| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹12.3 L+₹92,215 (8.08%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹12.8 L+₹1.4 L (12.1%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest |
Tender Value
₹17.6 L
EMD Value
₹1.8 L
Closing Date
4 Nov 2024, 10:00 amClosed
Executive Engineer
Office of Executive Engineer Irrigation Division-1st, Govindpur Prayagraj
Renovation of Kasturipur Inspection House
2024_UPIDC_966654_2
04/EE/2024-25
Open Tender
Civil Works - Buildings
Item Rate
60 days
Govindpur Prayagraj-211004
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.8 L
Yes
22 Nov 2024
19 Oct 2024
4 Nov 2024
19 Oct 2024
4 Nov 2024
19 Oct 2024
Amount
Brick work boundry wall 1:4 c m i/c cost off all type of labour materials for proper completion of work as per direction by engineer-in-charge.
Boundry wall Cement plaster 1:4 m i/c cost off all labour, materials for proper completion of work as per direction by engineer-in-charge.
Supply of angle iron size 50X50X6 mm for barbed iron wire facing in bourndy wall i/c labour, T&P etc. required for proper completion of the work.
Providing barbed iron wire fencing including fixing it to post after stretching , labour, T&P etc. required for proper completion of the work.
Laying P.C.C. 1:2:4 for Fixing angle iron for barbed iron wire facing in bourndy wall and septic tank and floor i/c labour, T&P etc. required for proper completion of the work.
Finishing wall with two coat of water proof cement paint of of boundry wall of premium quality on previously old treated surface to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials.
E/W in foundation for interlocking paver block i/c cost off all type of labour materials for proper completion of work as per direction by engineer-in-charge.
PCC 1:3:6 in foundation for interlocking paver block i/c cost off all type of labour materials for proper compaction of work as per direction by engineer-in-charge.
Brick work both side of interlocking1:4 c m i/c cost off all type of labour materials for proper completion of work as per direction by engineer-in-charge.
S/Laying local sand i/c cost off all type of labour materials for proper completion of work as per direction by engineer-in-charge.
Zig-Zag 80 mm thick Tiles of pre-cast compressed Cement Concrete interlocking paver block in cement or gray colour & tata red colour i/c cost of all material labour T&P required for proper completion of work.
MOHD KAMRAN
MOHD ALMEEN
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .