Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.1 L+₹1,640.25 (0.27%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.2 L+₹8,203.35 (1.35%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹6.2 L+₹11,025.90 (1.81%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹6.5 L+₹41,018.77 (6.73%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SSSR GROUPS L7 | Sujith Construction L9 | SETTU BOOTHAL CONTRACT WORKS L10 | KP CONSTRUCTIONS & BUILDERS L2 | SRI VINAYAGA CONSTRUCTION L5 | Seerangamuthu L4 | AVS BUILDERS AND CONSTRUCTION L3 | Muniappan Contractor L6 | M R BUILDERS L1 | LAKSHMI ROADS AND INFRA L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Compound wall at PUES Kamaraj Nagar H-o Jakkasamuthiram | |||||||||||||
| 2.00 | Earth work Excavation for foundation in all soil and sub-soil upto 0.30m depth etc. complete as per SS 20B. For column Grade beamD/F Column, Gate column | 36.86 | m3 | 385 ₹14,191.1 | 260 ₹9,583.6 | 260 ₹9,583.6 | 195.8 ₹7,217.19 | 208.43 ₹7,682.73 | 195 ₹7,187.7 Lowest | 197.91 ₹7,294.96 | 213 ₹7,851.18 | 195.28 ₹7,198.02 | 252 ₹9,288.72 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete For column, Grade beam,D/F Column, Gate column | 4.93 | m3 | 5,280 ₹26,030.4 | 5,800 ₹28,594 | 5,800 ₹28,594 | 4,020.3 ₹19,820.08 | 4,279.5 ₹21,097.94 | 4,253 ₹20,967.29 | 4,063.5 ₹20,033.06 | 4,649 ₹22,919.57 | 4,009.5 ₹19,766.84 Lowest | 5,500 ₹27,115 |
| 4.00 | RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete. Column pedestel, Trapizadal (0.90x0.90)+(0.30x0.30)/2, Column base upto GL, Grade beam, Column Superstructure
Gate Pillar
Column pedestel, Trapizadal (0.90x0.90)+(0.30x0.30)/2, Column base upto GL, Grade beam, Column Superstructure | 18.08 | m3 | 9,850 ₹1,78,088 | 9,300 ₹1,68,144 | 9,300 ₹1,68,144 | 9,306.25 ₹1,68,257 | 9,906.25 ₹1,79,105 | 6,998 ₹1,26,523.84 Lowest | 9,406.25 ₹1,70,065 | 7,651 ₹1,38,330.08 | 9,281.25 ₹1,67,805 | 9,050 ₹1,63,624 |
| 5.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. Column upto GL, Grade Beam, Gate pillar | 66.86 | m3 | 485 ₹32,427.1 | 550 ₹36,773 | 550 ₹36,773 | 461.59 ₹30,861.91 | 491.35 ₹32,851.66 | 410 ₹27,412.6 Lowest | 466.55 ₹31,193.53 | 449 ₹30,020.14 | 460.35 ₹30,779 | 531 ₹35,502.66 |
| 6.00 | Column Gate pilar | 43.44 | m3 | 565 ₹24,543.6 | 1,095 ₹47,566.8 | 1,095 ₹47,566.8 | 483.93 ₹21,021.92 | 515.13 ₹22,377.25 | 821 ₹35,664.24 | 489.13 ₹21,247.81 | 898 ₹39,009.12 | 482.63 ₹20,965.45 Lowest | 1,062 ₹46,133.28 |
| 7.00 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 1.5 | mt | 82,500 ₹1,23,750 | 92,000 ₹1,38,000 | 92,000 ₹1,38,000 | 58,071 ₹87,106.5 | 61,815 ₹92,722.5 | 69,000 ₹1,03,500 | 58,695 ₹88,042.5 | 75,440 ₹1,13,160 | 57,915 ₹86,872.5 Lowest | 89,240 ₹1,33,860 |
| 8.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete Brick, D/F Column, D/F Open, Deduct gate column | 5.09 | m3 | 7,250 ₹36,902.5 | 6,200 ₹31,558 | 6,500 ₹33,085 | 5,062.6 ₹25,768.63 | 5,389 ₹27,430.01 | 4,610 ₹23,464.9 Lowest | 5,117 ₹26,045.53 | 5,040 ₹25,653.6 | 5,049 ₹25,699.41 | 5,962 ₹30,346.58 |
| 9.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete Brick, D/F Column, D/F Open, Deduct gate column | 88.34 | m2 | 285 ₹25,176.9 Lowest | 800 ₹70,672 | 800 ₹70,672 | 893.4 ₹78,922.96 | 951 ₹84,011.34 | 600 ₹53,004 | 903 ₹79,771.02 | 656 ₹57,951.04 | 891 ₹78,710.94 | 776 ₹68,551.84 |
| 10.00 | Plastering with cm 1:5 mix ( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.Brick, Column Projection, Deduct gate Open, Gate pilar | 267 | m2 | 295 ₹78,765 | 280 ₹74,760 | 280 ₹74,760 | 178.68 ₹47,707.56 | 190.2 ₹50,783.4 | 215 ₹57,405 | 180.6 ₹48,220.2 | 235 ₹62,745 | 178.2 ₹47,579.4 Lowest | 277 ₹73,959 |
Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
30 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP
The Block Development Office, Karimangalam
Can be seen in the tender documents
2026_RDTN_705523_1
Roc.No.1002-2026-A2 dt 15.09.2026
Open Tender
Civil Works
Item Rate
The Block Development Office, Karimangalam
Tender Document
3 documents required · 3 mandatory
₹0
₹9,000
Yes
Karimangalam
23 Oct 2026
17 Sept 2026
30 Sept 2026
17 Sept 2026
30 Sept 2026
17 Sept 2026
17 Sept 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Compound wall at PUES Kamaraj Nagar H-o Jakkasamuthiram | - | - | - | - |
| 2 | Earth work Excavation for foundation in all soil and sub-soil upto 0.30m depth etc. complete as per SS 20B. For column Grade beamD/F Column, Gate column | 36.86 | m3 | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete For column, Grade beam,D/F Column, Gate column | 4.93 | m3 | - | - |
| 4 | RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete. Column pedestel, Trapizadal (0.90x0.90)+(0.30x0.30)/2, Column base upto GL, Grade beam, Column Superstructure
Gate Pillar
Column pedestel, Trapizadal (0.90x0.90)+(0.30x0.30)/2, Column base upto GL, Grade beam, Column Superstructure | 18.08 | m3 | - | - |
| 5 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. Column upto GL, Grade Beam, Gate pillar | 66.86 | m3 | - | - |
| 6 | Column Gate pilar | 43.44 | m3 | - | - |
| 7 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 1.5 | mt | - | - |
| 8 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete Brick, D/F Column, D/F Open, Deduct gate column | 5.09 | m3 | - | - |
| 9 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete Brick, D/F Column, D/F Open, Deduct gate column | 88.34 | m2 | - | - |
| 10 | Plastering with cm 1:5 mix ( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.Brick, Column Projection, Deduct gate Open, Gate pilar | 267 | m2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.53 MB
P.pdf
Additional Documents • 0.56 MB
T.pdf
Tender Documents • 0.73 MB
BOQ_848002.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .