| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -0.15% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 L+₹36.94 (0.03%)Admitted-Finance | -0.12% | ₹1.2 L+₹36.94 (0.03%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 L+₹61.57 (0.05%)Admitted-Finance | -0.10% | ₹1.2 L+₹61.57 (0.05%) | L3 | Admitted-Finance |
Tender Value
₹1.2 L
EMD Value
₹2,087
Closing Date
30 Jun 2026, 5:00 pmClosed
Executive officer
Nagar Panchayat Bachhrawan Raebareli
Under Ward No. 08, construction work of placing RCC slip and parapet wall on drain near railway crossing in Lalganj and Bachhrawan link road and RCC drain on Shivgarh link road
2026_DOLBU_1158537_8
1831/npb/date-01-06-2026
Open Tender
Civil Works
Percentage
30 days
Nagar Panchayat Bachhrawan Raebareli
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive officer
₹2,087
6 Jul 2026
9 Jun 2026
1 Jul 2026
9 Jun 2026
30 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Nali and RCC Stone Nirman Work | |||||
| 1.01 | Earth work in excavation in foundation in ordinary soil all respects as per PWD S.I.No. 18-9- 20-21 SI no. 2.1.1 | 3.14 | M3 | 156 | ₹489.84 |
| 1.02 | M-150/ First class brick work in 1:4 in cement and coarse sand mortar including all respects as per pwd
specification No. 16-11-18-9-20-21 | 6.53 | M3 | 6,199 | ₹40,479.47 |
| 1.03 | 12 mm thick plaster in 14 in cement and coure sand excluding all respects as per pwd. S.I.No. (2)
13.4.1 18-9-20-21 | 12.59 | M3 | 186 | ₹2,341.74 |
| 1.04 | P/L cement concrete in 1:2:4 in cement Fine sand & 20 mm grade stone grit including all respects as per pwd S.I.No. 4.1.3 18-9-20-21 | 0.1 | M3 | 6,787 | ₹678.7 |
| 1.05 | R.C.C. work in slab in 1:2:4 in cement, coarse sand & 20 mm M grade stone grit excluding supply of reinforcement but ixching cost of centering and shuttering etc, all respects as pwd. S.I.No. 16 (2) 5.1.3 | 3.59 | M3 | 7,138 | ₹25,625.42 |
| 1.06 | Mild steel/reinforcement work in plain work including supply of all steel and wastage & over lapping & hooks all respects as per pd. S.I.No. 504 | 2.81 | QTL | 7,560 | ₹21,243.6 |
| 1.07 | 5.9.2 walls (any thickness including attached plasters buttresses plinth and string courses etc. | 35.38 | M2 | 328 | ₹11,604.64 |
| 1.08 | Disposd of malva up to 4m distance in all complete PWD SOR 18-9-20-21 (231(a) | 12.36 | M3 | 165.7 | ₹2,048.05 |
| 1.09 | Add GST 18% | 1 | GST | 18,623 | ₹18,623 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_2171383.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .