Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹17.0 L+₹2.5 L (17.4%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
8 May 2024, 5:00 pmClosed
Superintending Engineer
EDC, Ayodhya
Increasing Capacity of Transformers at Different Capacity and Different Places and Construction of Transformer Plinth and Fencing Under Electricity Distribution Division-Ist Ayodhya
2024_MVVNL_923022_1
204 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EDC
₹17,000
13 Jun 2024
24 Apr 2024
9 May 2024
24 Apr 2024
8 May 2024
24 Apr 2024
Amount
Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 20 Kms. (distance approx)
PCC Pole 8.5 Mtr. long
S.T. Pole 11 Mtr. long
L.T. Cable AL. 1x240 sqmm
L.T. Cable 1x400 sqmm
ACSR Weasel Conductor
T/F 25 KVA
T/F 63 KVA
T/F 100 KVA
T/F 250 KVA
Three Phase D- Box
Other matching Materials
Dragging of ST/PCC Pole from dump site to pit site
Fabrication and Errection of Single Pole Support on ST/PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Double Pole Support on ST/PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, Binding and jumpering of ACSR Conductor as per RESSPO Norms
Stringing, Sagging, Binding and jumpering of AB Cable (3x95+1x70+1x16) sqmmq Conductor as per RESSPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 100 KVA Transformer as per RESSPO Norms.
Mounting of 250 KVA Transformer as per RESSPO Norms.
Construction of Transformer Plinth including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
Fencing of Transformer Plinth with the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc.
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Chemical Type Earthing As Per ReSSPO Norms
Installation of Three Phase D- Box
Supply of Copper L Piece T/F
Supply of Aluminum Lug (Long Barrel)
Supply of Holding Clamp with Nut and Bolt
Supply of Tainless unit
Supply of Nut & Bolt
Supply of I Hook
Supply of LT Suspension Clamp
Supply of luminium lug for 240 sqmm
Supply of luminium lug for 150 sqmm
Supply of Aluminium lug for 25 KVA Transformer
Supply of Stay Insulator
Rect. Back old and used 10 KVA T/F
Rect. Back old and used 16 KVA T/F
Rect. Back old and used 25 KVA T/F
Rect. Back old and used 63 KVA T/F
Rect. Back old and used 100 KVA T/F
Hindustan Electric Work
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .