Loading…
Loading…
Tender Value
₹38.7 Cr
EMD Value
₹48.7 L
Closing Date
9 Sept 2026, 5:00 pm4d left
SM_TENDER CELL
GNIDA OFFICE
Construction of Main RCC Drain with Cover of 60Mtr. and 45Mtr. Wide Road Sector Kappa 2 (Multi Modal Logistics Park), Greater Noida.
2026_GNIDA_1179266_20
SM/(E-TENDER CELL)/2026/800 DATED-22.08.2026
Open Tender
Civil Works
Percentage
547 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹6,770
₹48.7 L
27 Aug 2026
27 Aug 2026
11 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BOQ | - | - | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. | - | - | - | - |
| - | Depth (0.0 - 1.50) mtr | 37,774.14 | Cum | 141.4 | ₹53,41,263.4 |
| - | Depth (1.50 - 3.0) mtr | 7,238.44 | Cum | 201.8 | ₹14,60,717.19 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: | - | - | - | - |
| - | 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 2,306.68 | Cum | 6,548 | ₹1,51,04,140.64 |
| 3 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.
(Note :- Cement content considered in this item is @ 330 kg/cum.Excess/less cement used as per design mix is payable/recoverable | - | - | - | - |
| - | All work up to Plinth level. DSR-23/5.33.1 | 17,874.04 | Cum | 8,512.65 | ₹15,21,55,446.61 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | - | - | - | - |
| - | Thermo-Mechanically Treated bars of grade Fe-500D or more. (Sail Steel) (DSR-2018/5.22.6/AR) | 18,01,762.06 | Kg | 80.15 | ₹14,44,11,229.11 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.68 MB
8003.pdf
Additional Documents • 0.40 MB
BOQ_2217379.xls
BOQ • 0.25 MB
PreQ_Con_RCC_Drain_Cover_60MTR_MMLP_Sector_Kappa2.pdf
Tender Documents • 1.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .