Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC FATEHPUR | ₹17.8 L | L1 | Accepted-AOC AWARDED |
| 2 | L2₹17.8 L+₹1,427.88 (0.08%)Rejected-Finance | ₹17.8 L+₹1,427.88 (0.08%) | L2 | Rejected-Finance REJECT |
Tender Value
₹17.9 L
EMD Value
₹36,000
Closing Date
6 Jun 2026, 5:00 pmClosed
EE RED FATEHPUR
VIKAS BHAWAN FATEHPUR
Block Vijayipur Ke Gram Awadhutpur Gada Me Sahelpal Ke Ghar Se Mahaveer Pal Ke Ghar Tak Interlocking Road and Nali Nirman.
2026_REDUP_1155682_6
165/RED/E-Tender/2026-27 Date 05-05-2026
Open Tender
Civil Works
Percentage
90 days
FATEHPUR
PREIFRED NIT
3 documents required · 3 mandatory
₹854
₹36,000
VIKAS BHAWAN FATEHPUR
25 Jul 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in filling in embankment with ordinary soil at site including all complete as per SI No. 253. | 90 | cum | 225.48 | ₹20,293.43 |
| 2 | S/Laying of half brick batts its all completion of work. | 29.25 | cum | 712.5 | ₹20,840.62 |
| 3 | Earth work in excavation in foundation in ordinery soil with in 1.5 mt lift and 30 mt lead as per SI no 251 | 93.39 | cum | 90.38 | ₹8,440.87 |
| 4 | Providing and laying of 1:6:12 CC in foundation in cement sand and brick ballast 40 mm gauge including all required complete for proper completion of work as per S.I. no 273 | 104.35 | cum | 3,439 | ₹3,58,851.05 |
| 5 | M-150 class brick work in foundation with 1:4 cement & coarse sand mortar including all complete S.I. no. 305 a | 57.68 | cum | 5,139.5 | ₹2,96,466.92 |
| 6 | WBM Grading III - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and cam | 66.83 | cum | 3,820.96 | ₹2,55,335.61 |
| 7 | 12 mm thick cement plaster with 1:4 cement coarse sand mortar including all material labour etc complete as per SI no 305 A and anylises | 250.8 | cum | 162.45 | ₹40,742.46 |
| 8 | 2.5 cm thick PCC work with 1:2:4 with cement, coarse sand & stone grit including all material labour etc complete As per SI No. 601 a | 275.1 | sqm | 278.35 | ₹76,574.09 |
| 9 | Provideing of laying interlocking concrete block pavements having thickness 80 mm as per technical specification clause 1504. | 810 | sqm | 839.31 | ₹6,79,837.86 |
| 10 | RCC work in slab with 1:2:4 with cement, coarse sand & 20 mm stone grit including all material labour etc complete SI no 284 | 2.15 | cum | 8,217.5 | ₹17,626.54 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_2165063.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .