| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.8 LAccepted-AOC DAKRA RANCHI PIN 829201 | CHATRA | JHARKHAND | 829201 | L-1 | Accepted-AOC Accepted as L-1 Bidder basis IN OPEN TENDER ENQUIRY | |
| 2 | Rejected-Technical KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | - | Rejected-Technical Rejected as not L-1 | |
| 3 | Rejected-Technical SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | - | Rejected-Technical Rejected as not L-1 | |
| 4 | Rejected-Technical NEAR RADHA KRISHNA MANDIR VIKASH BHAWAN JAYANT SINGRAULI MP PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | - | Rejected-Technical Rejected as not L-1 |
Tender Value
₹8.5 L
EMD Value
₹10,700
Closing Date
8 May 2024, 11:00 amClosed
GENERAL MANAGER (EXCV), NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL,NIGAHI PROJECT, PO-NIGAHI, DISTT-SINGRAULI (MP) - 486884
Repairing / rebuilding , co-axial line boring and bush fitment of eyes / housing of boom assembly ( foot end) and housing of arm assembly ( boom arm joint end arm -bucket joint end) in PC 2000-8 Hydraulic Shovel ( SHRI LAXMAN) CIL No. EXC-3007 at Nig
2024_NCL_307175_1
NGH/EXCV/TENDERS/24-25/011
Open Tender
Excavation Department Work
Item Rate
25 days
NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹10,700
25 Oct 2024
27 Apr 2024
9 May 2024
27 Apr 2024
8 May 2024
28 Apr 2024
27 Apr 2024 - 2 May 2024
Amount
Scope of Work: (1) Removal of bucket from arm assembly. (2) Removal of both bucket cylinders. (3) Removal of both arm cylinders. (4) Removal of both boom cylinders. (5) Removal of all the hydraulic tubes mounted on arm assembly. (6) Lowering of arm assembly and boom assenbly. ( 7) Fitment of all the removed assemblies after being repaired.
Cost/ charges for dismantling and assembly as per socpe of work at Sl No. 02 including labour charges, contractor profit etc. (labour consisting of Skilled / Semi-Skilled and Un-skilled Helper manpower)
Scope of Work: (1) Re-building of both housing (LHS and RHS) of the arm assembly ( arm boom joint end) by welding and grinding. (2) Co-axial line boring of re-building arm assembly eyes LHS and RHS both (arm -boom joints end). (3) Bush fitment in bolth housing (LHS and RHS) of the arm assembly ( arm-boom joint end) (4) Re-building of both housings ( LHS and RHS) of the arm assembly ( arm-bucket joint end) by welding and grinding. (5) Co-axial line boring of both housing ( LHS and RHS) of the arm assmbly ( arm-bucket joint end) (6) Bush fitment in both housings ( LHS and RHS) of the arm assembly ( arm -bucket joint end) (7) Re-building of both housings ( LHS and RHS) of boom assembly ( foot end) by welding and grinding (8) Co-axial line boring of both housings ( LHS and RHS) of boom assembly ( foot end) (9) Bush fitment in both housings ( LHS and RHS) of the boom assembly ( foot end)
Cost/ charges for rebuilding of both housing ( LHS and RHS) by welding and griding of the arm assembly ( arm-boom joint end) by welding and grinding , both housings ( LHS and RHS) of the arm assembly ( arm - bucket joint end) and both housings ( LHS and RHS) of boom assembly ( foot end) including labour charges, contractor profit etc. (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled Helper manpower)
Charges for co-axial line boring of both housings of the arm assembly ( arm - boom joint end) original size dia 190mm, L-240mm for volum calculation D1 - 180mm, D2-190mm and L-240mm taking 5mm cut for line boring
Charges for co-axial line boring of both housings of the Arm ( Arm bucket joint end) original size dia 200mm, L-280mm for volum calculation D1 - 190mm, D2-200mm and L-280mm taking 5mm cut for line boring
Charges for co-axial line boring of both housings of the boom assembly ( foot end) original size dia -210mm , L-225mm for volum calculation D1 - 200mm, D2-210mm and L-225mm taking 5mm cut for line boring
Hire charges for welding machine 02 Nos. with all accessories for the all above mentioned job.
Hire charges for grinding machine 02 Nos. with all accessories for the all above mentioned job.
Hire charges for gas cutting set with all accessories for the all above mentioned job.
Total impact of GST for the purpose of CTC
VISHAL ENGINEERING WORKS
SHASHI ENGINEERING WORKS
SUNSHINE ENGINEERING
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .