by contractor). Rate includes every arrangement including supporting system to save Tunnel etc. | MT | 100.00 | 11,083.61 | 11,08,361 |
| 27 | Supply, drilling hole, installation and grouting of pre-support elements (Pipe roofing) up to 139.7mm OD and up to 15m long with conventional drilling techniques at a shallow look out angle from the tunnel axis with specialised drill bit and casing systems providing direction control and installation accuracy as per approved drawings and Specifications or as directed by Engineer, with contractors men, material, consumables including grout coupling, plants, equipments, machineries, including all lead & lifts loading , unloading etc required for the complete job. a) Seamless pipe, OD 114.3mm, 6.3mm thick, Yield load >=1200KN | Metre | 37932.00 | 11,371.26 | 43,13,34,634.32 |
| 28 | Shotcreting with designed mix cement concrete M 25 as per specification & drawings or as directed by Engineer in charge including all materials (excluding cement and steel fibers), labour, equipment all lead & lift etc. required for complete job a)150 mm thick shotcrete lining in tunnel | Sqm | 10862.00 | 1,004.95 | 1,09,15,766.9 |
| 29 | Shotcreting with designed mix cement concrete M 25 as per specification & drawings or as directed by Engineer in charge including all materials (excluding cement and steel fibers), labour, equipment all lead & lift etc. required for complete job b)200 mm thick shotcrete lining in tunnel | Sqm | 20843.00 | 1,316.77 | 2,74,45,437.11 |
| 30 | "Shotcreting with designed mix cement concrete M 25 as per specification & drawings or as directed by Engineer in charge including all materials (excluding cement and steel fibers), labour, equipment all lead & lift etc. required for complete jobc)250 mm thick shotcrete lining in tunnel" | Sqm | 9648.00 | 1,542.16 | 1,48,78,759.68 |
| 31 | Shotcrete with designed mix cement concrete M-25...........etc (d)face sealing shotcrete of thickness 50 mm or more | Sqm | 51699.00 | 290.2 | 1,50,03,049.8 |
| 32 | Shotcreting with designed mix cement concrete M 25 as per specification & drawings or as directed by Engineer in charge including all materials (excluding cement and steel fibers), labour, equipment all lead & lift etc. required for complete job e) 100 mm/ 150 mm thick shotcrete in slope stabilization | cum | 200.00 | 6,393.46 | 12,78,692 |
| 33 | Design mix Cement Concrete M 30 in following RCC works including machine mixed, machine batched, machine vibrated form work etc. But excluding the cost of reinforcement & cement as per specifications drawings or as directed by Engineer in charge. a) Inner lining of main tunnel & niches with Movable Shutter with hydraulic moving and adjustment facilities. | cum | 5462.00 | 5,066.91 | 2,76,75,462.42 |
| 34 | Design mix Cement Concrete M 30 in following RCC works including machine mixed, machine batched, machine vibrated form work etc. But excluding the cost of reinforcement & cement as per specifications drawings or as directed by Engineer in charge. b) Inner lining of main tunnel & niches (invert) | cum | 2392.00 | 5,066.91 | 1,21,20,048.72 |
| 35 | Design mix Cement Concrete M 30 in following RCC works including machine mixed, machine batched, machine vibrated form work etc. But excluding the cost of reinforcement & cement as per specifications drawings or as directed by Engineer in charge. d)Drainage Gutter | cum | 242.00 | 4,889.6 | 11,83,283.2 |
| 36 | Machine mixed, Machine batched, design mix No-fines porous concrete in tunnel as per approved drawings & specifications, inclusive of cost of materials (cement to be paid separately), admixtures, plasticizers, machines, manpower, consumables, T&P , experts, supervision, all leads & lifts, wastages, handling, mixing, vibration, quality control, compaction, curing, testing, security, etc., complete as per scope of work, approved drawings & specifications, Special Conditions of Contract & instructions of Engineer-in-charge. | cum | 148.00 | 2,278.58 | 3,37,229.84 |
| 37 | Reinforced Cement Concrete M-30 (Design mix) in tunnels where cut and cover method is adopted and portals for all heights and depths above/ below ground level, Casting & curing footpath slabs (as drain covers in tunnels including cut & cover portion, leading and laying them in position on drains complete in all respects) as per approved drawings etc. with contractors own materials (including admixture & excluding supply of cement), labour, tools, plants and machinery including supplying, approved dimensional steel gentry type form work including fixing and removing of the same centering, scaffolding, shoring and timbering and such other measures as necessary, final rendering after striping off form work with all leads, lifts, ascents and descents etc. complete in all respects as per drawing and specifications and direction of the Engineer at site. The work includes cost of preparing concrete mix with weight batching, mechanical mixing, vibrating and designing the concrete mix etc. Payment for reinforcement including placing, cutting, bending, straightening, hooking shall be paid separately. | cum | 13740.00 | 4,083.12 | 5,61,02,068.8 |
| 38 | Providing and installing / laying PVC/HDPE pipes including junctions arrangements / special etc. as per approved drawings & specifications, inclusive of cost of materilas, wastage, storing, machines, manpower, consumables, T&P, experts, supervision, all leads & lifts, taxes etc., complete as per scope of work, special condition of contract & instruction of Engineer- in- charge. a) 50 mm internal diameter PVC pipe | Metre | 162.00 | 50.98 | 8,258.76 |
| 39 | Providing and laying of perforated pipe of following diameters as drainage pipe as per approved drawings & specification or as directed by Engineer b) 150mm diameter pipe | Metre | 661.00 | 205.33 | 1,35,723.13 |
| 40 | Providing, laying & fixing of Protective Felt (geotextile) with a minimum weight of 500 g/m2 for protection of the water proofing membrane & drainage on the finished outer lining surface | Sqm | 14827.00 | 258.91 | 38,38,858.57 |
| 41 | Providing, placing,welding of 2mm thick PVC or ECB water prooping membrane including the cost of materilas, labour,eqipments etc . Required for the completion of job as per specification or as directed by the engineer | Sqm | 15087.00 | 978.5 | 1,47,62,629.5 |
| 42 | PVC water stop serrated with central valve (225 mm wide, 8 - 11 mm thick) | Metre | 1218.00 | 225.93 | 2,75,182.74 |
| 43 | Earthing a) Longitudinal earthing flat bar,40x4 mm,Galvanized iron ,both sides of the tunnel | Metre | 1130.00 | 107.34 | 1,21,294.2 |
| 44 | Earthing b) transveral earthing flat bar,40x4 mm,Galvanized iron ,both sides of the tunnel,Every 250 m | Metre | 391.00 | 65.83 | 25,739.53 |
| 45 | Earthing c) connection bolts M8 with correspondent nuts and washers, made of brass | Each | 275.00 | 72.55 | 19,951.25 |
| 46 | Supply and mixing of steel fibre glued hooked end of circular cross section having diameter of 0.55 to 0.60mm & aspect ration ranges from 58 to 65 confirming to EC- certificate of conformity as per EN 14889 & Tensile strength more than 1100 Map & ultimate strain less than 4% as per specification and as directed Engineer. | Kg | 130140.00 | 98.28 | 1,27,90,159.2 |
| 47 | WS-29 Supplying, laying and joining 150mm diameter G.I. pipes (Vertically/horizontally) conforming IS 2329 1979 for water hydrant line and clamping the same with 2 nos (30mm x 6mm) M.S. plate fixed over rail post 3.00m apart. the rate include cost of all materials including cutting, welding, threading etc. M.S. clamp, nut and bolts fixing changes, labour, materials tools & plants complete in all respect as directed by the engineer | RM | 2000.00 | 2,306.78 | 46,13,560 |
| 48 | (USSOR-2010 256070) Miscellaneous G I pipe fittings as nipples/ elbows/ sockets/ bends for GI pipe work. | Kg | 1000.00 | 81.37 | 81,370 |
| 49 | WS-30 Supplying fitting and fixing G.I. Reducing Tee (150x150x40) mm with contractors own labour, materials, taxes, transportation charges, tools & plants etc. complete in all respect as per specification. | Each | 20.00 | 1,966.24 | 39,324.8 |
| 50 | WS-32 Supplying and fixing reinforced rubber hose pipe of 25/32mm inner diameter to suit 25mm diameter nipple of required length at each out let for carriage watering purpose. | RM | 351.00 | 275.08 | 96,553.08 |
| 51 | Providing high relief level Mural painting (including positive & negative space ) work with cement morter including design , creative ,invovlement, skill artisan, painting with special weather coast paints orbronze / brass mixed culture of Northeast India, Assam or India Railwayas per direction of Engineer in charge. | Sqm | 580.00 | 5,302.45 | 30,75,421 |
| 52 | SUPPLYING FITTING AND FIXING OF TOWEL RING (MAKE JAQUAR, ESCO & PERRYWARE) | Numbers | 30.00 | 2,153.08 | 64,592.4 |
| 53 | SUPPLYING FITTING AND FIXING OF TOWEL RACK (MAKE JAQUAR, ESCO & PERRYWARE) | Numbers | 30.00 | 4,566.29 | 1,36,988.7 |
| 54 | [Item Code: USSOR-2010 153380] Providing and fixing C P brass Soap dish holder having length of 138 mm, 102 mm wide, 75 mm high with concealed fittings arrangements weighing approx. 110 gms. | Each | 20.00 | 1,238.96 | 24,779.2 |
| 55 | Manufacturing, supplying & fixing of prefabricated RCC coping stone of size 530mm x 1125mm x 100mm thick as per top face designed and approved by site Engineer with M- 30 grade RCC with 8 mm dia. tor steel at 150mm c/c both ways sand manufactured by vibro compaction process using jointless FRP/GRP steel moulds of required size, shape & design. The item includes cost of cement, reinforcement, transportation etc. (Note :Under layer of cement mortar to be laid as per site conditions & should be paid for separately) | Each | 1112.00 | 1,372.69 | 15,26,431.28 |
| 56 | Supplying manufacturing, fitting and fixing in position of M-35 Grade precast RCC passengers platform wall as per NRHQE(P)s Drg number P-209-MS 2014 including the cost of cement Reinforcement (i.e cost also include scutting, hooking, bending and binding of reinforcement), centering, shuttering, finishing, admixtures in recommended proportion, to accelerate, retard, setting of concrete, cost of transportation loading unloading, x- ing of track nallah, etc. Rate also includes cost of hiring of Hydra crane, fuel, driver operator for unloading fixing of precast wall in true line and level as per direction of engineer or authorized representative. No extra payment will be given for any kind of taxes, royalties, etc. | Each | 1112.00 | 7,506.28 | 83,46,983.36 |
| 57 | Toughened glass 12 mm thick (DSR- 2023- item no. 8778) | Sqm | 284.00 | 2,669.21 | 7,58,055.64 |
| 58 | Supply of Micro Fine Cement (D95<15 Microns). | MT | 100.00 | 91,056.61 | 91,05,661 |
| Schedule total | ₹1,61,58,61,520.81 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2Index.pdf
ATTACHMENT
3.CheckList.pdf
ATTACHMENT
5.Appendix.pdf
ATTACHMENT
7.MainDOC.pdf
ATTACHMENT
8.CMB.pdf
ATTACHMENT
9MakeInIndia.pdf
ATTACHMENT
10MA.pdf
ATTACHMENT
11SpecialSpecification.pdf
ATTACHMENT
12AdditionalConditionofWork.pdf
ATTACHMENT
13PVCClausemain.pdf
ATTACHMENT
14FinalForms.pdf
ATTACHMENT
1.TopPage_1.pdf
ATTACHMENT
6GI_1.pdf
ATTACHMENT
4.NIT_2.pdf
ATTACHMENT
TenderNoticeT18_2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .