| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹5.5 L+₹28,367.20 (5.42%)Accepted-Finance 01 AGNI AUTOMATION AND SECURITY 01 KUNDAN BHAWAN SHIVAM VIHAR COLONY OPP KIET ENGG COLLEGE MURADNAGAR GHAZIABAD 201206 U P INDIA MURADNAGAR | GHAZIABAD | UTTAR PRADESH | 201206 | L2 | Accepted-Finance Ok |
Tender Value
Refer Docs
EMD Value
₹11,500
Closing Date
3 Oct 2023, 2:30 pmClosed
EE (EnM) HP-II
OFFICE OF THE EXECUTIVE ENGINEER (EnM) HP-II DELHI JAL BOARD GOVT OF NCT OF DELHI HAIDER PUR WATER WORKS, DELHI 110085
S/I/T/C of HPL make 1000 Amp. ACBs in LT Panels of Delhi Cantonment BPS.
2023_DJB_248002_8
NIT 06 (2023-24) HP-II
Open Tender
Miscellaneous Works
Item Rate
60 days
DJB, WTP Haiderpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DELHI JAL BOARD
₹11,500
6 Oct 2023
25 Sept 2023
3 Oct 2023
25 Sept 2023
3 Oct 2023
25 Sept 2023
Air Circuit Breaker, 3 Pole, 415 V, AC of Rating 1000 Amperes, EDO type, with microprocessor release with Under Voltage Release. Make - HPL
Charges for replacement/ retrofitting/ installation of 1000 Amp. ACB as above as per the details of work as per details below: - Dismantling the existing complete outgoing ACBs from the chambers of the main LT Panel including its housing, cradles and disconnecting the bus bar connections with the incoming supply and disconnecting outgoing connections as per the availability of shutdown at site. Making and supply of MS angle iron based supports of size as suitable to the mounting of new ACB. Fixing of the same at the panel chamber as suitable for installation of the new ACB/ their cradles. Making and supply of new panel door made out of 16 SWG CRCA sheet duly painted with powder coating process of suitable size and cut out as suitable to the new ACB. Fixing the new door at the chambers of the panel along with all the required accessories after dismantling the old door. Installation of the new ACB cradle in the panel by the help of nuts, bolts etc. in proper alignment for connecting the bus bars. Fixing the ACB in the cradle and making control wiring connections for the ACBs. Making provisions for outgoing supply of the new 1000 Amp. ACB by rearrangement/ modification/ addition of bus bar lengths in Aluminium as required.
Charges for making ACB functional/ energizing ACBs in the panel including works as per below: - Making the required wiring connections for the electrical operation of the ACB with TNC Switch as required. Making the outgoing connections of the new ACB by connecting cables including making end termination joints of cable as required. Making all required control wiring connections for energizing the new ACB.
Charges for restoration of the protection system in the panel including works as below: - Making wiring connections of the new ACB/ tripping coil with the protection replays for provisioning of ACB tripping as required. Checking configuration of relays and setting up tripping range for ACBs as per load requirement.
Testing & commissioning charges including testing for the operations etc. for the new ACBs, testing for the electrical operations and carrying out other required testing after installation and other works as above.
AGNI AUTOMATION AND SECURITY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .