| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹239.1 CrAccepted-AOC | ₹239.1 Cr Quoted ₹253.8 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹261.8 CrRejected-Finance | ₹261.8 Cr | 2 | Rejected-Finance due to higher rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected as per Prahari/Committee |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected as per Prahari/Committee |
Tender Value
₹290 Cr
EMD Value
₹2.9 Cr
Closing Date
4 Oct 2024, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Widenning and Strenthning in 04 Lane of Gorakhpur Pipraich Road (MDR) in District Gorakhpur in FY 2023-24 (including 05 year maintenance) (LOT No-2/2)
2024_CEGKP_953683_2
5480/135C-Gkp Circle/2024 Dated 21-08-2024
Open Tender
Civil Works
540 days
Gorakhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹2.9 Cr
19 Apr 2025
7 Sept 2024
4 Oct 2024
7 Sept 2024
4 Oct 2024
7 Sept 2024
Amount
Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . as per Morth Specification 201 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Removal (including stacking and proper handling over to concerned Authority) of stumps and roots of trees having girth 300mm and backfilling the pit created to required compaction complete as per technical specifications clause 201 and 305, or as directed by the engineer incharge, for girth size above 300mm as per Morth Specification 201B Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. as per Morth Specification 202 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. as per Morth Specification 301 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Removal of unserviceable soil including excavation, loading and disposal upto 10 km lead but excluding replacement by suitable soil which shall be paid seperatelyas per clause 305 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead up to 10 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor density requirement of table No. 300-2 MORTH specification no. 305 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRTH Sp. 406 (4.14) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (Stabilization with emulsion3.5% and cement 1% ) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRTH Sp. 406 (4.14) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 519. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRTH specification clause No. 503(i) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507(B) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade on M-15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) . Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
P/L of Interlocking concrete block pavement Zig - Zag having thickness 80 mm as per drawing and technical specification clause 1504 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing plantation on center of median of road i/c all material , labour etc complete as per direction of E/I (Khajoor Plant Spacing @ 5m c/c) as per MoRTH Sp. 307 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Supply & fixing of 9 mtr C.I Octagonal Victorian Pole with C.I base antique copper outer colour of approved make (top dia 70mm, Bottom dia I55 mm and base plate I2mm thik) having 3mm thikess with Double arm bracket (1 Mtr length each) on RCC foundation including the cost of foundation, foundation bolts excavation & back filling and Required T&P complete in all respect weight 180 kg.
Supply and fixing of LED street light fitting with mandatory driver set having die cast aluminium body and lenses suitable for 140 Watt to 150 Watt and confirming to IP66 protection having company LOGO engraved complete in all respect including labour CAT-AAA
S/F of 2 no. SPMCB for controlling ofstreet light, including cost of din mounting rail, connecting streep, earth link etc.complete in all respect.
Making connection of each street light fitting by S/L 2.5 sqmm 3 core flexible copper cable from pole busbar box to street light fitting.as per P.S.No.289{p)
Supply and burring of Safe Earthing Electrode T-19 (Hot Dip Galvanized), Length up to 2000mm, outer pipe 50mm, inner pipe 25, terminal Dia 12 mm, outer GI pipe of 16 swg and inner GI pipe of 12 swg with Hot Dip Galvanization up to JOO micron filled with crystalline conductive mixture (CCM) having anti corrosive & conductive property with 50 kgs activated soil (BFC) capable of reducing the soil resistivity with good mixture of retaining capacity along with 30cm square C.I. frame with hinged cover & masonry husing (from electrode terminal to switch board, cost of 25 x 3 GI. strip will be extra) Make: As approved in U.P. P. W.D., & C.P.R.I. Certified.·
S/L of 25mm x 3mm GI strip
Numbering of pole by letter writing (number, named, agency, UPPWD) with cost ofpalnt & needed T & P
Supply and laying of aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade at a depth of 750 mm below ground level over a cushion of75 mm. thick sandall around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc. A-25 Sqmm x 3'/core cable
B-150 Sqmm x 3%core cable
C-300 Sqmm x 3½core cable
S/F of Brass Nikil plated compression gland as under B-25 Sqmm x 3'/core cable
D-150 Sqmm x 3'/core cable
E-300 Sqmm x 3½core cable
S/F of plain or pin type copper tin plated cable socket (Lugs) A-16 Sqmm
B-25 Sqmm
C-70Sqmm
D-150 Sqmm
E-300 Sqmm
S/F of Main feeder pillar with over voltage and under voltage relay with auto resetting manufactured using 1.9/1.6 mm thick CRCA Sheet steel with powder coated paint double door with canopy base channe lwith cable gland entry from bottom for cable using suitable allurniniwn busbar with provision of incoming & outgoing MCCB of L&T /Schneider/GE/ABB make installation of feeder pillar ofsuitable c.c foundation (AII MCCB to be Rotatory handle type) INCOMING-200A 4Pole MCCB-1 NO. OUTGOING-63A 4Pole MCCB- 3 Nos
S/F of Sub feeder pillar with over voltage and under voltage relaywith auto resetting manufactured using 1.9/1.6 mm thick CRCA Sheet steel with powdet coated paint double door with canopy base channel with cable gland entry from bottom for cable using suitable alluminium busbar with provision of incoming & outgoing MCCB ofL&T /Schneider/MDS/GE/ABB make installation of feeder pillar ofsuitable c.c foundation (All MCCB to be Rotatory handle type) INCOMING-100A 4Pole MCCB-1 NO OUT GOING-63A 4Pole MCCB-1 No, 32A 4Pole MCCB-2NO
S/Laying of 4 dia GI Pipe B-Class
Charges for Cutting of footpath including rent of T&P needed and disposal ofrubbish material for away from site and dumping area (Size 1.5mX 1mX0.50m)
Charges for repairing of footpath with cost of material cement sand & rent of T&P and painting in original surface
Labour charges for cutting of road S0cm below ground surface and laying ofMS pipe with cushion ofgrit and cement mortar
Labour charges for repairing of road by mixing grit & tarcoal and filling the propper patch with cost oftarcoal & grit
Labour charges for Laying of Cable by Horizenta! Drilling Machine as required at site
Painting of kerbs with two coats synthetic enamel paint in all shades on new concrete surface after filling earth in median as per MORT&H specificaiton No 14.16.(800) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(lead 10 km) as per MoRTH Sp. 304B(i) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Plain cement concrete M-15 in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per MoRTH Sp. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Furnishing and Placing Reinforced/ Prestressed cement concrete M-20 grade in foundation as per drawing and Technical Specification. As per MoRTH Sp. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per MoRTH Sp. 1600 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
M-25 Reinforced Cement Concrete in box culvert complete as per Drawing and Technical Specification As per MoRTH Sp. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
M-30 Reinforced Cement Concrete in Divider complete as per Drawing and Technical Specification As per MoRTH Sp. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
M.S or iorn work in angle iorn for joint in Box Culvert including Supply of matrial labour T&P etc Required for proper compltion of work size 100x100x8 mm si no 503. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
PCC 1:3:6 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.As per MoRTH Sp. 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Wrought iron and mild steel welded work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately as Mort&H 11.18 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Add @ 5 per cent of cost of material for painting one shop coat with red oxide primer and three coats of synthetic enamel paint and consumables to safeguard against weathering and corrosion for Steel railing Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and Laying Cutting Edge of Mild Steel for Well Foundation complete as per Drawing and Technical Specification and including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and excluding GST and cess (MoRTH Specification No. 1200 &1900 Data Book Sl. 12.10 )
Reinforced Cement Concrete, in Well curb of M30 Grade complete as per Drawing and Technical Specification. including cost of grit, coarse sand from butwal quarry, all labour, T&P etc reqd. for proper completion of the work..excluding GST and Cess (MORTH Specification 1200, 1500 & 1700 Data Book Sl. No. 12.11A (iii))
Reinforced Cement Concrete, in Well steining of M30 Grade complete as per Drawing and Technical Specification. including cost grit and coarse sand from Dala quarry including all labour, T&P etc reqd. for proper completion of the work, and also Excluding GST and cess (12.11B (vii))
Sinking of 5.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 17.20 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work including all taxes but excluding GST and and cess (MORTH Specification Section 1200, Data Book Sl. No.12.12A MORTH Section 1200) From 0.00m to 3.00m
From 3.00m to 10.00m
From 10m to26.35m
Plain Cement Concrete, in Bottom Plug OPC Grade M25 complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess as per Drawing and Technical Specification.(12.11C (ii))
Sand Filling in Wells complete including cost Sand from approved quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess as per Drawing and Technical Specifications. (MORTH SPECIFICATION 1207, Sl. No. 12.21
Plain Cement Concrete, in Intermediate Plug OPC Grade M20 complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification. (12.11D (i))
Plain Cement Concrete, in Top Plug OPC Grade M20 complete including cost of grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess as per Drawing and Technical Specification.(12.11E (ii) )
Reinforced cement concrete (with OPC 43 grade) in Grade M30 in abutment well caps including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding G.S.T. and cess complete as per drawing and Technical Specifications (12.10F(iii))
Reinforced cement concrete (with OPC 43 grade) in Abutment of Grade M30 including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess complete as per drawing and Technical Specifications (13.5 (g) MORTH SPEC 1500,1700,2200)
Supplying, fitting and placing of uncoated HYSD Bar reinforcement in foundationcompleter as per drawing and technical specfications (Sr. No. 12.40 MoRTH Specifications 1600)
Supplying, fitting and placing HYSD bar (TATA/SAIL Make) reinforcement in substructure including cost of Steel, all labour etc. reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess complete as per drawing and Technical Specifications (13.6 MORTH Specification 1600 & 2200)
Supplying, fitting and placing HYSD bar (TATA/SAIL Make) reinforcement in Back Wall Bracket, Hanging R/W bearing pedesatal, Seisimic Arrester and Mesh Reinforcement below bearing and Jacks including cost of Steel, all labour etc. reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing and Technical Specifications (Data Book Sl. No. 13.6 MoRTH SPEC No. 1600 & 2200)
Reinforced Cement Concrete (with OPC 43 grade) in back wall /wing wall of M30 Grade including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per Drawing and Technical Specification.( Data Book Sl. No. 13.50G MoRTH Spec 1500,1700,2200)
Backfilling (Granular Material) behind abutment, wing wall and return wall complete as per drawing and specification including supply of all materials labors tools and plants and all taxes bu excluding GST and cess Data Book Sl. No. 13.9 MoRTH Specs:710.1.4 of IRC:78 & 2200)
Supplying, Fitting and Fixing in position, true to line and level elastomeric bearing of size 500x400x96 mm conforming to IRC:83 (Part II) Section IX and Clause 2005, of MoRTH specifications complete including all acessories as per drawing and technical specifications. (MoRTH Specs 2000& 2200, Data Book Sl. No. 13.16
SUPER-STRUCTURE Supplying, fitting and placing HYSD bar (TATA/SAIL Make) reinforcement in R.C.C. Slab, Main Girder and Cross Girder Etc, Pier Seismic Arrester including cost of Steel, all labour etc. reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess complete as per drawing and Technical Specifications (14.2)
Furnishing and Placing Reinforced cement concrete (with OPC 43 grade) in slab /Kerb of RCC Grade M35 including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing No. B.D./1.78 August 1978 by MOST and Technical Specification (DATA BOOK SL. NO. 14.1D MORTH Refrence No. 1500, 1600 & 1700)
Providing and laying Reinforced Cement concrete (with OPC 43 grade) in wearing coat of RCC Grade M-30 including reinforcement cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess complete as per drawing and Technical Specifications (DATA BOOK Sl. No.14.4 MORTH SPECS: 2702)
Providing and laying Reinforced Cement concrete (with OPC 43 grade) of RCC Grade M-30 in Crass Barrier including reinforcement cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing and Technical Specifications (DATA BOOK Sl. No.14.1C(i)q MORTH SPECS: 2702)
P.C.C. Grade M15 levelling course below approach slab slab as per drawing and technical specifications. (Data Book Sl. No. 14.10 MORTH Specs 2700)
Supplying, Fitting and Placing un-coated HYSD bar (TATA/SAIL Make) Reinforcement in approach slab including cost Steel etc reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess complete as per Drawing and Technical Specifications. (14.2)
Providing and laying Reinforced Cement concrete (with OPC 43 grade) RCC Grade M-30 in approach slab including reinforcement cost grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding GST and cess complete as per drawing and Technical Specifications (DATA BOOK Sl. No.14.11 MORTH SPECS: 1500,1600,1700,2704) excluding steel
Drainage Spouts complete and also including all type of taxes but excluding cess as per drawing and Technical specification(Data Book Sl. No. 14.9 MORTH SPEC No. 2705)
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer /supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and also including all type of taxes but excluding cess complete (14.22)
Transverse Bar (Repeated Bars) for Speed Calming (Thermo Plastic Paint) Providing and Applying Hot applied thermo plastic compound 5.0 mm thick including reflectorising glass beads @ 500 gm /sqm area. Thickness of 15 mm is exclusive of surface applied glass beads as per IRC 35. The finish surface tu be leveled uniform and free streaks and holes. Composition of thermo plastic material shall be as per table 800-3 of clause 803 of MORTH including cost of all material labour T&P etc required for proper completion of work as per direction of E/I. (Including Labourcess but Excluding GST).
Center Line Edge Line (Thermo Plastic Paint) Providing and Applying Hot applied thermo plastic compound 2.5 mm thick including reflectorising glass beads @ 250 gm /sqm area. Thickness of 2.5 mm is excusive of surface applied glass beads as per IRC 35. The finish surface tu be leveled uniform and free streaks and holes. Composition of thermo plastic material shall be as per table 800-3 of clause 803 of MORTH including cost of all material labour T&P etc required for proper completion of work as per direction of E/I. (Including Labourcess but Excluding GST).
5th kilometre stone (precast) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Ordinary kilometer stone (precast) as per direction of E/I. (Including Labourcess but Excluding GST).
Hectometer stone (precast) as per direction of E/I. (Including Labourcess but Excluding GST).
5 Year Maintenance Charge Complete in all respect as per GO No. 17/2024/Sa-23-1-2024-23-1099/113/2023 Dated 16.01.2024 and Circular of EnC 3689C0PRMC/Mool-23-24 Dated 17.02.2024 & direction of E/I. (Including Labourcess but Excluding GST). 1st Year Mainntenance Cost @ 0 % & 2nd Year @ 0.25%
For 3rd Year @ 0.50%
For 4th Year @ 0.75%
For 5th Year @ 1%
ganga sagar singh
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf