Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.3 LAccepted-AOC 1 71 SREEMANTA DEY LANE KOLKATA 700012 W B | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹62.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹63.0 LRejected-Finance 1 6 FAKIR CHAKRABORTY LANE | ₹63.0 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹63.4 LRejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹63.4 L | L3 | Rejected-Finance Higher than L1 |
| 4 | L4₹63.8 LRejected-Finance ALAMPUR NODAKHALI | ₹63.8 L | L4 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | ORIENTAL ENGINEERING CO. L1 | H.K.DAS AND CO. L2 | B T PROJECTS PRIVATE LIMITED L3 | S. P. CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | |||||||
| 2.00 | Supply of hire basis 4.88 mtr long and 0.10 mtr. dia (Av.) bottom and 50 mm. dia. top salbollah post and erecting the same at Bus Stand and other different places as per direction of E.I.C. (av. distance between the two poles is 20 mtrs.) | 340 | Nos | 30 ₹10,200 | 30.3 ₹10,302 | 31 ₹10,540 | 31.5 ₹10,710 |
| 3.00 | Supply on hire basis 4.88 mtr. long and 0.10 mtr. dia (av) bamboo post & erecting the same at bus stand other different places as per direction of the E.I.C. | 100 | Nos | 20 ₹2,000 | 20.5 ₹2,050 | 21 ₹2,100 | 22 ₹2,200 |
| 4.00 | Supply on hire basis 400 watt sodium vapour fixture, lamp ballast and other materials required to complete the work with effect from 01.01.2026 to 17.01.2026 = 16 points x 17 days. | 272 | Pts | 144 ₹39,168 | 144.5 ₹39,304 | 145 ₹39,440 | 145.5 ₹39,576 |
| 5.00 | Drawing of LT feeder and distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by 50 sq. mm. to 16 sq. mm. PVC single core wire on hire basis on salbollah post & on PCC pole incl. supply of wire installation of binding wire etc. as directed before 02.01.2026 | 5,000 | Mtr | 2.5 ₹12,500 | 3.1 ₹15,500 | 2.75 ₹13,750 | 3.2 ₹16,000 |
| 6.00 | Constructions of tower by steel tubular pole with cross arms for both sides the tower should be 9.14 mtr. long x 1.5 mtr. bottom by supplying reqd. quantity steel pipe cross arms horizontal support etc. to complete the tower on the basis incl. fitting fixing of twin type of 400 watt sodium vapour flood light fixture and lamp (1 set in front and other in the back, if necessary) on hire basis as per direction of EIC incl. drawing off elec. Connection with all protection to avoid all kind of accident and all the tower should be properly earth as per IE rules with effect from 04-01-2026 to 17-01-2026 = 14 days | 2 | Sets | 4,600 ₹9,200 | 4,650 ₹9,300 | 4,620 ₹9,240 | 4,621 ₹9,242 |
| 7.00 | Making lighting arrangement by one no steel tubular pole 9.14mtr long x 1.5 mtr [5ft] bottom for proper illumination of bus stand including supply of necessary materials required to complete the tower on hire basis including fitting fixing of twin type of 400 watt of sodium vapour flood light fixture and lamp on iron frame and other in the back if necessary as per direction of E.I.C. incl. drawing all elec. Connection an necessary protection complete from 10-01-2026 to 17-01-2026= 8 days | 4 | Sets | 2,759 ₹11,036 | 2,775 ₹11,100 | 2,765 ₹11,060 | 2,766 ₹11,064 |
| 8.00 | Drawing tube light points from different distribution and feeder lines on salbollah post and PCC pole at different places with supplying on hire basis 40 watt tube light, choke, starter and all other necessary materials to complete the work from 04.01.2026 to 17.01.2026 = 14 days x 480 pts. | 6,720 | Pts | 8 ₹53,760 | 8.25 ₹55,440 | 9 ₹60,480 | 9.2 ₹61,824 |
| 9.00Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 60 watt. bulb, holder bracket and necessary materials required to complete the work | |||||||
| 10.00 | From 04.01.2026 to 17.01.2026 = 14 days x 150 pts. | 2,100 | Pts | 2.5 ₹5,250 | 2.75 ₹5,775 | 3.2 ₹6,720 | 3.3 ₹6,930 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
15 Nov 2025, 5:00 pmClosed
Executive Engineer ,SMD , PHED
Chetla , Kolkata-700027
As per NIeT Documents in connection with ganga Sagar Mela 2026
2025_PHED_926250_4
WBPHE/EE/SMD/NIeT-40 of 2025-26
Open Tender
MISC ELECTRICAL WORKS
60 days
Kakdwip, South 24 PGS
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.3 L
7 Apr 2026
28 Oct 2025
17 Nov 2025
28 Oct 2025
15 Nov 2025
28 Oct 2025
Amount
Supply of hire basis 4.88 mtr long and 0.10 mtr. dia (Av.) bottom and 50 mm. dia. top salbollah post and erecting the same at Bus Stand and other different places as per direction of E.I.C. (av. distance between the two poles is 20 mtrs.)
Supply on hire basis 4.88 mtr. long and 0.10 mtr. dia (av) bamboo post & erecting the same at bus stand other different places as per direction of the E.I.C.
Supply on hire basis 400 watt sodium vapour fixture, lamp ballast and other materials required to complete the work with effect from 01.01.2026 to 17.01.2026 = 16 points x 17 days.
Drawing of LT feeder and distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by 50 sq. mm. to 16 sq. mm. PVC single core wire on hire basis on salbollah post & on PCC pole incl. supply of wire installation of binding wire etc. as directed before 02.01.2026
Constructions of tower by steel tubular pole with cross arms for both sides the tower should be 9.14 mtr. long x 1.5 mtr. bottom by supplying reqd. quantity steel pipe cross arms horizontal support etc. to complete the tower on the basis incl. fitting fixing of twin type of 400 watt sodium vapour flood light fixture and lamp (1 set in front and other in the back, if necessary) on hire basis as per direction of EIC incl. drawing off elec. Connection with all protection to avoid all kind of accident and all the tower should be properly earth as per IE rules with effect from 04-01-2026 to 17-01-2026 = 14 days
Making lighting arrangement by one no steel tubular pole 9.14mtr long x 1.5 mtr [5ft] bottom for proper illumination of bus stand including supply of necessary materials required to complete the tower on hire basis including fitting fixing of twin type of 400 watt of sodium vapour flood light fixture and lamp on iron frame and other in the back if necessary as per direction of E.I.C. incl. drawing all elec. Connection an necessary protection complete from 10-01-2026 to 17-01-2026= 8 days
Drawing tube light points from different distribution and feeder lines on salbollah post and PCC pole at different places with supplying on hire basis 40 watt tube light, choke, starter and all other necessary materials to complete the work from 04.01.2026 to 17.01.2026 = 14 days x 480 pts.
Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 60 watt. bulb, holder bracket and necessary materials required to complete the work
From 04.01.2026 to 17.01.2026 = 14 days x 150 pts.
From 18.01.2026 to 22.01.2026 = 5 days x 20 pts.
Drawing halogen light point on the existing salbollah post from different feeder line as per direction E.I.C. by supplying on hire basis 1000 watt halogen lamp fixture from 02.01.2026 to 17.01.2026 = 16 days x 37 pts.
Drawing halogen light 1000 watt on PCC pole on hire basis from Kashinagar to Hardwood point from different distribution line to different places as per direction EIC incl. connection of wire and other materials as reqd. to complete the job with effect from 02.01.2026 to 16.01.2026 = 15 days x 24 points.
Drawing the street light points for bus stand (old & new) from different feeder and distribution line to PCC pole street tubular pole and salballah post to different places as directed with supply on hire basis 250 W sodium fixture lamp ballast and other necessary materials reqd. for the work to complete from 01.01.2026 to 17.01.2026=17days x 106pts
Drawing of light point for bridge ghat, jetty ghat and other places as directed with supply on hire basis 400 W sodium vapour fixture lamp ballast and other materials reqd. to complete the work from 01.01.2026 to 17.01.2026 = 17 days x 27 pts.
Drawing of light point of 400 watt twin type flood light fixture and son lamp with control gear complete on hire basis from 01.01.2026 to 17.01.2026 = 17days x 53pts
Drawing ceiling lights points from different distribution line to different hogla shed as per direction of EIC with supply on hire basis 40 watt bulb holder and other materials required to complete the work from 04.01.2026 to 17.01.2026= 14 days x 325 pts.
Drawing ceiling light points from different distribution line to different jetty ghat as per direction of EIC with suppy on hire basis 40 watt bulb holder and other materials required to complete the work from 08.01.2026 to 16.01.2026 = 9 days x 60 pts.
Drawing of metal flood light points on hire basis on jetty ghat, bus stand from different feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 08.01.2026 to 16.01.2026 = 9 days x 22 pts.
Making jetty ghat signal with color 12 nos. 40 watt x 4 ft. long tube as directed including supply on hire basis ( for 5 nos. jetty) tube choke starter wire etc. for the work complete from 04.01.2026 to 17.01.2026 = 14 days x 15 pts.
Temporary installation of panel board wooden plank including supply on hire basis salbollah wood plank etc. as per direction of E.I.C.
Drawing flood light point in new bus stand road PCC pole and tower from different feeder line as directed with fitting fixing of 400 watt twin type SON-T flood light fixture and lamp with control gear bulb etc. as required to complete the work on hire basis for the period from 01.01.2026 to 16.01.2026 = 16 days x 22 pts.
Temporary installation of controlling station with fittings 63 amps TPN 16 amp TPN main switch on wooden plank and salbollah on hire basis incl. elec. Connection complete as per direction of E.I.C.
Making electrical connection from WBSEDCL supply main switch board by supplying on hire basis 50 sq. mm x 3.5 core PVC Al. cable as per IE rules as per direction of E.I.C. including supply of all necessary materials reqd. before 01.01.2020 (average Distance from WBSEDCL supply main switch to departmental panel board is 50 mtrs) for four nos. station with proper earthing as per IE rules.
Replacement of 120 mm size digit 2023 in place of 2021 replacing only digit. Removal of existing letter with supply of red letters as per sample and other materials as directed.
Fitting fixing of glow sign board /signage board/vernacular board on salballah structures on hire basis at different places as per direction of EIC with all electrical connection including supply of all materials reqd. to Complete the work.
Maintenance of controlling station by engaging skilled operating staff for operation of controlling switch of different places as per direction of E.I.C.
Carrying charges of materials such as S.V. fixture, glow sign board, panel board etc. from Akshyanagar store to Kakdwip Lot No. 8 and back to store after completion of mela incl. loading & unloading.
Painting of control panel board & the electrical accessories by one coat of red oxide paint and two coats of approved & anti corrosive paint as per direction of the E.I.C.
PROVING BARRIER LIGHTING AT OLD AND NEW BUS STAND Drawing L.T. feeder and distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by 16 sq mm. PVC single core wires on hire basis on salbollah post including supply of necy. Wire as per direction of E.I.C
Drawing barrier lighting from different distribution lines to different places on salbollah post with supply of 60 W colour lamp holders etc. on hire basis and other necessary materials required to complete the work from 10.01.2026 to 17.01.2026 = 8 days x 100 pts.
Repairing of L.T. panel board replacement of fuse grip, indicating lamp 63 amps main switch and fixing of the repaired accessories with all inter connection and testing complete as per direction of the E.I.C.
Petty repairing of glow sign board with supply of suitable size letter and fixing the same as per existing model including supplying 3 mm thick plastic sheet of reqd. to complete the work and painting complete.
LIGHTING OF NEW BUS STAND AREA THROUGH MS TUBULAR POLES Supply on hire basis of 9 m long pole and erecting by excavation of earth in any kind if soil at different places of new bus stand and jetty ghat area as per direction of E.I.C for the period from 01.01.2026 to 22.01.2026
Supply on hire basis of 9 mtrs long steel pole and erecting by excavation of earth in any kind of soul at LCT as per direction of EIC from 01.01.2026 to 22.01.2026
Drawing of flood light point at LCT jetty ghat with supply of following flood light fixture with lamp on hire basis with all other necessary materials required to complete the work.
400 watt twin flood light fixture and son lamp with control gear complete from 01.01.2026 to 22.01.2026 = 22 days x 02 pts
400 watt street light fixture on existing pole and son lamp with control gear complete from 01.01.2026 to 22.01.2026 = 22 days x 04 pts
250 watt street light fixture on existing pole and son lamp with control gear complete from 01.01.2026 to 22.01.2026 = 22 days x 24 pts
Drawing barrier signal lighting on LCT jetty ghat with supply of 60 watt color lamp holder etc on hire basis and other necessary materials required to complete the work from 02.01.2026 to 22.01.2026 = 21 days x 180pts
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
LIGHTING ARRANGEMENT IN BETWEEN NUTAN RUSTA TO LCT JETTY GHAT Drawing street light point on existing PCC pole by 250Watt SV lamp, ballast, fixture, wire etc and including all other accessories for complete the work on hire basis from 01-01-2026 to 17-01-2026 = 17days x 98 pts
Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe 2 Mtr long for street light fixture 250 watt SV lamp including MS collar weld at neck of the bracket making 600 bend at the top portion including painting by red oxide paints as per direction of EIC.
Supply, delivery and fixing of suitable size pole clamp as per direction of EIC.
Drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire for jumper and insulator and safety device etc. in different places as per ISS and IE rules as per direction of EIC (ACSR conductor will be supplied by the Department)
Fixing of special type arm bracket in PCC pole by supplying necessary fittings all complete
ILLUMINATION OF EXTENDED PORTION OF MAIN CONCRETE JETTY GHAT NO. 1 Drawing of flood light points for permanent jetty ghat and other place as directed on supply on hire basis 400 watt sodium flood light fixture- 1no, control gear box and SV lamp etc and complete the work from 01-01-2026 to 17-01-2026 =17 days x 12 pts
Drawing of the flood light point for main entrance of the jetty fixing on MS joist as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 04-01-2026 to 17-01-2026= 14 days x 4pts
Drawing of 250watt street light fixture in different place of permanent jetty ghat on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 04-01-2026 to 17-01-2026 = 14 days x 10pts
Supply on hire basis of 9mtr long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 04-01-2026 to 17-01-2026
Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts and washer size 3 ½ “ x 5” dia
Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
Fitting fixing of D type iron clamp, Parceling shackles and pole clamp in the MS pole after completion of the erection work
Drawing LT feeder and distribution line from medium pressure voltage 3 phase 4-wire system by 25sq.mm. PVC single core aluminum wire on hire basis
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
ILLUMINATION OF JETTY GHAT NO 2 Drawing of flood light points for jetty ghat no. 2 and other place as directed on supply on hire basis 400 watt sodium flood light fixture- 1no, control gear box and SV lamp etc to complete the work from 02-01-2026 to 17-01-2026 =16 days x 16 pts
Drawing of the flood light point for main entrance of the jetty fixing on MS joist as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2026 to 17-01-2026 = 17 days x 8pts
Drawing of 250watt street light fixture in different place of jetty no. 2 on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 01-01-2026 to 17-01-2026= 17 days x 30pts
Supply on hire basis of 9mtr long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 01-01-2026 to 17-01-2026
Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts and washer size 3 ½ “ x 5” dia
Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe x 2 mtr long for light fixture 250watt SV lamp including MS collar welded at neck of the bracket including painting by red oxide paint as per direction
Fitting fixing of D type iron clamp, Parceling shackles and pole clamp in the MS pole after completion of the erection work
Drawing LT feeder and distribution line from medium pressure voltage 3-phase 4-wire system by 25 sq. mm. PVC single core aluminum wire on hire bsis
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
ILLUMINATION OF JETTY NO. 3 Drawing flood light points from different place of new jetty Ghat and other places as per direction on supply on hire basis 400 watt sodium fixture, 1no control gear box and S.V. lamp etc complete the work from 01-01-2026 to 17-01-2026 = 17 days x 14 nos
Drawing flood light points for main entrance of the jetty and approach road as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2nos SON lamp with control gear box complete from 01-01-2026 to 17-01-2026 = 17 days x 4 pts
Drawing tube light point from different distribution and feeder line on suitable place at jetty with supply on hire basis 40 watt tube light, choke complete the work from 04-01-2026 to 17-01-2026 = 14 days x 60pts
Drawing of 250 watt street light in different places of new jetty ghat river bank road and approach road, hardwood point and other place on hire basis of 250 watt SV fixture, ballast, 250wattt SV lamp from 01-01-2026 to 17-01-2026 = 17 days x 30 pts [for Jetty No.3 – 20 Nos and bypass road-10nos]
Supply on hire basis of 9 mtr long MS pole and erection on the jetty bridge, river bank to hardwood point , approach road as per direction of EIC for the period from 02-01-2026 to 17-01-2026
Supply and delivery at site D type iron clamp set galvanized coating with necessary GI nuts and washer size 3 ½ “ x 5”
Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
Supply & delivery at site 25 sq. mm. 660/1200 volt grade singe core PVC insulated aluminum cable
Fitting fixing of D type iron clamp, porcelain shackles and MS clamp in the MS pole after complete erecting work
Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC single core aluminum cable
Making earthing arrangement by supplying ⅝” dia earth spike of 2 mtr long with galvanized bolts and nits and washer etc including supplying and fitting riding 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making jetty light Ghat signal light with color and LED lamp dimmer and fixing on pole and front side of the jetty to complete the job
ILLUMINATION OF APPROACH ROAD BETWEEN HARDWOOD POINT TO RIVER BANK Supply on hire basis of 9 mtr long steel tubular pole and erection complete at approach road for Hardwood Point near bus stand
Drawing of 250 watt street light fixture in different place of approach road on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 04-01-2026 to 17-01-2026 = 14 days x 23 pts
Drawing of 250 watt street light fixture in approach road near hardwood point jetty ghat on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 04-01-2026 to 17-01-2026 = 14 days x 15 pts
Drawing flood light point of approach road near hardwood point bus stand on hire basis of 400 watt twin type flood light fixture and SON lamp with control gear complete from 04-01-2026 to 17-01-2026 = 14 days x 7 pts
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
ILLUMINATION OF JETTY NO.4 AND OTHER ALLIED WORKS Drawing of flood light points from different place of new jetty ghat and other places as per direction on supply on hire basis 400 watt sodium flood fixture 1 no control gear box and SV lamp etc complete the work from 01-01-2026 to 17-01-2026 = 17 days x 20 pts
Drawing flood light point for main entrance of the jetty and approach roads fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2026 to 17-01-2026= 17 days x 16pts
Drawing of 250 watt street light fixture in different places of new jetty ghat river bank road and approach road, hardwood point and other place on hire basis of 250- watt SV fixture, ballast 250 watt SV lamp from 02-01-2026 to 17-01-2026= 16 days x55 pts
Drawing of metal flood light point on different places as per direction of EIC of 400 watt metal fixture, lamp control gear etc to complete the jobs from 01-01-2026 to 17-01-2026 =17 days x 12pts
Supply on hire basis of 9 mtr long MS pole and erection on the jetty bridge, river bank to hardwood points approach road as per direction of EIC for the period from 01-01-2026 to 17-01-2026
Supply and delivery at site D type iron clamp set galvanized coating with necessary GI nuts and washer size 3 ½ “ x 5”
Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
Supply and delivery at site 25 sq.mm. 660/1200 volt grade single core PVC insulated aluminum cable
Fitting fixing of D type iron clamp, porcelain shackles and MS clamp in the MS pole after complete of the erection work
Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25sq.mm. PVC single core aluminum cable on hire basis
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
JETTY NO. 5 WITH SURROUNDING AREAS Drawing of flood light points for jetty Ghat No.5 and other place as directed on supply on hire basis 400 watt sodium flood light fixture-1 No, control gear box and SV lamp etc and complete the work from 01-01-2026 to 17-01-2026= 17 days x 16pts.
Drawing of the flood light point for main entrance of the jetty fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2026 to 17-01-2026=17days x 15 pts.
Drawing of 250 watt street light fixture in different place of jetty ghat no5 on hire basis of 250 watt S.V fixture ballast,250 watt S.V. lamp from 01-01-2026 to 17-01-2026= 17 days x 45 pts.
Supply & drawing of distribution line for medium pressure voltage, 3Phase 4 wire system by 25sq.mm single core PVC insulated wire on hire basis including dismantling the same after completion the work.
Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 01-01-2026 to 17-01-2026
Supply and delivery at site D. type iron clamp set galvanized with necessary GI nuts and washer size 31/2'' x 5'' dia.
Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm.
Fitting fixing of D type iron clamp, porcelain shackles and pole clamp in the MS pole after completion of the erection work.
Making earthing arrangement by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Guarding charge of the whole installation.
Installation of the departmentally supplied LED board on the top of the jetty No. 5 with proper positioning including supply of 7/20 PVC insulated single core aluminium cable approx. length 20 mtr. Including connection and clamping arrangement complete.
Fitting fixing of light boxes with three sides open with red and green light for signaling for vessel availability in jetty ghat No. 5.
GROUP-A Shifting and carrying charges of the above PCC poles at different places by hire basis van and manual labour including loading and unloading complete
Erection of the above PCC poles by excavation of earth depth up to 2 mtrs from ground level and filling with jhama bricks and excavated soil s per requirement to compete the job
Drawing of ACSR conductor with illumination arrangement and drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire from jumper and insulator and safety device etc in different places as per ISS & IE rules and also as per direction of EIC [ACSR conductor will be supplied by the Department]
Supply and drawing of continuous wire for earthing from end pole to receive pole by supplying 12 SWG GI wire with all necessary materials and earth clamp complete as per direction of the EIC
Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts bolts and washer size 3.5” x 5” dia including loading unloading and carrying charges complete as per direction of the EIC
Supply and delivery of porcelain shackle insulator size 75mm x 88mm
Supply fitting fixing of hexagonal type safety device by making 12 SWG GI wire for LTOH line as per direction of the EIC
Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making stay arrangement by 7/18 SWG GI stay wire including supply of necessary materials which will be required stone chips, cement, sand, stay rod anchor plate for stay complete as per IE rules & ISS
Drawing of 250 watt street light fixture in extension road from Hardwood Point Launch Ghat on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 05-01-2026 to 17-01-2026 = 13 days x 15 pts
Painting with decorative cement basis paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of the EIC
Painting with ready mix black Japan paint up to 0.5mtr from ground level as per direction with proper numbering
Painting of D type iron clamp, arm bracket, pole clamp by two coats complete.
Dismantling of ACSR conductor and earth wire from end pole after disconnection of al. jointing materials i.e. jumper insulator, safety device, binding from the PCC pole in different places at new bus stand and old bus stand as per direction of EIC after completion of mela works
Withdrawing the 8 mtrs PCC poles by excavation of the and lifting the poles carefully and stacking the pole at site store
Supply on hire basis of 15amps plug socket and plug with wooden board and fixing of the different palaces i.e. police line, police barrack, hospital, movement office etc including supply of power cable and connection complete
GROUP-B RENEWING EARTHING ARRANGEMENT AND MAKING STARY ARRANGEMENT FOR THE EXISTING PCC POLE AT LOT NO.8 NEW BUS STAND Making earthing arrangement by supplying 5/8” dia Earth spike of 2 mtr long with galvanized bolts nuts and washer etc. including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making the stay arrangement by 7/18 SWG std stay wire including supply of necessary materials which will be required stone chips, cement, sand, stay rod, anchor plate for stay complete as per IE rules
Carrying charges of fixed type High Mast including control panel, cable, luminaries etc. from Akshaynagar store to site i.e. Harwood point more and near LCT Jetty by hiring of car and all other necessary arrangement as per requirement
Installation the High Mast pole with fitting fixing of the luminaries (9 Nos.) on the lighting tower and laying of the PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC.
Carrying back the fixed type High Mast including control panel, cable, luminaries etc. to PHE store after dismantling the luminaries, accessories, cable etc. at Akshaynagar Store by hiring of car and all other necessary arrangement after completion of Mela
Guarding arrangement of the whole installation round the clock as per direction of the EIC
GROUP-C Providing power supply at Lot No.8 guest house [Mohana Bungalow] Guarding of the while installation at LOT No. 8, Kashinagar, Kakdwip Road, Old and new bus stand, Jetty Ghats etc. by engaging labour as per direction from 04-01-2026 to 17-01-2026
Restrengthening of existing poles in different places after disconnecting the stay etc. at main bus stand (New) and connecting the stay as directed
Earth filling to the level of existing pole and packing of brickbats by supplying required quantity of bats after earth cutting of the pole base and the PCC pole in original position complete by providing stay wire & other materials as per direction of the E.I.C.
Replacement of GI bolts nuts & washers D type iron clamp shackle insulator etc. of the above works as per requirement complete of all works as per direction of the E.I.C. including supply of all materials.
GROUP-B [Drawing of ACSR in LT distribution line at new & old bus stand] Drawing of overhead line in vertical configuration for medium pressure line A.C.S.R including supplying of wire for jumper & insulator and safety device etc. in different places complete as per I.E. Rules (A.C.S.R. conductor shall by supplied by deptt.)
Supply & drawing of continuous earth wire from end pole to receive pole by supplying 12 S.W.G G.I. wire with all new materials and earth clamp complete as per direction of E.I.C.
Dismantling of A.C.S.R conductor and earth from end pole after disconnection all jointing materials i.e. jumper including safety device binding from P.C.C. pole in different places of the New Bus Stand as per direction of E.I.C. after completion of Mela – 2026
Painting with decorative cement base of approved quality after scrapping the pole surface thoroughly in different areas as per direction of E.I.C.
Painting with ready mix Black Japan paint up to 0.5 mtr. G.L. as per direction with proper numbering.
Painting of ‘D’ type iron clamps and pole clamp etc. after scrapping the surface with two coats of red oxide paint.
CarryinCharges of over head materials i.e. A.C.S.R. clamp from Akshyanagar to Lot No. 8 & back to Akshyanagar store after mela including loading and unloading
Drawing of 25 sq. mm and 50sq.mm. x 3.5 core PVC Ar. Al cable in different distribution of L.T. panel board from the panel board of WBSEDCL [cable will be supplied by the department]
Drawing of the flood light points at New Bus Stand & Old Bus Stand from different distribution line to P.C.C. pole as directed with supply of following flood light fixture with lamp on hire basis with all other necessary materials reqd. to complete the work for the period from 03.01.2026 to 16.01.2026 = 12 days.
400-watt twin type flood light fixture and son lamp with control Gear complete 14 days x 94 pts.
400-watt street light fixtures and son lamp with control gear Complete 14 days x 54 pts.
GROUP-B ERECTION OF PCC POLES AND DRAWING OF ACSR CONDUCTOR WITH ILLUMINATION ARRANGEMENT AT RIVER BANK AND APPROACH ROAD BEHIND BHARAT SEVASRAM SANGHA Drawing of ACSR conductor with illumination arrangement and Drawing of overhead line in vertical configuration of medium pressure line by ACSR incl. supplying binding wire from jumper and insulator and safety device etc in different places as per ISS and IE rules and also as per direction of EIC (ACSR. conductor will be supplied by the Department)
Supply and drawing of continuous wire for earthing from end pole to receive pole by supplying 10 SWG GI wire with all necy. Materials and earth clamp complete as per direction of EIC.
Supply and delivery at site of D type iron clamp set galvanized with necessary GI nuts and bolts washer size 3.5” x 5” dia incl. loading unloading and carrying complete as per direction of EIC
Supply and delivery of porcelain shackle insulator size 75mm x 88mm including loading unloading and carrying complete as per direction of EIC
Supply and delivery at site of suitable poles clamp for existing PCC pole with iron angle fitting complete for 3 Ph 4 wire overheads lines as per ISS and IE rules incl. loading and unloading and carrying complete as per direction of EIC i) Size of angle=50mmx50mmx6mm thick. ii) Size of shackle strip=61mmx25mm
Supply and delivery at site the special Type arm bracket made with 40mm dia pipe x 2 mtr long for street light fixture 400watt SV lamp including MS collar weld at the neck of the bracket 60o bend at the top portion incl. painting by red oxide paints as per direction of EIC.
Supply and delivery at site of special type MS clamp as per sample by MS patty as required length incl. necy. Nuts, bolts and washer with painting red lead paint of approved make.
Supply fitting fixing of hexagonal type safety device by making 10 SWG GI wire for LTOH line as per direction of EIC
Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making the stay arrangement by 7/8SWG GI std stay wire incl. supply of necessary materials which will be required stone chips, cement, sand, stay rod anchor plate for stay complete as per IE rules and ISS
Drawing the flood light points of new bus stand from different distribution line to PCC pole as directed with supply of 250watt street light fixture with lamp on hire basis with all other necessary materials required to complete the work for the period from 05.01.2026 to 17.1.2026 = 13 days x 20 Nos
Painting with decorative cement basis paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of EIC.
Painting with ready mix black Japan paint upto 0.5mtr above GL as per direction with proper numbering
Painting of D type iron clamp and poles etc after scraping the surface with two coats
Dismantling of ACSR conductor and earth wire from end pole after disconnection all jointing materials i.e. jumper insulator safety device binding from the PCC pole in different places at new bus stand and old bus stand as per direction of EIC after completion of mela works
Supply on hire basis 4.88 mtr long and 0.10 mtr dia (av.) bottom and 0.50 mtr (av.) top salbollah post and erecting the same as per direction of EIC
Supply on hire basis of 9 mtr long MS pole and erection and fitting fixing the same as per direction of the EIC for the period from 05-01-2026 to 17-01-2026 = 13 days
Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe x 2 mtrs long for light fixture 250 watt SV lamp including 600 bend long at the top position including painting by red oxide paint as per direction
Drawing LT feeder and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC single core aluminum wire on hire basis
Drawing tube light point on the salbollah post with supply on hire basis 40watt tube light choke starter and all other necessary materials to complete the work from 07.01.2026 to 17.01.2026 = 11 days x 60 pts
Drawing of flood light points for other places as directed on supply on hire basis 400 watt sodium flood light fixture 1no control gear box and SV lamp etc to complete the work from 05-01-2026 to 17-01-2026 = 13 days x 2pts.
Drawing halogen light point on the PCC pole, salbollah from generating station with supply on hire basis 1000watt halogen lamp fixture from 05.01.2026 to 17.01.2026 = 13 days x 8 pts
Drawing of 400 watt twin type flood light fixture and SON lamp with control gear complete from 05.01.2026 to 17.01.2026 = 13 days x 10 pts
Drawing of 250watt street light fixture on hire basis of 250 watt SV fixture ballast 250 watt SV lamp from 05-01-2026 to 17-01-2026 = 13 days x 5pts
Drawing of the flood light point including supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 05-01-2026 to 17-01-2026 = 13 days x 1 pt.
Temporary installation of controlling station with 16amps TPN main switch on wooden plank and salbollah on hire basis including electrical connection complete as per direction of EIC.
Fitting fixing of glow sign board on salballah structure on hire basis at different places as per direction of EIC with all electrical connection including supply of all materials required to complete the work (glow sign board will be supplied by the department)
Guarding the whole installation by engaging experienced labour as per direction of EIC in three shifts from 05.01.2026 to 17.01.2026
Taking out the whole installation of the above item as per direction of EIC.
Supply and delivery of the materials at site on hire basis as per requirement to complete temporary illumination work (for Beautification arrangement) of Muriganga Bunglow) at Lot No.8 (From 08-01-2026 to 18-01-2026
12 Volt colour flexible type SNTD strip water proof light 52 Nos. strip X 50 ft Long
SMPS of capacity 10/20 Amp input – 230 Volts, 50Hz output – 12 Volt DC for power supply.
3 core 2.5 sq mm 1.1 KV grade copper unarmored cable.
Single core unarmored unsheathed 1.5 sq mm 1.1 KV grade copper cable.
Supply and delivery of the materials at site on hire basis as per requirement to complete temporary illumination work (For Beautification arrangement) of Cottage Bunglow at Lot No. – 8 (From 08-01-2026 to 18-01-2026 )
Colour flexible type (RGB) water proof strip LED light (2.5 Volt)
23 Nos. Strip X 30’ ft Long
Colour flexible type water proof casing LED light (RGB) (2.5 Volt)
22 Nos. Strip X 30’ ft Long
SMPS of Capacity 10/20 Amp input – 230 Volts, 50 Hz Output – 12 Volt DC for power supply.
3 core 2.5 sq mm 1.1 KV grade copper unarmored cable.
Single core unarmored unsheathed 1.5 sq mm 1.1 KV grade copper cable. (Required Length)
400 Watt Metal light fixture (2 Nos.)
Drawing of flood light points for Back Side portion of new bus stand area and others place as directed on supply on hire basis of 400 Watt sodium flood light fixture – 1 No., control gear box and S.r. Lamp etc., and complete the work from 08-01-2026 to 18-01-2026 = 11 days X 15 Pts.
Drawing of the flood light point as per direction of EIC and supply on hire basis of 400 Watt twin type flood light fixture and 2 Nos. Son T lamp with control gear box complete. From 08-01-2026 to 18-01-2026 = 11 Days. 11 days X 2 Pts.
Supply on hire basis of 9 mtrs. Long M.S. pole and erection and fitting fixing on the back side portion of new bus stand area as per direction of EIC. From 08-01-2026 to 18-01-2026 = 11 days.
Supply and delivery at site of ‘D’ type Iron clamp set galvanized with necessary GI nuts and washer size of 3 ½” X 5”.
Supply and delivery of site of porcelain shackle insulator Size – 70 mm X 88 mm
Fitting fixing of ‘D’ type Iron clamp parceling shackles and pole clamp in the M.S. pole of the completion of the errection work.
Drawing of L.T. feeder and distribution line from medium pressure voltage 3 phase – 4 wire system by 25 sq mm PVC single core aluminium wire on hire basis.
Making Earthing arrangement by supplying 5/8” dia earth spike of 2 mtr. Long with galvanized bolts nuts and washer etc. including supplying and fitting fixing of 8 Nos. SWG GI wire and restoration of the surface duty rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCE pole.
(SCHOOL LIGHTING) Drawing street light points from different distribution and feeder lines Salbollals post to different places directed with supply on hire basis of 100 watt bulb, holder bracket and necessary materials required to complete the work 08-01-2026 to 17-01-2026 = 10 days. 10 days X 20 Pts. X 15 Nos. School=3000 Pts.
Drawing of metal flood light points on hire basis for illumination of school compound from different feeder of 400 Watt metal flood fixture, Lamp, control gear etc., required to complete the job from – 08-01-2026 to 17-01-2026 = 10 days. 10 days X 4 Pts. X 15 Nos. School.
Supply and fitting fixing of 2 pin 5 Amps plug point for mobile charger & 3 Pin & 15 amps plug point for special purpose on hire basis.
Drawing of main line of the pump from medium pressure Voltage 3 phase 4 wire system as per IE rules and ISS rules by 50 sq mm to 25 sq mm PVC single core wire on hire basis on Salbollah post including supply of wire installation of binding wire etc. as directed before 08-01-2026 average mm 90 mtr. X 15 Nos. School.
(DRIVER ROOM) Drawing of light point of 400 Watt sodium type flood light fixture and lamp, Gear complete set on hire basis from 08-01-2026 to 17-01-2026 = 10 days. X 2 Pts. = 20 Pts.
Drawing light points from different distribution and feeders lines to different places directed with supply on hire basis of 40 watt tube light, chock starter, bulb holder and necessary materials required to complete the work. From 08-01-2026 to 17-01-2026 = 10 days X 8 Pts. = 80 Pts.
Supply and fitting fixing of 2 Pin 5 Amps plug point for mobile charger & 3 pin & 12 Amps plug point the temporary driver room on hire basis.
(High mast repairing)-Dismantling and taken out the old damaged Ballast, SON-T- Lamp, part by part after disconnection of the power line by expert electrician complete the job as per direction of EIC. (for 3 nos. high mast)
Supplying the following electrical accessories for 3 Nos. High mast :-
400 watt copper ballast. Make : Philips. Model No. BSN 400 L408 (32)
400 Watt SON-T Lamp Make : Philips
400 Watt Igniter
63 Amp 4 Pole MCCB, Make : Havells
Servicing and overhauling of lantern carriage suitable to fix 12 nos. luminous, 3 point suspension head frame, compensating disc ‘L’ – stopper (3 Nos. ) manual operating handle motor mounting plate lighting arrestor etc., part by part with proper geasing and lubricant oil after through scrapping and cleaning properly complete the job as per direction of EIC. (3 Nos. High mast)
Rectification and servicing of winch motor, trailing cable with junction Box part by part complete the job as per direction of EIC. (3 Nos. High Mast)
Rectification and overhauling of outdoor type feeder puller Box with changing of contractor, MCB and timer for operating the luminaries part by part properly by expert electrification complete the job as per direction of EIC. (3 Nos. High Mast)
Fitting fixing of the above new Ballast, Lamp for Item No.as supplied with existing position including supply of nut bolt washer and other electrical accessories by expert electrician complete the job as per direction of EIC.
Testing of the above 3 Nos. high mast with proper electrification for the mela period as per direction of EIC. (for 3 nos. high mast)
S & F of 63 A 415V TPN main switch ; MaKE: Havells/ any other approved make [ LOT 8]
S & F of 32 A 415V TPN main switch ; MaKE: Havells/ any other approved make [LOT 8]
S & F of 32 A 415V DP main switch ; MaKE: Havells/ any other approved make [LOT 8]
S & F of 100 A 415V TPN main switch ; MaKE: Havells/ any other approved make [ LOT 8]
Supply and laying of 50 sqmm 3.5 core XLPE insulated 1.1 KV grade Al Armour cable as per latest IS Spec. Make: Any approved vendor of PHED [ Location : LOT 8 , Kakdwip]
Dismentling of the Item no. 42 to 45 after completion of mela and returned back to store including loading unloading at both ends all complete
Drawing of the above 70/50/35/10 sq mm 3.5 core Al. Ar. Cable departmental supply for power connection of VIP tents by supplying on hire basis & necessary salbollah on hire basis including binding the same as per direction of EIC. Transformer to different place VIP Tents.
Drawing of the flood light point as per direction of EIC and supply on hire basis of 400 Watt twin type flood light fixture and 2 Nos. Son T lamp with control gear box complete. From 07-01-2026 to 17-01-2026 = 11 Days.[ 11 days X 15 Pts.] [ Location : Around the area of LOT 8 ]
Supply and delivery at site the special type arm bracket made with 40mm dia Gl pipe x 2 mtr long for light fixture 250watt SV lamp including MS collar welded at neck of the bracket including painting by red oxide paint as per direction of EIC.
Making canopy type LED lighting arrangement at mela ground with different coloured (yellow/ Blue/Red) LED light to be fixed by suitable G.I. wire across the road with all interconnection complete for the entire mela period i.e. from 06-01-2026 to 16-01-2026
Supply of 2 x 4 sq.mm. and 1 x 2.5 sq.mm. PVC insulated single core copper wire for main circuit line on hire basis
Supply on hire basis and drawing of L.T. distribution line from medium pressure line as per IE rules and ISS by suitable size PVC single core Aluminium wire and supply of binding wire insulation connection etc. as per direction of EIC on or before 06.01.2026
Providing on hire basis including supplying, laying and transportation charges of 7/20 or 4 sq.mm 1.1 kv grade single core PVC instated and sheathed stranded aluminium wires/cables including dismantling the same after completion of the mela
Providing on hire basis including fitting fixing of 6 circuit running changer for changing design of the canopy lighting arrangement having output volatage 12 volt DC and input 230 volt, 50 Hz. AC from 06-01-2026 to 16-01-2026
Providing on hire basis 30 Amps SMPS having input voltage 230 volt 50 Hz AC and out put voltage 12 volt DC for power supply to canopy lighting system
Dismantling of the entire installataion after completion of mela.
Supply on Hire basis 8 SWG GI wire
Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.)
Providing Guarding arrangement and deputing one no. electrician for the period of 06-01-2026 to 16-01-20206
Hire and labour charges for temporary robust gate structure as per design and direction of EIC. Ceilign hight minimum 18 ft and road covered width 60ft and 4ft depth.,head height -7 ft. The structure will be made with salbollah and or bamboo post, 6mm-8mm-12mm-16mm-19mm water proof with anti termite superior quality ply board of approved size and runner, cross support and covering with different designed materials / designed wooden/ ply board structure. The structure should be painted with weather coated oil paint (Asian Paint/Berger Paint) matching with the design. Both side of gate structure should be covered with venial backlit. The structure should be dismantled after completion of Mela. From 01-01-2026 to 16-01-2026) Total gate structure-02 nos.[1128 sqft x 2 nos.]
Making temporary decorative decent illumination arrangement of gate structure on hire basis by fitting fixing at site of decorative board on salbollah/ bamboo gate structures including decorative design LED lighting power diffetent colour and different types/pattern LED lights suitable for the design. The wiring circuit of the lights should be design with good quality approved make insulated wire of required size maintaining all precautions and all IE rules.This cost is including hiring and laying of 16 sq.mm 3.5 core Al Ar XLPE insulated cable and incomming supply should be controled by 32 amps 4 pole MCB / 32 amp TPN main switch. (The lighting arrangement inclusive of LED spot light, LED par 200 mtr-approx -20 nos and RGBW LED with DEX controler 12 channels, 10 nos, 50 watt warm white LED floor light 100 nos with warm white LED fluorescent lamp) [ The gate should incorporate 4 Nos ( 6 ft x 4 ft LED wall display unit of latest version P29 including programing as per direction N.B-Approved design and Programming will be handed over after getting confirmation from District / Local Administration
H.K.DAS AND CO. (BID ID -7240219)
B T PROJECTS PRIVATE LIMITED (BID ID -7242204)
S. P. CONSTRUCTION (BID ID -7243664)
stage.html
html • 0.05 MB
technical_2189907.pdf
techsummary_2189907.pdf
finance_2189907.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 0.89 MB
Tendernotice_4.pdf
PDF • 0.13 MB
BOQ_2189907.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid