| Sl No | Description | Qty | Unit | SUBRAM L2 | M. SANKAR L1 |
|---|---|---|---|---|---|
| 1.10Package No. 44 Upgradation / Strengthening of 1 No.of roads | |||||
| 1.20Strengthening of the road from Kaliyaranviduthi to Akkaraivattam road in Kaliyaranviduthi Panchayat | |||||
| 1.30Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 1.40 | Km 0/0-1/0 | 531.9 | Cum | 140 ₹74,466 | 131.29 ₹69,833.15 Lowest |
| 1.50Picking the Existing BT Surface upto 10cm Thick including all labour charges etc complete | |||||
| 1.60 | Km 0/0-1/0 | 1,252.75 | Sqm | 28 ₹35,077 | 21.84 ₹27,360.06 Lowest |
| 1.70Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.80 | Km 0/0-1/0 road | 555.3 | Cum | 2,500 ₹13,88,250 | 2,258.64 ₹12,54,222.79 Lowest |
| 1.90Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
| 2.00 | Km 0/0-1/0 road | 3,702 | Sqm | 90 ₹3,33,180 | 78.71 ₹2,91,384.42 Lowest |
Tender Value
₹72.4 L
EMD Value
₹73,000
Closing Date
26 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA., PUDUKKOTTAI
Package No. 44 Upgradation / Strengthening of 1 No.of roads Under MGSMT-2025-26 (Phase-II) in Karambakudi Panchayat Union, Pudukkottai District
2025_RDTN_553916_1
PDKT/MGSMT2025-26/KKDI44
Open Tender
Civil Works - Roads
Item Rate
180 days
KARAMBAKUDI
Please refer tender documents
4 documents required · 4 mandatory
₹0
₹73,000
DRDA PUDUKKOTTAI
30 Sept 2025
3 May 2025
26 May 2025
3 May 2025
26 May 2025
3 May 2025
13 May 2025
Amount
Package No. 44 Upgradation / Strengthening of 1 No.of roads
Strengthening of the road from Kaliyaranviduthi to Akkaraivattam road in Kaliyaranviduthi Panchayat
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the Existing BT Surface upto 10cm Thick including all labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Km 0/0-1/0 road
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Km 0/0-1/0 road
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Km 0/0-1/0 road
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Km 0/0-1/0 road
Providing and laying gravel for side berms including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp
Provision for 1.5m slab culvert -Ch
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc.,
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding wire etc.complete
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.
Collection and supply ofgravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for 1.5m slab culvert -Ch
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc.,
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding wire etc.complete
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.
Collection and supply ofgravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for 1.5m slab culvert -Ch
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc.,
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding wire etc.complete
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.
Collection and supply ofgravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Retaining wall ch-610
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Hectameterstone
Provision for Kilometerstone
Provision for 60 cm Equilateral triangle cautionary signboard
Provision for circulation board etc
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SUBRAM (BID ID -1346938)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .