Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.5 L
EMD Value
₹2,960
Closing Date
13 Oct 2026, 6:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Consruction of P Work near Ashok Kumar Mohalla Pla pari W No. 4 Pyt Distt REASl under CDF scheme for the year 2026-27.
2026_RDPR_327300_1
e_NIT No. 262 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
GARl JlJ BAGLl
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,960
6 Oct 2026
6 Oct 2026
14 Oct 2026
6 Oct 2026
13 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge All kinds of soil | 4.42 | cum | 479.3 | ₹2,118.51 |
| 2 | Providing and laying dry stone Aggregate of 40mm nomminal size in foundation and Plinth including all leads, lift and carriage complete | 1.1 | Cum | 1,500 | ₹1,650 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 11.23 | cum | 5,734.6 | ₹64,399.56 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 14 | kg | 2,793.8 | ₹39,113.2 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 9.67 | sqm | 286.35 | ₹2,769 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) attached pilasters, buttresses, plinth and string courses etc. | 22.03 | sqm | 286.18 | ₹6,304.55 |
| 7 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge lumsump rate Rs 3000 | 1 | No. | 3,000 | ₹3,000 |
| 8 | Carriage of cement from an avg. distance of 20 K.M by MT & 3000 by AT | 2.75 | MT | 704 | ₹1,936 |
| 9 | Carriage of Sand from an avg. distance of 20 K.M by MT & 3000 by AT | 5.76 | cum | 1,003.82 | ₹5,782 |
| 10 | Carriage of Aggregate below 40 mm from an avg. distance of 20 K.M by MT & 3000 by AT | 11.4 | cum | 1,003.82 | ₹11,443.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_1107300.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .