Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | -22.20% | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹11.6 L (3.65%)Admitted-Finance | -19.36% | ₹3.3 Cr+₹11.6 L (3.65%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹45.4 L (14.3%)Admitted-Finance R O SABOO | -11.11% | ₹3.6 Cr+₹45.4 L (14.3%) | L3 | Admitted-Finance |
| 4 | L4₹3.7 Cr+₹47.9 L (15.0%)Admitted-Finance | -10.50% | ₹3.7 Cr+₹47.9 L (15.0%) | L4 | Admitted-Finance |
| 5 | L5₹3.7 Cr+₹50.0 L (15.7%)Admitted-Finance | -10.00% | ₹3.7 Cr+₹50.0 L (15.7%) | L5 | Admitted-Finance |
Tender Value
₹4.1 Cr
EMD Value
₹8.2 L
Closing Date
23 Jun 2026, 4:00 pmClosed
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer PWD Rnb division Leh
Construction of School building at Middle School Gompa Leh ( Under Distt Capex )
2026_PWD_19042_2
E Tender 29 of R and B Division Leh
Open Tender
Civil Works - Others
Percentage
1095 days
LEH
Please refer Tender documents.
10 documents required · 10 mandatory
₹3,000
Executive Engineer PWD Rnb division Leh
₹8.2 L
3 Jul 2026
9 Jun 2026
25 Jun 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 923.1 | cum | 208.42 | ₹1,92,392.5 |
| 2 | Hard rock ( Blasting prohibated ) | 2,153.9 | cum | 1,095.42 | ₹23,59,425.14 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m. All kinds of soil. | 89.14 | cum | 278.09 | ₹24,788.94 |
| 4 | Hard rock Hard rock ( Blasting prohibated ) | 207.98 | cum | 1,216.02 | ₹2,52,907.84 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 923.1 | cum | 220.4 | ₹2,03,451.24 |
| 6 | Dumping stone in horizontal level including cost of stone . | 116.89 | cum | 953.02 | ₹1,11,398.51 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 32.7 | cum | 5,725.33 | ₹1,87,218.29 |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished 50 mm thick with 20 mm nominal size stone aggregate | 410.12 | sqm | 564.44 | ₹2,31,488.13 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 101.07 | cum | 9,557.33 | ₹9,65,959.34 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 11,102.31 | ₹11,091.21 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_45407.xls
BOQ • 0.39 MB
cog16.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .