Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.3 LAccepted-AOC CAMP JAYU MAJRI COLLIERY PO SHIVAJINAGAR TEHSIL BHADRAWATI DISTRICT CHANDRAPUR MS | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | L-1 | Accepted-AOC Work Awarded | |
| 2 | L-2₹4.5 L+₹15,209.61 (3.52%)Rejected-Finance | L-2 | Rejected-Finance Due to L-2 bidder. | |
| 3 | L-3₹6.1 L+₹1.8 L (40.5%)Rejected-Finance | L-3 | Rejected-Finance Due to L-3 bidder. |
Tender Value
₹6.7 L
EMD Value
₹8,400
Closing Date
24 Jun 2022, 12:00 pmClosed
Staff Officer (Civil), WCL, Majri Area.
At/Post Kuchana, Tahsil Bhadrawati, District Chandrapur (MS) 442503.
Making of shed under Chargaon-Telwasa Sub Area of Majri Area.
2022_WCL_246544_1
ma4450-civ-e023-2022-23/161 Dated 13.06.2022
Open Tender
Civil Works - Others
Item Rate
28 days
Chargaon-Telwasa Sub Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,400
18 Jul 2022
13 Jun 2022
25 Jun 2022
14 Jun 2022
24 Jun 2022
14 Jun 2022
14 Jun 2022 - 21 Jun 2022
Amount
Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil.All kinds of soil
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Brick work with common burnt clay FPS Non modular/cement bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Structural steel work in single setion, fixed with or without conneting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete (Labour Rate).
Fixing of corrugated G.S. sheet roofing including vertical/curved surfacefixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and GI limpet washers or with or with GI limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any any pitch in horizontal/vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and incoluding cutting to size and shape wherever required. 0.63mm thick with zinc coating not less than 275 gm/m2 (Labour Rate).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work.
Applying priming coat : With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works.
Carriage of Earth/OB by mechanical means including loading unloading and stacking with a lead of 2 Kms etc. complete as per instruction of Engineer-in-charge.
Total impact of GST for the purpose of CTC
VISHWARANJAN KUMAR SINGH
PRASHANT RAMBHAU PETKULE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .