Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | -17.79% | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.6 L+₹22,915.40 (9.47%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹2.6 L+₹22,915.40 (9.47%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.8 L+₹40,574.32 (16.8%)Admitted-Fee/PreQual/Technical/Finance | -4.00% | ₹2.8 L+₹40,574.32 (16.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹8,820
Closing Date
27 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CONSTRUCTION OF LINK ROAD FROM HO MOHD SHAFI SHEIKH TO ORCHARD OF MOHD ABDULLAH GOPAL PORA KHRUD ANANTNAG
2026_RDPR_321602_136
ENIT97of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹8,820
4 Sept 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
27 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 25 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | cum | - | - |
| 2 | P/L of stone soling tightly hand packed and plumbs in mass concreting including a carriage for all leads by MT | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. | - | sqm | - | - |
| 5 | P/Laying of RCC Spun Pipes incl. E/Work in excavation and refilling the same with Nallah Muck/ RBM in Proper Position Levelling ,Providing Adequate cusion and Gradient over the Pipes incl. carrage of the same Pt site of work with loading and unloading 300 mm dia complete | - | rft | - | - |
| 6 | supply and stacking of WBM Grade 2nd. at site 63 mm-45mm size at site Incl, Carriage by M T 35 Kms | - | cum | 1 | - |
| 7 | Supply and Stacking of Screening of 11.2mm size at site incl.carriage by M T 35.00 KMS Lead | - | cum | 1 | - |
| 8 | Laying of WBM Grade 2nd including Consolidation with P R R 8-10 ton capacity incl.all necessities | - | Cum | 1 | - |
| 9 | Supply and Spreading of stone crusher dust as binding material Incl. Carriage by M T lead 35.00 Kms | 1 | cum | 1 | ₹1 |
| 10 | Carriage of all material i.e sand/bajri i/c a carriage lead of 15 Kms by MT | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_1075806.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .