| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Finance BHONDE 20 SHYAM DHAM COLONY SHANIDEV ROAD RUNAKTA AGRA | AGRA | AGRA | UTTAR PRADESH | 282007 | -1.72% | ₹15.6 L | L1 | Admitted-Finance |
| 2 | L2₹16.9 LAdmitted-Finance 5 SYNDICATE BANK COLONY GALIANA ROAD AGRA | AGRA | AGRA | UTTAR PRADESH | +6.88% | ₹16.9 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 110 SILVER STATE COLONY RUNKATA AGRA | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15 L
EMD Value
₹15,500
Closing Date
22 May 2026, 4:00 pmClosed
SE ECC(D)Agra
220 KV Sub Station 64 Khamba Sikandra Agra
HORTICULTURE AND LANDSCAPING WORK AT MD S OFFICE VIDYUT COLONY PREMISSES 220 KV SUB STATION BYE RASS ROAD, SIKANDRA AGRA
2026_DVVNL_1148943_1
04/ECC(D)Ag/2026-27
Open Tender
Civil Works
365 days
SE ECC(D)Agra
As Per Tender Documents
3 documents required · 3 mandatory
₹3,540
DVVNL
₹15,500
19 Jun 2026
15 May 2026
23 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking of good earth at site including carriage excluding Royalty upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). 2.2 DSR H&L. | 18.66 | cum | 468.68 | ₹8,745.57 |
| 2 | Supplying and stacking sludge at site excluding royalty and including carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment). 2.3 DSR H&L. | 10.73 | cum | 189.25 | ₹2,030.65 |
| 3 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : 2.4 DSR H&L.
2.4.1 Screened through sieve of I.S. designation 20 mm. | 85.85 | cum | 253.9 | ₹21,797.32 |
| 4 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). 2.8 DSR H&L. | 115.24 | cum | 52.3 | ₹6,027.05 |
| 5 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge 2.9 DSR H&L. | 116.24 | cum | 36.51 | ₹4,243.92 |
| 6 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). 2.10 DSR H&L.
2.10.1 In rows 5 cm apart in both directions . | 200 | sqm | 17.68 | ₹3,536 |
| 7 | Renovating lawns including weeding, cheeling the grass, forking the ground, top dressing with sludge or manure, mixing the same with forked soil, watering and maintaining the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for mowing and disposal of rubbish as directed, including supplying good earth if needed (the cost of sludge, manure and the good earth shall be paid for separately). 2.11 DSR H&L. | 200 | sqm | 34.37 | ₹6,874 |
| 8 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) 2.14 DSR H&L.
2.14.2 Holes 90 cm dia, and 90 cm deep. | 10 | Each | 142.96 | ₹1,429.6 |
| 9 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) 2.14 DSR H&L.
2.14.3 Holes 60 cm dia, and 60 cm deep. | 10 | Each | 43.71 | ₹437.1 |
| 10 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) 2.14 DSR H&L.
2.14.4 Holes 45 cm dia, and 45 cm deep. | 20 | Each | 18.68 | ₹373.6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
TenderDocuments_Affidavite2026.pdf
Tender Documents • 0.19 MB
TenderDocuments_Anti Profiting Clouse1.pdf
Tender Documents • 0.16 MB
TenderDocuments_PQCHorticulture.PDF
Tender Documents • 0.86 MB
TenderDocuments_Special Condition Lawn2026.pdf
Tender Documents • 0.65 MB
TenderDocuments_Tender Document.pdf
Tender Documents • 0.37 MB
BOQ_2150704.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid