Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹38.6 LAccepted-AOC 15 1 1F MAYUR BHANJ ROAD PS EKBALPORE KOLKATA 700 023 | MURSHIDABAD | WEST BENGAL | 700023 | ₹38.6 L | L-1 | Accepted-AOC Accepted |
| 2 | L-2₹39.0 LRejected-Finance 30 SHIVTALLA STREET KOLKATA 700 007 | KOLKATA | WEST BENGAL | 700007 | ₹39.0 L | L-2 | Rejected-Finance Other than lowest bidder |
| 3 | L-3₹39.5 LRejected-Finance BMC 1 54 GANTI NETAJI PALLY PO GANGANAGAR KOLKATA 700 132 INDIA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | ₹39.5 L | L-3 | Rejected-Finance Other than lowest bidder |
| 4 | L-4₹39.9 LRejected-Finance 3 IBRAHIM ROAD KHIDDERPORE KOLKATA 700023 | KOLKATA | WEST BENGAL | 700023 | ₹39.9 L | L-4 | Rejected-Finance Other than lowest bidder |
| 5 | L-5₹40.6 LRejected-Finance 66 14 ATINDRA MUKHERJEE LANE SHIBPUR HOWRAH 711102 | HOWRAH | WEST BENGAL | 711102 | ₹40.6 L | L-5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | THE PLANTERS ENGINEERING CORPORATION L8 | M/S AVIJEET INTERNATIONAL L6 | R.R.ENTERPRISE L7 | SUDHA ENTERPRISES L2 | DIPAK ENTERPRISE L1 | EASTERN REFRIGERATION AND ELECTRICAL CO L4 | BENGAL TRADERS L5 | KT CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing all unsound concrete, plastered material by chipping/chiseling gently at all effected and adjoining areas of concrete etc till sound surface is reached all various locations in building subsequently cleaning the surfaces by hair brush and air blower and removing rubbish off the premises including hoisting assembling and fixing of double layer steel scaffolding to external perimeter of building complete all as specified and directed.
Note: Work shall be carried out to bldgs upto height of 4 storey. | 150 | Sqm | 170 ₹25,500 | 160 ₹24,000 | 165 ₹24,750 | 145 ₹21,750 | 142 ₹21,300 | 159 ₹23,850 | 162 ₹24,300 | 155 ₹23,250 |
| 2.00 | All as per BOQ Serial item No 01 above but for 5 to 8 storied bldg complete all as specified and directed. | 80 | Sqm | 175 ₹14,000 | 170 ₹13,600 | 170 ₹13,600 | 148 ₹11,840 | 145 ₹11,600 | 162 ₹12,960 | 165 ₹13,200 | 160 ₹12,800 |
| 3.00 | Removing of concrete all around reinforcement bar upto 12 mm dia and over from behind the reinforcing bars average 25mm (but not less than 15mm air gap)by manual methods (using wire brushing ,chiseling etc) and M&L for applying chloride free rust removing chemical on rusting steel reinforcement bar and removing all rust from steel reinforcement bar by emery paper and cleaning the area thoroughly by water and allow it to dry and totally rust free of reinforcement bar all as complete all as specified and directed.
Make(Rust removing chemical ):-Reebaklens RR of FOSROC or equivalents solutions SIKA/STP or equivalent as approved by GE
Note: Work shall be carried out to bldgs upto height of 4 storey. | 1,000 | RM | 50 ₹50,000 | 45 ₹45,000 | 48 ₹48,000 | 38 ₹38,000 | 35 ₹35,000 | 40 ₹40,000 | 42 ₹42,000 | 40 ₹40,000 |
| 4.00 | All as per BOQ Serial item No 03 above but for 5 to 8 storied bldg complete all as specified and directed. | 600 | RM | 55 ₹33,000 | 48 ₹28,800 | 50 ₹30,000 | 42 ₹25,200 | 40 ₹24,000 | 44 ₹26,400 | 45 ₹27,000 | 45 ₹27,000 |
| 5.00 | Preparation of existing reinforcement surface by brush and M&L for applying two component epoxy zinc rich primer on existing reinforcement surface of minimum specific gravity 1.75, adhesive bond strength with steel is 1.50N/mm2 and maximum coverage area 5.00 Sqm per litre. complete all as specified and directed.
Make- Nitozinc primer of FOSROC or equivalent as approved by GE.
Note: Work shall be carried out to bldgs upto height of 4 storey. | 500 | RM | 60 ₹30,000 | 53 ₹26,500 | 55 ₹27,500 | 45 ₹22,500 | 40 ₹20,000 | 52 ₹26,000 | 50 ₹25,000 | 50 ₹25,000 |
| 6.00 | All as per BOQ Serial item No 05 above but for 5 to 8 storied bldg complete all as specified and directed. | 300 | RM | 65 ₹19,500 | 55 ₹16,500 | 60 ₹18,000 | 48 ₹14,400 | 45 ₹13,500 | 55 ₹16,500 | 52 ₹15,600 | 52 ₹15,600 |
| 7.00 | M&L for TMT bars upto 12 mm dia and over for structural connection in RCC beams, columns, lintel and slabs including power drilling holes of appropriate diameters in reinforced or plain cement concrete to a minimum depth of 150mm and upto 200mm including power drilling, fixing the reinforcement in position using epoxy, cleaning of loose dust by blowing air, sealing with epoxy cartridges etc complete all as specified and directed.
Note: Work shall be carried out to bldgs upto height of 4 storey. | 500 | RM | 160 ₹80,000 | 145 ₹72,500 | 155 ₹77,500 | 130 ₹65,000 | 135 ₹67,500 | 145 ₹72,500 | 142 ₹71,000 | 135 ₹67,500 |
| 8.00 | All as per BOQ Serial item No 07 above but for 5 to 8 storied bldg complete all as specified and directed. | 300 | RM | 165 ₹49,500 | 155 ₹46,500 | 160 ₹48,000 | 132 ₹39,600 | 140 ₹42,000 | 150 ₹45,000 | 148 ₹44,400 | 140 ₹42,000 |
| 9.00 | Supply, mixing and placement of micro-concrete cement based prepacked single component chloride free, sulphate free, non-shrink, free flow. self compacting, ready to use after mixing water in specified proportion and required thickness over a coat of epoxy resin bonding agent ( Make: Sika Rep Microconcrete-4 or renderoc-RG of Fosroc or equivalent make as approved by GE) in required thickness as per manufacture's instruction and all as directed. Compressive strength (ASTN C 109,cm cube) of 35 MPa at 28 days including application curing compound concrete WB manufactured by Fosroc of equivalent at various locations in Bldgs including necessary form work complete all as specified and directed.
Note: Work shall be carried out to bldgs upto height of 4 storey. | 3 | Cum | 52,500 ₹1.6 L | 54,500 ₹1.6 L | 53,500 ₹1.6 L | 44,550 ₹1.3 L | 43,550 ₹1.3 L | 53,550 ₹1.6 L | 55,250 ₹1.7 L | 46,550 ₹1.4 L |
| 10.00 | All as per BOQ Serial item No 09 above but for 5 to 8 storied bldg complete all as specified and directed. | 0.5 | Cum | 54,500 ₹27,250 | 55,250 ₹27,625 | 54,250 ₹27,125 | 45,250 ₹22,625 | 44,350 ₹22,175 | 54,250 ₹27,125 | 56,250 ₹28,125 | 47,750 ₹23,875 |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
15 Apr 2026, 6:00 pmClosed
Garrison Engineer Alipore
NO 1 NATIONAL LIBRARY AVENUE, ALIPORE, KOLKATA 700027
COMPREHENSIVE MAINTENANCE OF OLD BLDGS OF CH (EC) AREA UNDER GE ALIPORE
2026_MES_757740_1
GE/ALP (8629) KOLKATA OF 2026-27
Open Tender
Civil Works
270 days
Garrison Engineer Alipore
Class D category a (i)
10 documents required · 10 mandatory
₹500
Garrison Engineer Alipore
₹76,000
Yes
Garrison Engineer Alipore
5 Jun 2026
25 Mar 2026
17 Apr 2026
25 Mar 2026
15 Apr 2026
8 Apr 2026
25 Mar 2026 - 1 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Dismantling and removing all unsound concrete, plastered material by chipping/chiseling gently at all effected and adjoining areas of concrete etc till sound surface is reached all various locations in building subsequently cleaning the surfaces by hair brush and air blower and removing rubbish off the premises including hoisting assembling and fixing of double layer steel scaffolding to external perimeter of building complete all as specified and directed.
Note: Work shall be carried out to bldgs upto height of 4 storey. | - | Sqm | - | - | |
All as per BOQ Serial item No 01 above but for 5 to 8 storied bldg complete all as specified and directed. | - | Sqm | - | - | |
Removing of concrete all around reinforcement bar upto 12 mm dia and over from behind the reinforcing bars average 25mm (but not less than 15mm air gap)by manual methods (using wire brushing ,chiseling etc) and M&L for applying chloride free rust removing chemical on rusting steel reinforcement bar and removing all rust from steel reinforcement bar by emery paper and cleaning the area thoroughly by water and allow it to dry and totally rust free of reinforcement bar all as complete all as specified and directed.
Make(Rust removing chemical ):-Reebaklens RR of FOSROC or equivalents solutions SIKA/STP or equivalent as approved by GE
Note: Work shall be carried out to bldgs upto height of 4 storey. | - | RM | - | - | |
All as per BOQ Serial item No 03 above but for 5 to 8 storied bldg complete all as specified and directed. | - | RM | - | - | |
Preparation of existing reinforcement surface by brush and M&L for applying two component epoxy zinc rich primer on existing reinforcement surface of minimum specific gravity 1.75, adhesive bond strength with steel is 1.50N/mm2 and maximum coverage area 5.00 Sqm per litre. complete all as specified and directed.
Make- Nitozinc primer of FOSROC or equivalent as approved by GE.
Note: Work shall be carried out to bldgs upto height of 4 storey. | - | RM | - | - | |
All as per BOQ Serial item No 05 above but for 5 to 8 storied bldg complete all as specified and directed. | - | RM | - | - | |
M&L for TMT bars upto 12 mm dia and over for structural connection in RCC beams, columns, lintel and slabs including power drilling holes of appropriate diameters in reinforced or plain cement concrete to a minimum depth of 150mm and upto 200mm including power drilling, fixing the reinforcement in position using epoxy, cleaning of loose dust by blowing air, sealing with epoxy cartridges etc complete all as specified and directed.
Note: Work shall be carried out to bldgs upto height of 4 storey. | - | RM | - | - | |
All as per BOQ Serial item No 07 above but for 5 to 8 storied bldg complete all as specified and directed. | - | RM | - | - | |
Supply, mixing and placement of micro-concrete cement based prepacked single component chloride free, sulphate free, non-shrink, free flow. self compacting, ready to use after mixing water in specified proportion and required thickness over a coat of epoxy resin bonding agent ( Make: Sika Rep Microconcrete-4 or renderoc-RG of Fosroc or equivalent make as approved by GE) in required thickness as per manufacture's instruction and all as directed. Compressive strength (ASTN C 109,cm cube) of 35 MPa at 28 days including application curing compound concrete WB manufactured by Fosroc of equivalent at various locations in Bldgs including necessary form work complete all as specified and directed.
Note: Work shall be carried out to bldgs upto height of 4 storey. | - | Cum | - | - | |
All as per BOQ Serial item No 09 above but for 5 to 8 storied bldg complete all as specified and directed. | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
tenedrdoc.pdf
Tender Documents • 1.09 MB
sch.pdf
Additional Documents • 0.20 MB
BOQ_848760.xls
BOQ • 1.93 MB
Download all tender documents and submit your bid