| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC 223 4TH STREET SIVANANDHAPURAM SARAVANAMPATTI PO COIMBATORE 641 035 | COIMBATORE | TAMIL NADU | 641035 | ₹8.4 L | L1 | Accepted-AOC L1 and responsive |
| Sl No | Description | Qty | Unit | ssk builders |
|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders. | 27 | Cum | 5,400 ₹6,372 |
| 2.00 | PCC 1:3:6, using 20mm HBG metal foundation including cost of cement, all materials, labour, lead, lift, etc. complete. | 30 | Cum | 1,66,500 ₹2.0 L |
| 3.00 | RCC 1:2:4 using 12-20mm graded hard machine broken granite stone, including cost of all materials, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. | 27 | Cum | 2,97,000 ₹3.5 L |
| 4.00 | Brick work in CM 1:3 using II class chamber burnt bricks for partition wall, including cost of all materials, all labour charges, lead, lift, etc. complete. | 8.7 | Cum | 72,645 ₹85,721.10 |
| 5.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in position of the steel reinforcement all materials, lead and lift etc., complete. | 810 | Kg | 76,950 ₹90,801 |
| 6.00 | Providing expansion joint for road concrete at 5 Meter intervals in both direction using Bitumen felt 15mm thick pad to full width including all materials, lead, lift, labour, T&Ps etc., complete. | 20.25 | Sqm | 69,862.5 ₹82,437.75 |
| 7.00 | Plastering with cm 1:5, 12mm thick for surfaces below ground level including cost of cement, all materials, curing, labour, lead and lift etc., complete. | 37 | Sqm | 11,100 ₹13,098 |
| 8.00 | White washing two coats with white cement and robin blue pigment over a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc., including cost of all materials, lead, lift, etc., complete. | 36 | Sqm | 3,600 ₹4,248 |
| 9.00 | Collection, supplying, stacking and spreading of red gravel with compacted by power roller including cost of all materials lead lift labour etc. complete as per the direction of site engineer. | 18 | Cum | 5,400 ₹6,372 |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
25 Aug 2025, 2:00 pmClosed
SE/TIRUPUR EDC/TNPDCL
OFFICE OF THE SUPERINTENDING ENGINEER/TIRUPPUR EDC, CIVIL SECTION, 208/650, KRBS TOWERS, IIIrd FLOOR, PERUMANALLUR ROAD, TIRUPPUR-02
Extension of road arrangements from Tirupur 230 KV SS fencing to the end of Tirupur 110/11 KV Sub Station yard in Kumar Nagar EB Campus
2025_EB_591517_1
WOT-CIVIL-04-2025-2026
Open Tender
Civil Works
60 days
TIRUPPUR
PLEASE REFER TENDER SPECIFICATION
2 documents required · 2 mandatory
₹0
₹9,000
Yes
16 Dec 2025
11 Aug 2025
26 Aug 2025
11 Aug 2025
25 Aug 2025
11 Aug 2025
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders.
PCC 1:3:6, using 20mm HBG metal foundation including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:2:4 using 12-20mm graded hard machine broken granite stone, including cost of all materials, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.
Brick work in CM 1:3 using II class chamber burnt bricks for partition wall, including cost of all materials, all labour charges, lead, lift, etc. complete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in position of the steel reinforcement all materials, lead and lift etc., complete.
Providing expansion joint for road concrete at 5 Meter intervals in both direction using Bitumen felt 15mm thick pad to full width including all materials, lead, lift, labour, T&Ps etc., complete.
Plastering with cm 1:5, 12mm thick for surfaces below ground level including cost of cement, all materials, curing, labour, lead and lift etc., complete.
White washing two coats with white cement and robin blue pigment over a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc., including cost of all materials, lead, lift, etc., complete.
Collection, supplying, stacking and spreading of red gravel with compacted by power roller including cost of all materials lead lift labour etc. complete as per the direction of site engineer.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid