Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance SFNO 73 UTHUKULI ROAD MANNARAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹5.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.1 L+₹3,040 (0.60%)Accepted-Finance | ₹5.1 L+₹3,040 (0.60%) | L2 | Accepted-Finance L2 |
| 3 | L3₹5.1 L+₹3,708 (0.74%)Rejected-Finance | ₹5.1 L+₹3,708 (0.74%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.1 L+₹5,933 (1.18%)Rejected-Finance | ₹5.1 L+₹5,933 (1.18%) | L4 | Rejected-Finance L4 |
| 5 | L5₹5.8 L+₹72,680 (14.4%)Rejected-Finance | ₹5.8 L+₹72,680 (14.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
18 Sept 2026, 3:00 pmClosed
Executive Engineer
The Executive Engineer PWD Buildings construction and Maintenance Division Vellore 6
Special Repairs to Water Supply Sanitary Arrangements and Other Repairs in Buildings C and M Section office at Katpadi in Vellore District
2026_PWD_700746_1
6T4/VLR-DIV/26-27/Dt.02.09.26
Open Tender
Civil Works - Buildings
Percentage
90 days
Katpadi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,500
22 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling clearing away and carefully stacking materials useful for reuse for any thickness for weathering course and pressed tiles etc., complete complying with standard specifications. | 34.3 | M2 | 49.2 | ₹1,687.56 |
| 2 | Dismantling clearing away and carefully stacking materials useful for reuse of floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs etc., complete complying with standard specifications. | 63.8 | M2 | 65.56 | ₹4,182.73 |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken granite stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation and flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specifications and as directed by the departmental officers. | 2 | M3 | 5,478.45 | ₹10,956.9 |
| 4 | Flooring with Joint free Rectified Glazed Ceramic Flooring Tiles 305 x 305 x 8mm laid over 20mm thick in cement mortar 1:3 (One cement and Three M-sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.30 kg. / sq.m. etc., complete complying with standard specifications. (The make and brand of the tiles should be Johnson / Kajaria / Somany / Nitco / RAK or Equivalent which has to be got approved by the Executive Engineer before use on works) | 10 | M2 | 1,030.07 | ₹10,300.7 |
| 5 | Dadooing walls with Colour designed digital print ceramic tiles, with borders, with size of 300mm x 450mm x 8mm and above set in Cement Mortar 1:2 (One Cement and Two M-sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specifications and as directed by the departmental officers. (The make and brand of the tiles should be like Johnson / Kajaria / Somany / Nitco / RAK or Equivalent which has to be got approved by the Executive Engineer before use on works) | 42.5 | M2 | 1,620.14 | ₹68,855.95 |
| 6 | Paving the floor with best quality Double Charged Vitrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three M-sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specifications. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works) | 29.6 | M2 | 1,573.85 | ₹46,585.96 |
| 7 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specifications and as directed by the deparmental officers. | 3 | M3 | 4,193.45 | ₹12,580.35 |
| 8 | Finishing the top of roof with one course of machine pressed tiles of size 230 x 230 x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 39.7 | M2 | 1,346.14 | ₹53,441.76 |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five M-Sand), 12mm thick in all floors with plasticizer including curing etc. complete complying with standard specifications and as directed by the departmental officers. | 33.5 | M2 | 290.13 | ₹9,719.36 |
| 10 | Supplying and fixing plain Glass - 4mm thick | 13.1 | M2 | 306.9 | ₹4,020.39 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
TenderDocSectionofcmr.pdf
Tender Documents • 0.23 MB
GeneralConditionofContract.pdf
Additional Documents • 0.29 MB
BOQ_842290.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .