Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-Finance CITY PALACE ROAD PURABTOALA KASBA TEHSIL AND DISTRICT BALRAMPUR UP | SHRAVASTI | UTTAR PRADESH | 271201 | L1 | Accepted-Finance L1 | |
| 2 | L3₹14.7 L+₹55,380.82 (3.91%)Accepted-Finance GHASYARI PURA BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L3 | Accepted-Finance L3 | |
| 3 | L2₹14.3 L+₹13,825.06 (0.98%)Rejected-Finance MOB BAJDAARIPURA DISTRICT BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L2 | Rejected-Finance L2 | |
| 4 | L4₹16.9 L+₹2.7 L (19.0%)Rejected-Finance 12 NURUDDIN CHAK DARGAH SHAREEF BAHRAICH BAHRAICH BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Bid technically not fit |
| Sl No | Description | Qty | Unit | M/s R.K.Constructions L4 | Mohammad Abdulla L2 | M/S GANGA RAM CONTRACTOR L3 | Ram Charan Verma L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | E/w in digging foundation in all type of soil including all lead, lift, royalty, back filling and disposal of surplus earth for proper completion of work. | 1,909.28 | M3 | 105 ₹2,00,474.4 | 65 ₹1,24,103.2 Lowest | 76 ₹1,45,105.28 | 70 ₹1,33,649.6 |
| 2.00 | Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 19.32 | M3 | 10,559.8 ₹2,04,015.34 | 10,500 ₹2,02,860 | 8,500 ₹1,64,220 Lowest | 9,200 ₹1,77,744 |
| 3.00 | Laying cement concrete in 1:2:4 with 10 to 20 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 1.44 | M3 | 11,405 ₹16,423.2 | 11,406.4 ₹16,425.22 | 8,800 ₹12,672 Lowest | 11,009 ₹15,852.96 |
| 4.00 | Centering and shuttering for C.C. work including all taxes cost of all material, labour, T&P etc. | 68.28 | M3 | 400 ₹27,312 | 250 ₹17,070 Lowest | 340 ₹23,215.2 | 380 ₹25,946.4 |
| 5.00 | Laying RCC in 1:1.5:3 with 10 to 20 mm size crushed Kabrai stone ballast and Hamirpur coarse sand having FM not less than 2.00 including all taxes, cost of all material, labour & T&P etc. With manual compaction required for proper completion of work. | 42.38 | M3 | 11,872 ₹5,03,135.36 | 10,500 ₹4,44,990 | 9,000 ₹3,81,420 Lowest | 11,270 ₹4,77,622.6 |
| 6.00 | Centering & shuttering for R.C.C. work including cost of all material , labour and T&P etc. required for proper completion of work | 301.93 | M2 | 400 ₹1,20,772 | 250 ₹75,482.5 Lowest | 345 ₹1,04,165.85 | 380 ₹1,14,733.4 |
| 7.00 | Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes, binding wire, Steel, Labour and T&P etc. required for proper completion of work . Note- Reinforcement steel bars should be used only Steel Authority of India Limited ( SAIL)/ TATA TMT bars. | 3.6 | MT | 88,660 ₹3,19,530.64 | 75,000 ₹2,70,300 Lowest | 88,662 ₹3,19,537.85 | 82,100 ₹2,95,888.4 |
| 8.00 | Dewatering Hiring charges of 5 H.P. diesel pump/Gen set includingoperator and P.O.L for running hours as per SOR Chap.-I/1-B/2(j) | 1,730.72 | Kwh | 35 ₹60,575.2 | 25 ₹43,268 | 25 ₹43,268 | 20 ₹34,614.4 Lowest |
| 9.00 | Supply laying and fixing 150 MM dia Hume pipe of Approved make including cost of all labour, material, T&P etc. complete | 70 | RM. | 922 ₹64,540 | 900 ₹63,000 | 800 ₹56,000 Lowest | 1,280 ₹89,600 |
| 10.00 | E/W in embankment for making bundha in all type of soil including all leads, lifts with proper dressing & manual compaction for proper completion of work including all taxes but excluding G.S.T. | 1,648.35 | M3 | 55 ₹90,659.25 | 55 ₹90,659.25 | 80 ₹1,31,868 | 20 ₹32,967 Lowest |
Tender Value
₹19.2 L
EMD Value
₹38,320
Closing Date
19 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer Saryu Nahar Khand-3 Bahraich
Construction Of Kulaba at( Km.0.360 LB, Km.0.860 LB, Km.1.410 LB, Km.1.620 LB, Km.0.360 RB, Km.1.010 RB , Km.1.410 RB , Km.1.620 RB )Tendua Sonpur Minor
2026_UPIDC_1171098_8
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
Bhinga Shravasti
Plz refer Tender Documents
3 documents required · 3 mandatory
₹854
₹38,320
Yes
17 Oct 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in digging foundation in all type of soil including all lead, lift, royalty, back filling and disposal of surplus earth for proper completion of work. | 1,909.28 | M3 | - | - |
| 2 | Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 19.32 | M3 | - | - |
| 3 | Laying cement concrete in 1:2:4 with 10 to 20 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 1.44 | M3 | - | - |
| 4 | Centering and shuttering for C.C. work including all taxes cost of all material, labour, T&P etc. | 68.28 | M3 | - | - |
| 5 | Laying RCC in 1:1.5:3 with 10 to 20 mm size crushed Kabrai stone ballast and Hamirpur coarse sand having FM not less than 2.00 including all taxes, cost of all material, labour & T&P etc. With manual compaction required for proper completion of work. | 42.38 | M3 | - | - |
| 6 | Centering & shuttering for R.C.C. work including cost of all material , labour and T&P etc. required for proper completion of work | 301.93 | M2 | - | - |
| 7 | Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes, binding wire, Steel, Labour and T&P etc. required for proper completion of work . Note- Reinforcement steel bars should be used only Steel Authority of India Limited ( SAIL)/ TATA TMT bars. | - | MT | - | - |
| 8 | Dewatering Hiring charges of 5 H.P. diesel pump/Gen set includingoperator and P.O.L for running hours as per SOR Chap.-I/1-B/2(j) | 1,730.72 | Kwh | - | - |
| 9 | Supply laying and fixing 150 MM dia Hume pipe of Approved make including cost of all labour, material, T&P etc. complete | 70 | RM. | - | - |
| 10 | E/W in embankment for making bundha in all type of soil including all leads, lifts with proper dressing & manual compaction for proper completion of work including all taxes but excluding G.S.T. | 1,648.35 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
4_Bid.pdf
Tender Documents • 1.82 MB
BOQ_2211113.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .