Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
12 Jun 2026, 2:00 pm7d left
DyCE_WS-II
5 S.N Banerjee Road, Kol-13
COMBATING WITH DISASTER DUE TO STORM AND HEAVY RAIN FOR THE PROTECTION OF OUR PLANT AT SENPALLY BPS, SIRITY BPS AND SHAKUNTALA PARK BPS
2026_KMC_1025959_1
WS/BPS/2026-27/01
Open Tender
Miscellaneous Works
90 days
Kalighat BPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
3 Jun 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
12 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps
including all leads, lifts and making all arrangements of disposal.
where continuous flow of water from a source other than natural or
ground water is encountered in case of emergency maintenance
works related to leakage. breakage and making wet connections.
[Note ;- In case of any other situation demanding such emergency
dewatering. use of this item is to be approved by the Superintending
Engineer/Tender Accepting Authority. This item shall be executed on
the specific direction duly supported by proper clarification of the
E.I.C. who will be satisfied in absolute discretion that such work has
not been necessitated due to any natural source of water or any fault
of the Contractor] | 3,600 | HPH | 33 | ₹1,18,800 |
| 2 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of
10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be
applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 20 | EACH | 245 | ₹4,900 |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be
applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 10 | EACH | 326 | ₹3,260 |
| 4 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS
AND OTHER FLOOD PROTECTIVE MEASURES 2.26.Labour
charges for dumping and placing in position properly filled in Nylon
crates with filled in gunny / poly cement bags (minimum 25 nos.
having capacity 50 kg) with local earth or sand, sewing and tying the
crate with nylon wire within a lead of 150 m. and all lifts in river slope
or bed by cutting trenches upto 50 cms depth, if necessary, or by boat
including cost of hire charges of boat, boatmen and other necessary
equipments and also including cost of bags, carriage and charge of
filling bags with earth / sand but excluding cost of nylon crate as per
direction of the Engineer ... in ... Charge. NB:- Volume of each earth/
sand filled bags should not be less than 0.028 m3. Size of Nylon crate
is 1metre X 1metre X 1metre. (a) Where boats are not necessary. | 12 | EACH | 418 | ₹5,016 |
| 5 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF
MACHINERIES 8.28Hire charges of lighting generator of capacity
5KVA including fuel, mobil, operator, carriage etc. including all
complete for water supply works. For beyond 8hrs. of working | 576 | HOUR | 206 | ₹1,18,656 |
| 6 | Sub Total | - | - | - | - |
| 7 | GST 18% | - | NOS | - | - |
| 8 | CESS 1% | - | NOS | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Techbid.pdf
Tender Documents • 0.47 MB
BOQ_2520773.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid