| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.5 LAccepted-AOC NO 17 NEW CAUVERY NAGAR THANJAVUR 613 001 | THANJAVUR | TAMIL NADU | 613001 | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹39.0 L+₹51,094.52 (1.33%)Rejected-Finance NO 13 273 FIRST FLOOR MIG MARUTHAM NEW HOUSING UNIT THANJAVUR 613005 | THANJAVUR | THANJAVUR | TAMIL NADU | 613005 | L2 | Rejected-Finance Highest Rate |
| Sl No | Description | Qty | Unit | SRI JAGATHI CONSTRUCTION L1 | Durairaj Jeevagan L2 |
|---|---|---|---|---|---|
| 1.00Part.1. Renewal Bt to Katharinatham Union road in katharinatham Panchayat Km 0/0 - 1/600. | |||||
| 2.00Clearing scrub jungle including all labour charges fro burrying and burning etc., | |||||
| 3.00 | Km 0/0-1/600 | 1,920 | Sq.m | 6.3 ₹12,096 Lowest | 7 ₹13,440 |
| 4.00Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | |||||
| 5.00 | Km 0/0-1/600 | 432 | Cu.m | 140.3 ₹60,609.6 Lowest | 145 ₹62,640 |
| 6.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||
| 7.00 | Km 0/0-1/000 | 6.18 | Cu.m | 5,284 ₹32,655.12 Lowest | 5,300 ₹32,754 |
| 8.00 | Km 1/0-1/600 | 7.76 | Cu.m | 5,292 ₹41,065.92 Lowest | 5,350 ₹41,516 |
| 9.00Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | |||||
| 10.00 | Km 0/0-1/600 | 6,061 | Sq.m | 34.3 ₹2,07,892.3 Lowest | 37 ₹2,24,257 |
Tender Value
₹44.7 L
EMD Value
₹44,700
Closing Date
18 Feb 2026, 3:00 pmClosed
Project Director, DRDA,Thanjavur
DRDA Office, 2nd Floor, New Collectorate, Thanjavur
Thanjavur District - Package No.01 - Renewal BT to 2 Road works in Ammapettai Block under Rural Road Maintenance - 2025-2026.
2026_RDTN_655360_1
Rc.No.5906/2025/A7 Dated.09.02.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Ammapettai
As per Tender document
9 documents required · 9 mandatory
₹0
₹44,700
8 Apr 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part.1. Renewal Bt to Katharinatham Union road in katharinatham Panchayat Km 0/0 - 1/600. | - | - | - | - |
| 2 | Clearing scrub jungle including all labour charges fro burrying and burning etc., | - | - | - | - |
| 3 | Km 0/0-1/600 | - | Sq.m | - | - |
| 4 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | - | - | - | - |
| 5 | Km 0/0-1/600 | - | Cu.m | - | - |
| 6 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | - | - | - | - |
| 7 | Km 0/0-1/000 | 1 | Cu.m | - | - |
| 8 | Km 1/0-1/600 | 1 | Cu.m | - | - |
| 9 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | - | - | - | - |
| 10 | Km 0/0-1/600 | - | Sq.m | - | - |
stage.html
html • 0.04 MB
technical_785842.pdf
techsummary_785842.pdf
finance_785842.pdf
BOQ Comparative Chart
xlsx
finsummary_785842.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_785842.xls
BOQ • 0.29 MB
PackageNo01AmmapettaiTechnicalBid.pdf
Tender Documents • 0.67 MB
pkg01AmmapettaiPricebid.pdf
Tender Documents • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .