| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC UTTAR PRADESH UP | AGRA | UTTAR PRADESH | 283110 | ₹32.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹35.0 LRejected-Finance GORAKHPUR GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹35.0 L | L2 | Rejected-Finance NOT ADMITTED |
| 3 | Not Admitted-Finance UTTAR PRADESH | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹38.8 L
EMD Value
₹3.9 L
Closing Date
15 Dec 2025, 12:00 pmClosed
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
C/o Raipur Nale par 2x3.00x3.00 Mtr RCC Box Culvert Approach and Additional Approach Road in Distt Jaunpur
2025_CEUVZ_1097941_1
5656/SE Tender/jnp-gzp circle/25 Date-03-12-2025
Open Tender
Civil Works
180 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹3.9 L
Yes
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
7 Feb 2026
10 Dec 2025
15 Dec 2025
10 Dec 2025
15 Dec 2025
10 Dec 2025
10 Dec 2025
Earth work in excavation in foundation of structures as per drawing and technical specification including setting out construction of shoring and bressing of sides and bottom, back filling the and excavated earth to the extent required utilising the ramaining earth locally for road work in widening portion. SI No. 251 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Granular filling including cost of materials cartage upto site loading unloading all taxes etc. complete for culvert Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Plain cement concrete in open foundation complete and as per drawing technical specifications. (M- 15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
RCC Grade M25 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing clause 2706 & 2200 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Providing & laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specification Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead : Thickness above 40 mm up to 75 mm As Per DSR No 15.40.2Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Packing with brick bats on back side of abutment of wing wall Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Dewatering for foundation & plingth including all T&P fuel etc complete Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert)
Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 & Diversion Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Construction of granular sub-base by providing close graded Material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rovator at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 ller to achieve the desired density, complete as per clause 401 Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface cleaned with mechanical broom. Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Providing, laying and rolling of Open-graded premix surfacing of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen the required line grade and level to serve as wearing course on a previously prepared base. including mixing in a suitable plant , laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade.. Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Providing, and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonne/hours using crushed stone chipping 2.36 mm. Size and penetration bitumen of suitable grade.levels,grade and cross fall using type B seal coats. Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, transporting to site, spresding grading to reqiire slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 in Patri Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
Providing & Laying brick on edge soling over burnt bricks including preparation of sub grade to prescribed camber filling joint with local earth over entire surface and including labour, T&P etc complete work As per SI No 762b Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2021931.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid