Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L | L1 | Accepted-AOC Winner in the transparent lottery system for award of contract. |
| 2 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 3 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 4 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 5 | L1₹8.5 LRejected-Finance ANGUL ODISHA | KENDRAPARA | ODISHA | 754223 | ₹8.5 L | L1 | Rejected-Finance Not won in the transparent lottery system |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
23 Jul 2026, 5:00 pmClosed
S.E, Angul Irr. Divn. Angul
O.O the S.E, Angul Irr. Divn. Angul, At/P.O- Hakimpada, Dist-Angul
Improvement to Sapua Link channel service road from RD 5.33Km to 6.00Km of Sapua Badjore Irrigation Project Working RD 5.445km to 5.780km
2026_CEBBS_135328_8
SE-AID-4/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Angul
3 documents required · 3 mandatory
₹4,000
₹8,500
Yes
10 Sept 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
23 Jul 2026
14 Jul 2026
14 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50m outside the periphery of the area with all cost of incidental charges , all labour, T&P and cess complete as per drawing, specification,direction of the Engineer-in-charge. | 3,082 | One Sqm | 2.9 | ₹8,937.8 |
| - | Providing granular sub-base using admixture of sand & moorum in proportion (2:3) to road surface including spreading in uniform thickness including watering and rolling with PRR including cost, conveyance, royalty, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 251.25 | One Cum | 1,580.5 | ₹3,97,100.63 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all leads and lifts, transporting to site by mechanical means within a lead of 5Kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoRT&H specification for road and Bridges works (4th Revision) including cost, conveyance,royalty, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 1,606.7 | One Cum | 274.6 | ₹4,41,199.82 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_601035.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.34 MB
8BidDocuments.pdf
Tender Documents • 4.20 MB
BOQ_601035.xls
BOQ • 0.24 MB
4Corrigendum.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .