| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹37.7 LAccepted-AOC LIG 166 MAHARANA PRATAP NAGAR KORBA CG | KORBA | CHHATTISGARH | 495452 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹32.3 L+₹31,755 (0.99%)Rejected-Finance 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹40.2 L+₹8.2 L (25.8%)Rejected-Finance | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status | |
| 4 | L-4₹53.8 L+₹21.9 L (68.6%)Rejected-Finance R P NAGAR KORBA C G DIST KORBA C G PIN 495678 | 495678 | L-4 | Rejected-Finance Rejected as the bidder attains L-4 status |
| Sl No | Description | Qty | Unit | BHAKULAL SAHU L4 | B.B. RAI AND CONSTRUCTION L1 | SANTOSH AGRAWAL L2 | HEMS AND JMATC ASSOCIATE L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Hiring of Tyre mounted Hydraulic excavator of one cum bucket capacity having back-hoe & front loader bucket i.e. JCB 3DX or equivalent alongwith operators, fuel, POL, etc. for Cleaning of spillage coal and clearing of Grizzley during unloading of tippers at hoppers of Truck Receiving Station (TRS-1 and 2) of New CHP and other places by mechanical means for 24 hrs in all three shifts. Hydraulic excavator is to be made available continously at the working place in all three shifts with three nos. operators, fuel, POL in ready condition for trouble free service. However the anticipated working hours will be 12 hours per day i.e. about 365 hours per month (Max. working hours for 365 days = 12 x 365 = 4380 hours) | 365 | Day | 14,750 ₹53,83,750 | 8,751 ₹31,94,115 Lowest | 8,838 ₹32,25,870 | 11,011 ₹40,19,015 |
| 2.00Note: (i). The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 03 nos. (ii). All manpower must be VTC trained and must be provided with safety equipment such as safety shoes, fluorescent jackets, helmets, safety belts etc. Providing of these safety equipments will be under the scope of contractor. (iii). The Rate is inclusive of diesel cost, POL, operator wages, Contractor's Profit & other overhead expenses etc. excluding GST. (iv). Hydraulic excavator can also be deployed at any other locations as per instructions of Engineer In-charge. (v). For Other terms & conditions including penalty etc for non-availability of Hydraulic Excavator please refer to page no. (28-29) of NIT or Annexure-A in the uploaded tender documents. | |||||||
| 3.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - |
Tender Value
₹65.7 L
EMD Value
₹82,100
Closing Date
4 Sept 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Cleaning of spillage coal and clearing of Grizzley during unloading of tippers at hoppers of Truck Receiving Station (TRS-1 and 2) of New CHP and other places by mechanical means for a period of 365 days at Dipka Expansion Project.
2025_SECL_341557_1
SECL/GM/DA/SO(EnM)/ e-tender/25-26/72 dtd-14/08/25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
5 documents required · 5 mandatory
₹82,100
6 Oct 2025
18 Aug 2025
6 Sept 2025
18 Aug 2025
4 Sept 2025
19 Aug 2025
18 Aug 2025 - 28 Aug 2025
Amount
Hiring of Tyre mounted Hydraulic excavator of one cum bucket capacity having back-hoe & front loader bucket i.e. JCB 3DX or equivalent alongwith operators, fuel, POL, etc. for Cleaning of spillage coal and clearing of Grizzley during unloading of tippers at hoppers of Truck Receiving Station (TRS-1 and 2) of New CHP and other places by mechanical means for 24 hrs in all three shifts. Hydraulic excavator is to be made available continously at the working place in all three shifts with three nos. operators, fuel, POL in ready condition for trouble free service. However the anticipated working hours will be 12 hours per day i.e. about 365 hours per month (Max. working hours for 365 days = 12 x 365 = 4380 hours)
Note: (i). The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 03 nos. (ii). All manpower must be VTC trained and must be provided with safety equipment such as safety shoes, fluorescent jackets, helmets, safety belts etc. Providing of these safety equipments will be under the scope of contractor. (iii). The Rate is inclusive of diesel cost, POL, operator wages, Contractor's Profit & other overhead expenses etc. excluding GST. (iv). Hydraulic excavator can also be deployed at any other locations as per instructions of Engineer In-charge. (v). For Other terms & conditions including penalty etc for non-availability of Hydraulic Excavator please refer to page no. (28-29) of NIT or Annexure-A in the uploaded tender documents.
Total impact of GST for the purpose of CTC
SANTOSH AGRAWAL (BID ID -1181033)
HEMS AND JMATC ASSOCIATE (BID ID -1181059)
BHAKULAL SAHU (BID ID -1177085)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .