Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.8 LAdmitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L1 | Admitted-Finance | |
| 2 | L2₹1.0 Cr+₹96,196.54 (0.96%)Admitted-Finance NO 25 OTTHAVADA STREET NEAR NEW BUS STAND ARAKKONAM 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | L2 | Admitted-Finance | |
| 3 | L3₹1.0 Cr+₹2.8 L (2.81%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.2 Cr+₹18.2 L (18.3%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | K S CONSTRUCTION L1 | M.JAYAVEL L3 | D RAVI L2 | JD ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing juli flora jungle away from the site including the cost of labour transport lead lift etc complete. | 1,680 | M2 | 5 ₹8,400 | 0.1 ₹168 Lowest | 6 ₹10,080 | 1 ₹1,680 |
| 2.00 | Earth work excavation for leveling the site in ondary soil with initial lead, liftetc complete. as department enigineer at site | 504 | M3 | 100 ₹50,400 | 0.1 ₹50.4 Lowest | 70 ₹35,280 | 100 ₹50,400 |
| 3.00 | Earth work excavation and depositing on bank with initial lead of 10m and lift of 2m in hard stiff clay, hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc | 688 | m3 | 100 ₹68,800 Lowest | 150 ₹1,03,200 | 100 ₹68,800 Lowest | 200 ₹1,37,600 |
| 4.00 | Providing sand filling in foundation, including cost of sand, filling charges, watering and consolidation etc complete. | 39.6 | m3 | 1,000 ₹39,600 | 500 ₹19,800 Lowest | 500 ₹19,800 Lowest | 1,000 ₹39,600 |
| 5.00 | Providing foundation concrete in PCC 1:3:6, using 40 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete. | 99.2 | m3 | 5,000 ₹4,96,000 | 5,000 ₹4,96,000 | 4,900 ₹4,86,080 Lowest | 6,000 ₹5,95,200 |
| 6.00 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site | 79 | m3 | 7,000 ₹5,53,000 | 7,000 ₹5,53,000 | 5,900 ₹4,66,100 Lowest | 7,500 ₹5,92,500 |
| 7.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site-Wall | 285.6 | m3 | 8,500 ₹24,27,600 Lowest | 10,000 ₹28,56,000 | 9,900 ₹28,27,440 | 12,000 ₹34,27,200 |
| 8.00 | P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site | 110 | m3 | 6,500 ₹7,15,000 | 6,000 ₹6,60,000 | 5,600 ₹6,16,000 Lowest | 6,000 ₹6,60,000 |
| 9.00 | P.C.C 1:2:4 using 12 to 20mm HBG stone for plinths with form work including cost of form work, all materials, curing, labour, lead,and lift etc. complete. as per standard specification as directed by the dept. Engineer at site | 55 | m3 | 8,000 ₹4,40,000 | 9,000 ₹4,95,000 | 7,900 ₹4,34,500 Lowest | 8,000 ₹4,40,000 |
| 10.00 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site | 29.2 | MT | 50,000 ₹14,60,000 Lowest | 60,000 ₹17,52,000 | 51,000 ₹14,89,200 | 50,000 ₹14,60,000 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹1.1 L
Closing Date
4 Dec 2023, 2:30 pmClosed
CE/TP-I/CNI
230 KV GIS SS Industrial Estate Guindy
Up gradation of existing ICF 33 11KV outdoor SS into 110 33 11 KV AIS SS with 2 50MVA power transformers along with enhancement of existing 33 11KV power transformer capacity at ICF 110 3311KV SS. Civil
2023_EB_390961_1
TP1-69/2023-24
Open Tender
Civil Works - Others
Works
120 days
ICF
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
8 Jan 2024
20 Nov 2023
5 Dec 2023
20 Nov 2023
4 Dec 2023
20 Nov 2023
Amount
Clearing juli flora jungle away from the site including the cost of labour transport lead lift etc complete.
Earth work excavation for leveling the site in ondary soil with initial lead, liftetc complete. as department enigineer at site
Earth work excavation and depositing on bank with initial lead of 10m and lift of 2m in hard stiff clay, hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc
Providing sand filling in foundation, including cost of sand, filling charges, watering and consolidation etc complete.
Providing foundation concrete in PCC 1:3:6, using 40 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete.
R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site-Wall
P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site
P.C.C 1:2:4 using 12 to 20mm HBG stone for plinths with form work including cost of form work, all materials, curing, labour, lead,and lift etc. complete. as per standard specification as directed by the dept. Engineer at site
Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site
Labour charges for assembling of template in correct position and alligenment for various equipment plinth and grouting the foundation bolt including cost of all material transport , labour,lead, lift etc, complete as directed by the dept. Engineer at site.
Supplying and fixing of approved quality MS rails (90 LBS) including costof all materials, labour, lead lift etc. complete.
Plastering in CM 1:5 12 mm thick including cost of all materials, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site
Colour washing two coats using Exterior emulsion paint over one coat of white washing including cost of all materials, colur pigments labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site
Removal of surplus earth from the site and putting into low lying area inside the yard
Providing and installing bored RCC piles of 300 mm size dia in all kind of soil using either diesel which operated drop hammer of single or double acting hamer operated by steam compressor for driving pile (steel tube with a plub or shoe of 16mm thick plate at bottom upto the foundation level filling the casing pipe with M20 concrete with a slump specified in IS 1951/para I Sec 1979 of all as per specification including all T&P such as pile frame dolly full/power required for all operation including concreting for 300mm dia pile etc., complete as directed by the Engineer at site.
Hallow block Wall in CM 1:5 using Hallow block ncluding cost of hollow blocks, labour for transporting laying with all labour lead lift etc complete as directed by the Engineer at site.
Labour charges for fabrication and fixing of angles over the top of thecompound wall with cost of labour for fabrication fixing Y brackets with all lead lift etc complete (Angles will be supllied departmentally)
Providing 8 rows barbed wire with vertical crossing, 9 nos including strectching, straightening, tensioning, tying with fence post with binding wire including cost of binding wire necessary T&P, labour, etc., complete.
Dismantling existing RCC structures in the existing yard area including cost of all lead, lift, etc., complete.
Dismantling existing fencing in the existing yard area including cost of all lead, lift, etc., complete.
Supplying and laying of PVC High density pipe including cuting, threading, Pasteting of Tee joint, Lbow, cost of all materials,labour,lead lift etc. complete.As directed by the engineer incharge at site. - 25mm Dia PVC Pipe
Supplying and laying of PVC High density pipe including cuting, threading, Pasteting of Tee joint, Lbow, cost of all materials,labour,lead lift etc. complete.As directed by the engineer incharge at site. - 20mm Dia PVC Pipe
Supply and fixing posing in gun metal wheel wall leader make of best quality including cost of all materials lead, lift, etc., complete .As directed by the engineer incharge at site. - 25mm Dia
Supply and fixing of 12mm dia PVC Tap including cuting, threading, Pasteting of Tee joint, elbow, cost of all materials,labour,lead lift etc. complete.As directed by the engineer incharge at site.
Supplying and laying of PVC ridge pipe(100mm dia thick with ISI make including cuting, threading, Pasteting of Tee joint, Lbow, for cable duct road crossing and necessary lace of cable work cost of all materials,labour,lead lift etc. complete.As directed by the engineer incharge at site.
Supplying and erection of 2.0HP Texmo/ Kirloskar/ Sharp/ Suguna make jet pump with all accessories, suitable L&T/ Siemens starter, L&T main switch, fuse, foot valve, etc. including cost of all materials as directed by the Engineer at site, commissioning etc. complete. for Borewell.
Supplying and erection of 5.0 HP Texmo/ Kirloskar / Sharp/ Suguna make Monoblock pump with all accessories, suitable L&T/ Siemens starter, L&T main switch, fuse, foot valve, etc. including cost of all materials as directed by the Engineer at site, commissioning etc. complete. (For Sump water)
Supplying and fixing of SINTEX pvc water tank of 1000 litres capasity with necessary specials and fittings including cost of all materials , lead lift etc complete
Supplying and fixing of PVC pipe ISI branded and approved quality as indicated below for water line , sanitory line etc.including cost of PVC special , and all other materials etc.complete as per standard specification. - PVC Pipe 160mm dia. 6kg/ sq.cm for bore well
Supplying and fixing of PVC pipe ISI branded and approved quality as indicated below for water line , sanitory line etc.including cost of PVC special , and all other materials etc.complete as per standard specification. - PVC Pipe 160mm dia. 6kg/ sq.cm for bore well strainer pipe with slotted holes
Supplying and fixing of PVC pipe ISI branded and approved quality as indicated below for water line , sanitory line etc.including cost of PVC special , and all other materials etc.complete as per standard specification. - PVC Pipe 40mm dia. PVC for suction pipe in bore well
Supplying and fixing of PVC pipe ISI branded and approved quality as indicated below for water line , sanitory line etc.including cost of PVC special , and all other materials etc.complete as per standard specification. - PVC Pipe 32mm dia. PVC for delivery pipe in bore well
Drilling borewell in all kinds of soil 150 mm dia using rotary drilling power driven/ hand driven equipments including hire charges for equipment , bentonite solution,labour etc. complete
Supplying and filling with pebbles for annular space bet. Strainer pipe and earth surface including cost of all materials, lead,lift etc.complete.
Flushing the borewell with power rotary flushing eqipement including mobilisation and demobilisation etc.complete.
Supplying and providing MS.steel grill gate with cost of grill, labour for fabrication,fixing in position,etc complete as directed by the Engineer at site.
Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20 mm thick to full width and depth of 150mm thick plastering with CM 1:3, 20 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification.
Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 15 cm L at bottom and 10 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Supplying and Filling with stone dust including cost of metal , labour all lead and lift etc . Complete.
Supplying and Filling with 12- 20 mm B.G metal including cost of metal ,labour all lead and lift etc . Complete.
Supplying of Gravel and Filling including cost of gravel, transport charges, spreading and consolidation of each layer 300 mm with power roller, labour, lead, lift etc., complete. as directed by dept. Engineer at Site
Supply and erection of well ring 1.2m diameter for earthpit including cost of materials all lead, lift etc.complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
D RAVI
M.JAYAVEL
JD ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_465857.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .