Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically suitable |
| 2 | Accepted-Technical GUWAHATI KAMRUP ASSAM 781028 INDIA | KAMRUP METRO | ASSAM | 781028 | Accepted-Technical Technically suitable |
| 3 | Accepted-Technical | Accepted-Technical Technically suitable |
| 4 | Accepted-Technical | Accepted-Technical Technically suitable |
| 5 | Accepted-Technical | Accepted-Technical Technically suitable |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
28 May 2026, 3:00 pmClosed
S P Changmai
BVFCL NAMRUP ASSAM
Construction of Electrical and Mechanical Workshop and Lime Godown within BVFCL Factory Area
2026_BVFCL_278113_1
CE/2026/SPC/09
Open Tender
Civil Works
Item Rate
90 days
BVFCL NAMRUP ASSAM
mentioned in NIT
2 documents required · 2 mandatory
₹500
Yes
Brahmaputra Valley Fertilizer Corporation Limited
₹1.9 L
16 Jun 2026
20 May 2026
29 May 2026
20 May 2026
28 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.50M in width as well as 10 Sqm on plan) including disposal of excavated earth lead up to 50M and lift upto 1.50m and disposed earth to be levelled and neatly dressed : (a) All kind of soil | 115 | CUM | 100 | ₹11,500 |
| 1.02 | Dismantling RCC works including stacking of reclaimed MS reinforcement & disposal of unserviceable materials up to a distance of 50 M lead outside the periphery of area cleared | 5 | CUM | 100 | ₹500 |
| 1.03 | Dismantling AC Plain or corrugated / transparent sheets in roofing including ridges, hips, valleys and gutters etc. and stacking the material within 50 m lead | 100 | SQM | 10 | ₹1,000 |
| 1.04 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,cutting rivets, welding etc. dismembering and stacking within 50 M lead | 100 | Kg. | 10 | ₹1,000 |
| 1.05 | Dismantling CC works including disposal of unserviceable materials up to a distance of 50 M lead outside the periphery of area cleared | 10 | CUM | 10 | ₹100 |
| 1.06 | Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.50m | 160 | CUM | 10 | ₹1,600 |
| 1.07 | Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m :All kinds of soil | 50 | CUM | 10 | ₹500 |
| 1.08 | Providing & laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level RCC 1:2:4 (1 cement : 2 river sand : 4 stone aggregate 20 mm nominal size) | 130 | CUM | 10 | ₹1,300 |
| 1.09 | Providing & laying cement concrete 1:2:4 (1 cement : 2 river sand : 4 stone aggregate 20 mm nominal size) up to plinth level excluding the cost of centering and shuttering. | 5 | CUM | 10 | ₹50 |
| 1.1 | Centering and shuttering including strutting, propping etc and removal of form work for: (a) Foundation, footings, bases of columns etc. for mass concrete | 50 | SQM | 10 | ₹500 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
BOQ_324751.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .