Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-Finance | 1 | Accepted-Finance found eligible | |
| 2 | 2₹1.2 L+₹4,250 (3.53%)Accepted-Finance | 2 | Accepted-Finance found eligible | |
| 3 | 3₹1.3 L+₹6,150 (5.11%)Accepted-Finance 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
Closing Date
17 Oct 2022, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowsh
Office of the Executive Engineer MID Akhnoor/Nowsh
Repair to electro-mechanical machinery at LIS Kotgarhi H/L , LIS Badyalachak.
2022_IFC_190780_1
MID/AN/92
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowsh
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
9 Nov 2022
1 Oct 2022
18 Oct 2022
1 Oct 2022
17 Oct 2022
4 Oct 2022
3 Oct 2022
Repairs to 3.5 cusec , 36 metre head HC pump unit no. 02 at LIS Badyalachak. The job involves decoupling of pump from motor . Further dismantling the pump & shifting of the pump shaft assembly by manual / mechanical means to workshop. Complete dismantling of the pump assembly. Rebuilding of impeller by using good quality electrodes. Turning/machining of rebuild impeller on lathe machine for proper size . Providing / fitting of one no. bush and two no. bearings (6309-2 nos.) as per sample to the pump.. Assembling of the pump parts. Carriage / transportation of the pump assembly back from workshop to the site of installation at LIS. Fitment of pump along with replacement of rusted / damaged studs, gaskets, alignment setting at its position, p/f of gland packing, greasing work etc. Aligning & coupling the pump & motor. Complete testing of the pumping unit on full load. Job includes cost of all material, transportation charges, head load and labour charges for skilled/semiskilled labour, hire charges for tools & tackles. Complete Job
Repairs to 75HP 3 phase induction motor at LIS Badyalachak.The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport . Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process.. Assembling of the motor . Shifting the motor back to LIS . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. Complete Job
Repairs to 200 mm dia foot valve assembly of pumping unit no.2 installed at LIS Badyalachak. The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely, carrying out necessary repair works on the valve surfaces and flanged joints by welding using good quality electrodes. Dismantling of damaged / worn-out foot valve mechanism with flap & rings etc. Complete repair to the damaged flap plate and strainer by way welding. Providing / fitting of new rubber washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction lines with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles. Complete Job
Repair of 3.5 cusec discharge 36mtr head HC pump unit no. 01 installed at LIS Kotgarhi H/L.The job involves dismantling of the Pump by using skilled technicians .Taking out impeller shaft assembly and shifting the same to workshop by using manual labour and mechanical transport . Dismantling of the impeller shaft assembly and separating shaft, impeller and bushes. Rebuilding of impeller by using good quality electrodes. Turning/machining of rebuild impeller on lathe machine for proper size . providing and fabrication of new shaft as per sample of old one .Turning/machining of new shaft on lathe machine for proper size . P/F of 2-No bearings(6309) & 1-No bush as per sample. Fabrication/Providing and fitting of glands ( 2 nos.) as per sample. Re-assembling of impeller shaft assembly & shifting back to L.I.S. Greasing of all the parts. Fitment of impeller/ shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Job also includes providing / fitting of gland packing , greasing work etc. Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles etc. Complete Job
Repairs to 100 HP Starter of pumping unit of pumping unit no. 1 installed at LIS Kotgarhi H/L. The job involves disconnecting the starter and then shifting the starter to the workshop through mechanical transport . The job involves complete replacement of worn out G.M Nuts and washers, bakelite strips, fingers, contacts moving and fixed as per sample. Replacement of tripping coil of required capacity, complete kit. Complete drainage of T.oil, Providing/Filling of fresh T.oil (08 Ltrs.).. Replacement of worn-out thimbles of cables . Shifting the starter to the LIS .Connecting power supply and testing at load. Complete Job includes cost of material, tools and tackles, labour charges transportation charges at site of LIS, Complete Job
GEETA ENGINEERING MECH WORKS
M/S K S ENGG WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .