| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.8 LAccepted-AOC NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹92.9 L+₹4.5 L (5.06%)Rejected-Finance A 14 USHA SADAN NEAR POST OFFICE COLABA MUMBAI 05 | MUMBAI | MUMBAI | MAHARASHTRA | 400005 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹97.5 L+₹9.1 L (10.3%)Rejected-Finance FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L3 | Rejected-Finance Other than being lowest | |
| 4 | L5₹98.5 L+₹10.1 L (11.4%)Rejected-Finance FLAT NO 002 MAHAVIR VILLA CHS LTD PLOT NO 259 SECTOR 21 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L5 | Rejected-Finance Other than being lowest | |
| 5 | L5₹1.0 Cr+₹11.8 L (13.4%)Rejected-Finance NOT AVAILABLE | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
3 Jan 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
SPECIAL REPAIRS TO EXTERNAL SURFACES AND CHAJJAS OF PO 16 BUILDING AT WNC O MESS UNDER GE (NW) NOFRA COLABA MUMBAI
2021_MES_490787_1
8705/CWE(NW)MUMBAI/E8
Open Tender
Civil Works
Item Rate
270 days
GE (NW) NOFRA
Class B
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) NOFRA
₹1.9 L
Yes
1 Feb 2022
26 Nov 2021
5 Jan 2022
26 Nov 2021
3 Jan 2022
20 Dec 2021
26 Nov 2021 - 18 Dec 2021
Amount
Demolition of reinforcement cement concrete as in roofs, floor (other than ground floor), beams, stair case, landing, chajja and other similar suspended work etc including removing of debris outside MD land complete all as specified and as directed by Engr-in-Charge. Note: - (i) Contractor should take all safety precaution and ensure no damage to inside building.(ii) Green cloth is required to cover external faces during repair work.(iii) Steel Scaffolding shall be used whereever scaffolding is required. (iv) Safety net shall be provided during construction.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for Taking down plaster in cement mortar/Plaster of any description etc including removing debris outside MD land complete all as specified and directed by EIC.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for TMT CRS bars 10mm dia & over, cut to length ,bent to shape required including cranking, bending , hooking ends and binding with and including mild steel wire (annealed) not less than 0.90mm dia.including necessary scaffolding etc complete all as specified and directed.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for TMT CRS bars 6-8 mm dia & over, cut to length ,bent to shape required including cranking, bending , hooking ends and binding with and including mild steel wire (annealed) not less than 0.90mm dia. including necessary scaffolding etc complete all as specified and directed.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for Fusion bonded Epoxy coating to reinforcement TMT Bars of any dia 9 to 10 sqm/kg complete all as specified and as directed by Engineer-in-Charge.
Material and labour for Building up the profile of structural members by using latex additives(MONOBOND) modified air cured mortar system (Polymer modified mortar) (1:5:15 = 1 monobond-5Cement-15 sand) -in damaged areas in 30mm thickness including leveling profiling etc complete all as specified and as directed by Engineer-in-Charge.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for Clean existing reinforcement with wire/rotary wire brush, making the surfaces free from loose material dirt etc, complete, applying two coats of alkaline rust converting primer FEOVERT confirming to ASTM-B-117, on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, with time interval of 6 hour between the coats and applying protective coating IPNET-RB complete all as specified and as directed by Engineer-in-Charge.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for Providing and applying structural grade EPIBOND-21-LP prior to application of any type of mortar plaster confirming to ASTM-C-882-91 (Arizona Slant Shear Test) to ensure bond between old concrete and new concrete complete all as specified and directed.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for M30 (design mix) (using 20 mm graded stone aggregate) as in chajjas etc complete all as specified and as directed by Engineer-in-Charge.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Use and waste of formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressum-mers, lintels, cantilevers, shelves including supports, overhangs, etc. also splays between floors and beams, etc complete all as specified and as directed by Engineer-in-Charge.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for brick work built in cement mortar 1:4 with sub class B bricks straight or curved on plan exc 6m mean radius etc including dismantling complete all as specified and as directed by Engineer-in-Charge.
Material and labour for 20 mm thick plastering in cement and sand mortar (1:4) in 2 coats (15mm thick backing coat and 5mm thick setting coat) mixed with water proofing compound 3% of cement on fair faces of brick work or concrete surfaces,at any height including erection of steel scaffolding, rendering is to be finished even and smooth(without using extra cement) complete all as specified (WPC shall be measured and paid separately). Note:- (i) Contractor should take all safety precaution and ensure no damage to inside building structure with using steel scaffolding.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Supply only integral water proofing compound, ISI Marked.
Material and labour for Plastering 10mm thick in CM (1:3) on concrete surfaces of ceiling at any height including erection of steel scaffolding, finished even & smooth with out using extra cement complete all as specified and as directed by Engineer-in-Charge.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for Preparation of new plastered/concrete surfaces of walls applying two coats of exterior acrylic emulsion (weather proof treatment) over one coat of primer, complete all as specified and as directed ( The tint and shade be as approved by the GE) The treatment shall be carried out by the authorised applicator of the firm and at any height including necessary scaffolding etc complete all as specified and as directed by the Engineer-in-Charge.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for Preparation of old plastered/concrete surfaces of walls applying two coats of exterior acrylic emulsion (weather proof treatment) over one coat of primer, complete all as specified and as directed ( The tint and shade be as approved by the GE) The treatment shall be carried out by the authorised applicator of the firm and at any height including necessary scaffolding etc complete all as specified and as directed by the Engineer-in-Charge.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
Material and labour for preparation of old plastered or unplastered surfaces of wall and apply two coat of oil bound distemper on wall over a coat of primerall as specified and directed
Material and labour for preparation of old plastered surfaces of ceiling and applying two coats of oil bound distemper etc complete at any height including necessary scaffolding all as specified and as directed.
Material and labour for preparation of old steel surfaces and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and as directed by Engineer-in-Charge.
Material and labour Preparation of old painted wooden surfaces of any description over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engineer-in-Charge.
Material and labour for applying texture paint of 4mm thick of desired finish as approved by GE over a coat of exterior wall primer which includes preparation of newly plastered surfaces/old decorated surfaces, cleaning of loose paint , grease , growth of fungus, algae or moss by using wire brushing and watering and applying two coats of exterior emulsion paint complete all as specified and directed.
Hacking out old broken glass (any thickness, size) from wooden/ aluminium frames glazed with putty or fixed with beads complete all as specified and as directed by the Engineer-in-Charge.
Supply and fixing IInd Class Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints, supplied and fixed complete all as specified and directed
S&F 5.5 mm thick sheet glass ordinary quality and glazing with oil putty in square exc 0.5Sqm in each pane complete all as specified and as directed by the Engineer-in-Charge.
S&F 3mm thick one side ground or obscured or frosted glass sheet ordinary quality and glazing with oil putty/ wooden beading n.exc 0.5Sqm in each pane complete all as specified and as directed by Engineer-in-Charge.
Material and labour for Removing of dismantled material / debris etc outside MD land exceeding 5 Km.
Taking down CI/rain water (PVC)pipes (any size or pattern) including all fittings, heads, shoes, bends, swan necks, etc., including cleaning etc complete all as specified and as directed by the Engineer-in-Charge.
S&F 160 mm dia PVC (SWR) pipes single socketed in any lengthwith rubber rings joints fixed to walls, complete all as specified and as directed by the Engineer-in-Charge.
S&F 160 mm dia PVC (SWR) bends/shoes any radius, complete all as specified and as directed by the Engineer-in-Charge.
S&F CI soil, waste pipe 100mm dia sand cast iron any length with or without ears with cement joint fixed to wall complete all as specified and as directed by the Engineer-in-Charge.
S&F CI bends /Tee 100mm dia long dismantling pieces of tapers large bore measures fited with oval access door complete all as specified and as directed by the Engineer-in-Charge.
S&F CI branch/connecter pieces 100mm dia complete all as specified and as directed by the Engineer-in-Charge.
S&F CI soil waste pipe 75mm dia sand cast iron any length with or without ears with cement joint fixed to wall complete all as specified and as directed by the Engineer-in-Charge.
S&F CI bends /Tee 75mm dia long dismantling pieces of tapers large bore measures fited with oval access door complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for vitrified tiles 10mm thick (square/rectangular ) area of each tile exceeding 0.18 SQM but not exceeding 0.38 SQM, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match, to existing over and including 15mm thick screed bed in CM 1:6, complete all as specified and as directed.
Material and labour M S Framed work such as grills, Railing, etc., with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe 290 Gde E-165, frame work to be fitted/welded with MS plate/embeded in concrete or brick work at any height etc complete all as specified and directed by E in C.
Material and labour for Plastering 15mm thick in CM (1:4) on concrete/brick masonary surfaces of wall at any height including scaffolding, finished even & smooth with out using extra cement complete all as specified and as directed by Engineer-in-Charge.
Preparation of new plastered or unplastered surfaces and apply two coat of oil bound distemper on wall over a coat of primer all as specified and directed
Material and labour Pre-painted galvatume aluminium zinc coating GI based corrugated steel sheet 0.5mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall,fixed with self tapping screws as specified. (note- Moulded of sheet as per requirement is incl in rate)
Material and labour for vitrified tiles 10 mm thick square/rectangular) area of each tiles exceeding 0.18 SQM but not exceeding 0.38 SQM, laid on vertical surfaces such as Dado/skirting including 10mm thick backing layer in CM 1:4, etc complete all as specified and as directed by Engr-in-Charge.
Material and labour 18-20mm thk Granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cills, platforms and like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with shade of granite etc complete all as specified
Material & labour for repair to damaged surface of RCC elements like beams, columns, wall by removing all loose cement plaster/concrete, providing and laying of microconcrete at least upto 20mm thickness (average) by using the recommended water powder ratio (mix the microconcrete with pan mixer as per manufacturer's instruction) including watertight shuttering & necessary curing for 7 days complete all as specified and directed by Engineer-in-Charge. Note : The work shall be carried out through authorised applicator of Dr Fixit/Build Ultratech/ACC/Pidilite as approved by GE
Material and labour for prerparation of new plastered surface by applying two coats of oil bound distemper over a coat of alkali resistant primer and 3mm thk wall care putty on ceiling etc complete all as specified and directed.
(a) Height upto and including 4th Floor
(b) Height from 5th floor to, upto and including 6th floor
S S ENTERPRISES
RAMESH ENTERPRISES
RAJENDRA CONSTRUCTION
SHREE JAGDISH FURNITURE CO.
DHARICHHAN ENTERPRISE
Shetty Construction Co
Garima Construction Co
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .