Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 LAccepted-AOC ALAKHRAJ BHAWAN NEAR MAMTA MOTORS BHUSA MORE DIST SINGRAULI MP 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | ₹12.7 L | 1 | Accepted-AOC Techno commercially accepted single bidder |
| Sl No | Description | Qty | Unit | DS CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00SCOPE OF WORK: A. Removal, dismantling, assembling and fitment of tyres of dumper , water sprinkler, cranes and graders including Proper Management and handling of OTR tyres (new, serviceable and scrap) - (approx 70 nos. tyres removal and fitment) (Tyre removal from dumpers, water sprinklers, cranes and graders, Dismantling of tyres from rim, Assembling of retraded/ New tyres on rim, Fitment of assembled tyres on the eqipment, Proper Management and handling of OTR tyres (new/serviceable/scrap)) B. Dismantling, repairing, assembling of final drive, differential, brake assembly and steering linkage etc. for a year. (Dismantling/removal of rear tyres., Dismantling and removal of hub assly, Removal of Rear brake assly, Dismantling and removal of hub assly, Removal of floating seal and disc, Cleaning of brake assly, Re-fitting of brake piston on final drive housing, Re-fitting of brake assembly with floating seal and disc, Fitting of bearings, Cleaning , re-assembling and refitting of hub assly, Fitting of ring gear, Adusting of shim on hub, Testing of oil leakage on the hub assly, Fitment of planatary assly, Fitment of axle and hub front cover, Fitment of both tyres.) - (approx 17 nos.) C. Repairing of Hyd. Cylinders of HEMMS like steering, Hoist, boom, Arm, bucket, dump etc. and Suspensions of Dumpers (Dismantling of cylinder and suspension, Replacing service kit of hyd. Cylinder/ suspension, Assembling of cylinder, Tightening of all bolts/ stud of cylinder) - (approx 20 nos.) D. Repairing of Sub. Assy. of Shovels and drills like swing machinary, final drive etc.(Cleaning of sub assly, Dismantling of sub assly, Inspection, checking and identifying defective parts, Replacing the defective parts by new one, Assembling of assly, Tightening of all bolts and nuts of assly) - (approx 10 nos.) | ||||
| 2.00 | Labour charges for scope of work A (labour consisting of 01 skilled and 05 unskilled) | 1 | JOB | 5,21,000 ₹5.2 L |
| 3.00 | Labour charges for for scope of work B (labour consisting of 01 skilled and 05 unskilled) | 1 | JOB | 3,15,000 ₹3.1 L |
| 4.00 | Labour charges for Labour charges for for scope of work C (labour consisting of 01 skilled and 02 unskilled) | 1 | JOB | 96,000 ₹96,000 |
| 5.00 | Labour charges for Labour charges for for scope of work D (labour consisting of 02 skilled and 02 unskilled) | 1 | JOB | 98,500 ₹98,500 |
| 6.00 | Contractor Profit | 1 | JOB | 45,000 ₹45,000 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | No. | 1,93,590 ₹1.9 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹15,900
Closing Date
11 Nov 2025, 11:00 amClosed
Staff Officer (Excv), NCL Jhingurda Project
Staff Officer (Excv) Office, NCL Jhingurda Project, Pin code-486889
Carrying out the jobs of, including, but not limited to, demounting repairing and mounting of the final drive assy., steering system, differential, OTR tyre removal dismantling assembling and fitment in HEMMs including management and handling of OTR
2025_NCL_346319_1
JRD/SO(X)/E-TENDER/25-26/175 dated 27.10.2025
Open Tender
Excavation Department Work
365 days
NCL Jhingurda Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,900
11 Feb 2026
27 Oct 2025
12 Nov 2025
27 Oct 2025
11 Nov 2025
28 Oct 2025
27 Oct 2025 - 3 Nov 2025
Amount
SCOPE OF WORK: A. Removal, dismantling, assembling and fitment of tyres of dumper , water sprinkler, cranes and graders including Proper Management and handling of OTR tyres (new, serviceable and scrap) - (approx 70 nos. tyres removal and fitment) (Tyre removal from dumpers, water sprinklers, cranes and graders, Dismantling of tyres from rim, Assembling of retraded/ New tyres on rim, Fitment of assembled tyres on the eqipment, Proper Management and handling of OTR tyres (new/serviceable/scrap)) B. Dismantling, repairing, assembling of final drive, differential, brake assembly and steering linkage etc. for a year. (Dismantling/removal of rear tyres., Dismantling and removal of hub assly, Removal of Rear brake assly, Dismantling and removal of hub assly, Removal of floating seal and disc, Cleaning of brake assly, Re-fitting of brake piston on final drive housing, Re-fitting of brake assembly with floating seal and disc, Fitting of bearings, Cleaning , re-assembling and refitting of hub assly, Fitting of ring gear, Adusting of shim on hub, Testing of oil leakage on the hub assly, Fitment of planatary assly, Fitment of axle and hub front cover, Fitment of both tyres.) - (approx 17 nos.) C. Repairing of Hyd. Cylinders of HEMMS like steering, Hoist, boom, Arm, bucket, dump etc. and Suspensions of Dumpers (Dismantling of cylinder and suspension, Replacing service kit of hyd. Cylinder/ suspension, Assembling of cylinder, Tightening of all bolts/ stud of cylinder) - (approx 20 nos.) D. Repairing of Sub. Assy. of Shovels and drills like swing machinary, final drive etc.(Cleaning of sub assly, Dismantling of sub assly, Inspection, checking and identifying defective parts, Replacing the defective parts by new one, Assembling of assly, Tightening of all bolts and nuts of assly) - (approx 10 nos.)
Labour charges for scope of work A (labour consisting of 01 skilled and 05 unskilled)
Labour charges for for scope of work B (labour consisting of 01 skilled and 05 unskilled)
Labour charges for Labour charges for for scope of work C (labour consisting of 01 skilled and 02 unskilled)
Labour charges for Labour charges for for scope of work D (labour consisting of 02 skilled and 02 unskilled)
Contractor Profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_358997.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.01 MB
Annexure175.pdf
Tender Documents • 1.21 MB
ITBCOCATC.pdf
Tender Documents • 1.12 MB
BOQ_358997.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid