Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.7 L+₹8,879.91 (1.93%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.3 L+₹70,204.92 (15.3%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹6.0 L
EMD Value
₹59,594
Closing Date
18 Sept 2026, 5:00 pmClosed
ExecutiveOfficer
Npp Tilhar
Plastering, whitewashing, and paint work behind the municipality shops near the waterworks campus.
2026_DOLBU_1182327_32
1122/ETENDER/2026-27
Open Tender
Civil Works
Percentage
90 days
Npp Tilhar
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
Yes
Npp
₹59,594
Yes
7 Oct 2026
5 Sept 2026
19 Sept 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | M/150 class brick work in 1:4 cement and coarse sand mortar including supply of all mat. Lab. T&p etc. reqd. for prop. Comp. of the work…all comp. S.O.R. NO. 305 | 8.97 | /m3 | 5,430 | ₹48,707.1 |
| 1.02 | Concrete with 4cm. Gauge brick ballast fine sand and cement in prop. Of 1:4:8 including supply of all mat. Lab. T&P all com. S.O.R. NO. 275 | 1.5 | /m3 | 3,700 | ₹5,550 |
| 1.03 | 12mm. Thick plaster in 1:4 cement and fine sand mortar including all mat. Lab. T&P etc……all comp. S.O.R NO. 582(i) | 1,157.5 | /M2 | 217 | ₹2,51,177.5 |
| 1.04 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.13.80 | 1,157.5 | /M2 | 115 | ₹1,33,112.5 |
| 1.05 | Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm13.45.1 | 1,157.5 | /M2 | 136 | ₹1,57,420 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 34.09 MB
BOQ_2223282.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .