| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹2.4 L+₹34,520 (17.0%)Accepted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
₹2.4 L
EMD Value
₹2,500
Closing Date
6 Jul 2020, 2:00 pmClosed
SE Ciivl TTPS
Office of the SE/Civil/TTPS/Tuticorin - 4
Repair and maintenance works in Chimney 1 for Unit 1 and 2 to arrest flue gas leakage and rectification work in fire brick lining and removal of fly ash from the hopper of Chimney at 18 mtr. level
2020_EB_169675_1
SE Civil TTPS 99 2020 2021
Open Tender
Civil Works
Works
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
8 Jul 2020
24 Jun 2020
7 Jul 2020
24 Jun 2020
6 Jul 2020
24 Jun 2020
Amount
Collecting scaffolding 50 Nos. MS pipe 40mm dia. From switchyard-I & II stores. The collected pipes are to be brought to bottom of the chimney by head load. The rate includes of all lead, lift etc., complete.
Lifting the pipe from bottom of chimney to platform at (+) 18 mtr. Level by using manila rope pulley. The pipes will be lifted one by one and keeping on the platform and the insert the same pipe inside chimney through the door opening and lowering the same pipe to the sill level of hopper by using manila rope. The same pipe to be collected at the sill level of hopper without distributing fire brick lining of chimney wall and hopper cone portion. The rate includes attending work in odd hours and ash polluted area inside of chimney lead, lift etc., complete
Erection of scaffolding form workup to a required level for attending rectification work by using tools and tackles wooden platform to be provided on either side with wooden planks 40mm thick at three different level. The rate includes for attending work in critical area in odd hours and highly flu ash polluted area of chimney all lead, lift cost of planks etc., complete for one unit area.
Dismantling the form work on completion of work carefully without disturbing existing brick lining and new work. The dismantling pipe to be lifted to the top of door opening end and the same to be lowered to the outside bottom of chimney. The rate includes attending work in night ours and in critical area, all lead, lift cost of manila rope etc., complete for one unit operation.
Conveying the 50Nos., 40mm dia scaffolding pipes to the field stores at switch yard-I & II by head load, lead, lift, etc., complete for one unit area.
Providing 20mm thick plastering with Fire Crete Cement mortar to cover the crack developed area and other vertical fracas including lead, lift, etc., complete.
Supplying and providing Fire Crete Cement (for contract supply) rate including cost of fire crete cement, lead, lift etc., complete.
Ramesh Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .