| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 CrAccepted-AOC | ₹17.7 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹17.8 CrRejected-Finance | ₹17.8 Cr | L2 | Rejected-Finance Not Admitted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.9 Cr
EMD Value
₹35.7 L
Closing Date
4 Feb 2025, 12:00 pmClosed
SE, JNP.GZP CIRCLE, PWD, JAUNPUR
SE, JNP.GZP CIRCLE, PWD, JAUNPUR
W/S of Tiyara Ratasi Singaramau (ODR) Road
2024_CEUVZ_987275_1
5076/Camp/SE Tender/jnp-gzp circle/24 date 05-12-2024
Open Tender
Civil Works
365 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹35.7 L
Yes
SE, JNP.GZP CIRCLE, PWD, JAUNPUR
20 Mar 2025
26 Dec 2024
4 Feb 2025
26 Dec 2024
4 Feb 2025
26 Dec 2024
26 Dec 2024
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Compaction Only) (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing, laying, spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/ subgrade and compacting with the road roller to achieve the desire density. (ETA) (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and laying dense graded bituminous macadam (Grade-2) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.50 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Morth specification clause No. 505 complete in all respects. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and applying tack coat-2 with bitumen (VG-10) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and laying bituminous concrete (Grade-2) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Reinforced Cement Concrete (M-20) in open foundation complete as per drawing and technical Specification .(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Plain Cement Concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days foundation.(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
1st class brick work with M-15 brick with cement & coarse sand in 1:4 S.I.No 305B. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Struck Cement Pointing with cement mortar 1:2 S.I. No 574(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
RCC Hume Pipe NP-3 (450mm) including collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
RCC Hume Pipe NP-3 (600mm) including collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
RCC Hume Pipe NP-3 (900mm) including collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. As per MORTH Sr.No. 13.10 and 710.1.4.of IRC:78 and 2200 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Plain cement concrete 1:3:6 with crushed stone nominal mix in foundation aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days.(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
RCC Grade M-30 using batching plant transit mixer & manual placing as per MORTH SI. No. 12.9 Case-II and specification No.1500, 1700, 2100 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Plain cement concrete in open foundation complete and as per drawing technical specifications. (M-15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 & 1800 (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
Providing weep holes in Brick masonry /plain /Reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specificationsl No. 2706 & 2200 .(Including Cost of All Material T&P, Royalty, Taxes, Labour Cess etc but Excluding GST)
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
1st year- maintainance cost 0% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
2nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3rd year- maintainance cost 0.50 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
4th year- maintainance cost 0.75% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
5th year- maintainance cost 1.00 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
MAGNIFIQUE INFRASOLUTIONS PVT LTD (BID ID -4832833)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf