Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -3.00% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 L+₹66,991.38 (23.4%)Admitted-Finance | +19.71% | ₹3.5 L+₹66,991.38 (23.4%) | L2 | Admitted-Finance |
| 3 | L3₹3.5 L+₹67,817.34 (23.7%)Admitted-Finance | +19.99% | ₹3.5 L+₹67,817.34 (23.7%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹5,900
Closing Date
18 Aug 2026, 6:00 pmClosed
ADPC SMSA JAISALMER
ADPC SMSA JAISALMER
CONSTRUCTION OF GIRLS TOILET (01) (ELE. UPTO CLASS VIII) AT GOVT. PRIMARY SCHOOL AALA BLOCK SAM UNDER PAB 2022-23
2026_RCSCE_587487_2
NIT 07 (CIVIL)/2026-27 JAISALMER 2660/10.08.2026
Open Tender
Civil Works
Percentage
120 days
JAISALMER
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
DPC SSA JAISALMER Pay At SBI 31172/ MDRISL JAIPUR
₹5,900
24 Aug 2026
14 Aug 2026
19 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A CIVIL WORK | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 16.74 | Cum | 146 | ₹2,444.04 |
| 1.02 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth leve 1:4:8 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size | 3.56 | Cum | 2,235 | ₹7,956.6 |
| 1.03 | Random Rubble stone masonary for foundation and plinth in Cement Sand Mortar above 30 Cm. thick wall in :Cement Mortar 1:6 (1-Cement:6-Sand). | 15.41 | Cum | 1,982 | ₹30,542.62 |
| 1.04 | P&L damp-proof course with cement concrete
grade M-150 (1:2:4) mortar prepared with (1% Solution of water-proof compound) including two coats of hot blown bitumen (2Kg, Per Sqm.) Complete as per specification 100 mm thick
M-20 | 11.71 | sqm | 496 | ₹5,808.16 |
| 1.05 | Filling - Supply & Stacking good earth at site complete including loading unloading and transportation etc. | 7.31 | Cum | 125 | ₹913.75 |
| 1.06 | Random rubble dry stone Kharanja under floor. | 3.22 | Cum | 414 | ₹1,333.08 |
| 1.07 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth leve 1:3:6 (1Cement :3 Course Sand :6 Graded stone aggregate 20 mm nominal size | 2.14 | Cum | 2,627 | ₹5,621.78 |
| 1.08 | Brick work with clayey flyash brick (Non modular) conforming to IS: 13757 :1993) of class designation 75 in superstructure above plinth level upto floor V level in. Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 12.08 | Cum | 3,120 | ₹37,689.6 |
| 1.09 | Half brick masonry in foundation & plinth using bricks of designation 75 with nominal hoop rainforsed (2 Nos. 6mm MS bar) at every fourth course in for hoop rainforcement 1Sqm. 6mm MS bar 2x2x1.00 = 4.00 Cement mortar 1:4 (1-Cement:4-coarse sand). Add extra over item No. 5.8 for half brick masonary in superstructure up to third story. | 16.95 | sqm | 476.6 | ₹8,078.37 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.94 MB
Tender_document.pdf
Tender Documents • 2.66 MB
BOQ_1043372.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .