| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC As pr NIT |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance As per NIT |
| 3 | L3₹1.5 CrRejected-Finance MAJOR KOTHI NOVA BAGAR BAJRA ITKI ROAD DISTT RANCHI JHARKHAND | RANCHI | RANCHI | JHARKHAND | ₹1.5 Cr | L3 | Rejected-Finance As per NIT |
| 4 | L4₹1.6 CrRejected-Finance | ₹1.6 Cr | L4 | Rejected-Finance As per NIT |
| 5 | L5₹2.1 CrRejected-Finance | ₹2.1 Cr | L5 | Rejected-Finance As per NIT |
| Sl No | Description | Qty | Unit | MECO TECHNOLOGIES PVRIVATE LIMITED L2 | WTE INFRA PROJECTS PVT LTD L5 | M/S CLASSIC INDIA L3 | Greenagers Enviro Solution And Services Private L4 | AN Engineers & Chemicals L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Surveying, Geotechnical investigation, preparation of Contour Plan and other related works like clearing the STP plant sites and making it complete in all respect etc. | 1 | Nos | 5,50,000 ₹5.5 L | 1,50,000 ₹1.5 L | 3,20,000 ₹3.2 L | 67,796.61 ₹67,796.61 | 1,00,000 ₹1 L |
| 2.00 | Planning , DESIGN, ENGINEERING, CONSTRUCTION, of sewage networks (DWC HDPE Pipes) including providing inspection chambers, intermediate pumping arrangement (if required) and all associated works making it complete in all respect. | 1,200 | meter | 1,200 ₹14.4 L | 3,300 ₹39.6 L | 1,000 ₹12 L | 1,864.41 ₹22.4 L | 2,250 ₹27 L |
| 3.00 | Supply, installation, testing and commisioning of STP of capacity 100 KLD based on MBBR Technology as per scope of work given , including civil work (except Plant Room), Electrical, Mechanical works, electro-mechanical equipments, development works, horticulture works etc. in all complete. | 1 | Nos | 76,00,000 ₹76 L | 75,98,600 ₹76.0 L | 72,87,000 ₹72.9 L | 67,79,661 ₹67.8 L | 40,00,000 ₹40 L |
| 4.00 | Construction of control Room of minimum area 36 sqm and 3.0 m minimum height, adequate foundation as required, 9” brick wall, sufficient windows, Doors, Roof: M30 RCC roof, Flooring: required flooring,Internal water supply and sanitary Installations, internal/external electrifications, all complete as per direction of EIC for STP. | 1 | Nos | 3,60,000 ₹3.6 L | 5,08,235.29 ₹5.1 L | 5,46,000 ₹5.5 L | 6,77,966.1 ₹6.8 L | 6,50,000 ₹6.5 L |
| 5.00 | Construction of Precast RCC boundary wall (Minimum lengh of 60 m) of height 1500 mm and 600 mm MS grill as per CPWD Specifications, in M40 grade concrete comprising I shaped 250 x 230 mm RCC posts fixed in ground and 70 mm thick RCC wall panel inserts around STP Plant. with Main entrance gate for STPs plant premises. | 60 | meter | 1,500 ₹90,000 | 5,000 ₹3 L | 8,100 ₹4.9 L | 2,711.86 ₹1.6 L | 4,000 ₹2.4 L |
| 6.00 | Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand ,providing PCC bed below it etc. complete as per CPWD specifications/ as per direction of EIC for STP. | 250 | sqm | 500 ₹1.3 L | 1,000 ₹2.5 L | 740 ₹1.9 L | 593.22 ₹1.5 L | 900 ₹2.3 L |
| 7.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead
as per direction of Engineer-in-charge :In cement mortar | 300 | cum | 750 ₹2.3 L | 1,800 ₹5.4 L | 900 ₹2.7 L | 847.45 ₹2.5 L | 150 ₹45,000 |
| 8.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge : Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 50 | cum | 950 ₹47,500 | 2,500 ₹1.3 L | 2,200 ₹1.1 L | 4,406.78 ₹2.2 L | 150 ₹7,500 |
| 9.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area beyond 3 sq. metres | 80 | Nos | 750 ₹60,000 | 800 ₹64,000 | 290 ₹23,200 | 847.45 ₹67,796 | 50 ₹4,000 |
| 10.00 | Providing, laying, testing and commissioning of LT underground cable of size 4 Core × 35 sqmm, Aluminium conductor, XLPE insulated, PVC sheathed, armoured, 1.1 kV grade, conforming to IS:7098 (Part-1), complete in all respects. | 250 | meter | 350 ₹87,500 | 450 ₹1.1 L | 250 ₹62,500 | 576.27 ₹1.4 L | 300 ₹75,000 |
Tender Value
₹2.1 Cr
EMD Value
₹2.7 L
Closing Date
23 Feb 2026, 5:00 pmClosed
HOD (CIVIL), CMPDI, RI-6, SINGRAULI
CIVIL ENGINEERING DEPTT, CMPDI, RI-6, SINGRAULI
PLANNING, DESIGN, ENGG, CONST., FABRICATION, ERECTION, SUPPLY, INSTALLATION, TESTING, TRIAL RUN AND COMMISSIONING OF STP BASED ON MBBR TECHNOLOGY OF 100 KLD CAPACITY INCL. CONST. OF SEWAGE NETWORKS WITH OPERATION FOR FIVE YEARS AT CMPDI RI-VI COLONY
2026_CMPDI_352177_1
CMPDI/RI-VI/CIVIL/e-T/25-26/01 dt.06.02.2026
Turnkey
Civil Works - Others
180 days
CMPDI COLONY, RI-6, JAYANT
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.7 L
19 May 2026
9 Feb 2026
24 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
9 Feb 2026 - 20 Feb 2026
Surveying, Geotechnical investigation, preparation of Contour Plan and other related works like clearing the STP plant sites and making it complete in all respect etc.
Planning , DESIGN, ENGINEERING, CONSTRUCTION, of sewage networks (DWC HDPE Pipes) including providing inspection chambers, intermediate pumping arrangement (if required) and all associated works making it complete in all respect.
Supply, installation, testing and commisioning of STP of capacity 100 KLD based on MBBR Technology as per scope of work given , including civil work (except Plant Room), Electrical, Mechanical works, electro-mechanical equipments, development works, horticulture works etc. in all complete.
Construction of control Room of minimum area 36 sqm and 3.0 m minimum height, adequate foundation as required, 9” brick wall, sufficient windows, Doors, Roof: M30 RCC roof, Flooring: required flooring,Internal water supply and sanitary Installations, internal/external electrifications, all complete as per direction of EIC for STP.
Construction of Precast RCC boundary wall (Minimum lengh of 60 m) of height 1500 mm and 600 mm MS grill as per CPWD Specifications, in M40 grade concrete comprising I shaped 250 x 230 mm RCC posts fixed in ground and 70 mm thick RCC wall panel inserts around STP Plant. with Main entrance gate for STPs plant premises.
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand ,providing PCC bed below it etc. complete as per CPWD specifications/ as per direction of EIC for STP.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :In cement mortar
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge : Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area beyond 3 sq. metres
Providing, laying, testing and commissioning of LT underground cable of size 4 Core × 35 sqmm, Aluminium conductor, XLPE insulated, PVC sheathed, armoured, 1.1 kV grade, conforming to IS:7098 (Part-1), complete in all respects.
Comprehensive operation in 24x7, maintenance contract including necessary servicing and replacement of spare parts (OEM) etc. complete
1st Year of Comprehensive operation and maintenance charges as per scope of work including cost of chemicals, consumables etc & disposal of sludge, as per the CPCB guidelines or as per direction of EIC.
2nd Year of Comprehensive operation and maintenance charges as per scope of work including cost of chemicals, consumables etc & disposal of sludge, as per the CPCB guidelines or as per direction of EIC.
3rd Year of Comprehensive operation and maintenance charges as per scope of work including cost of chemicals, consumables etc & disposal of sludge, as per the CPCB guidelines or as per direction of EIC.
4th Year of Comprehensive operation and maintenance charges as per scope of work including cost of chemicals, consumables etc & disposal of sludge, as per the CPCB guidelines or as per direction of EIC.
5th Year of Comprehensive operation and maintenance charges as per scope of work including cost of chemicals, consumables etc & disposal of sludge, as per the CPCB guidelines or as per direction of EIC.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BOQ_365059.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid