Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAdmitted-Finance | ₹17.2 L | L1 | Admitted-Finance |
| 2 | L2₹21.9 LAdmitted-Finance | ₹21.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED L2 | Ramakrishna Electrical Winding works L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of rotor poles for repairing of stator bars (If required) | 2 | Nos. | 72,000 ₹84,960 | 32,344.2 ₹38,166.16 |
| 2.00 | Cryogenic / conventional cleaning of stator windings (as required) | 1 | Job | 1,80,000 ₹2.1 L | 2,02,500 ₹2.4 L |
| 3.00 | Debrazing of joint and removal of defective top stator bars. (as per requirement) | 30 | Nos. | 15,300 ₹18,054 | 6,525 ₹7,699.50 |
| 4.00 | Debrazing of joint and removal of defective bottom stator bars. (as per requirement). | 10 | Nos. | 15,300 ₹18,054 | 6,525 ₹7,699.50 |
| 5.00 | H.V. testing the remaining stator bars for their healthiness. | 1 | Job | 3,24,000 ₹3.8 L | 1,23,750 ₹1.5 L |
| 6.00 | Removal of stator bar failed during H.V. testing of remaining bar. | 5 | Nos. | 15,300 ₹18,054 | 32,625 ₹38,497.50 |
| 7.00 | H.V. Testing of new or reinsulated available spare bars. (as per requirement) | 50 | Nos. | 4,500 ₹5,310 | 6,469.2 ₹7,633.66 |
| 8.00 | Minor insulation repairing of Top bars at its place | 39 | Nos. | 5,400 ₹6,372 | 10,800 ₹12,744 |
| 9.00 | Inserting the bottom bars in stator slot and Lacing in position and testing.( as per requirement) | 10 | Nos. | 27,000 ₹31,860 | 46,462 ₹54,825.16 |
| 10.00 | Inserting the Top bars in stator slot and Lacing in position and testing.( as per requirement) | 40 | Nos. | 27,000 ₹31,860 | 56,700 ₹66,906 |
Updated dates
Tender Value
₹80.4 L
Closing Date
13 Dec 2025, 4:00 pmClosed
ACE THC
THC SIRMOUR
Partial Repairing of stator winding of 11 KV, 105 MW BHEL make Hydro generator of Unit No. 2 at 3x105 MW, THPS-I, MPPGCL, Sirmour.
2025_MPPGC_463002_1
91-84/PNW/THC-I/W/1743
Limited
Electrical Works
50 days
SIRMOUR
NOT APPLICABLE
10 documents required · 10 mandatory
₹0
Exempted
22 Jan 2026
15 Nov 2025
15 Dec 2025
15 Nov 2025
13 Dec 2025
15 Nov 2025
Jointing the top and bottom bars & Insulating the joints and UT test of each joint. (as per requirement)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.23 MB
WORKScompressed.pdf
Tender Documents • 3.60 MB
BOQ_544482.xls
BOQ • 0.30 MB
TnCScheduleWorks.xls
Additional Documents • 0.32 MB
Download all tender documents and submit your bid