Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.2 LAccepted-AOC GF BABA BHORAI LONDHAIYA BAZAR GODDA 814165 JHARKHAND INDIA | GODDA | GODDA | JHARKHAND | 814165 | ₹4.2 L Quoted ₹3.6 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.8 LRejected-Finance | ₹3.8 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹3.9 LRejected-Finance | ₹3.9 L | L-3 | Rejected-Finance L-3 |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
12 Feb 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of 02 nos. Cement concrete well (1.80 metre dia and 9.00 metre depth) at OB Dump rehab site under Rajmahal Area.
2026_ECL_352253_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/473 Dt-02.02.2026
Open Tender
Civil Works - Others
45 days
OB Dump rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,300
24 Apr 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
12 Feb 2026
2 Feb 2026
2 Feb 2026 - 5 Feb 2026
Item Description/ Heading
By Mechanical Transport including loading,unloading and stacking:Earth Lead - 1 km
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil. 1.5 mtrs to 3.00 mtrs lift
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil. 3.00 mtrs to 4.50 mtrs lift
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil. 4.50 mtrs to 6.00mtrs lift
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil. 6.00 mtrs to 7.50mtrs lift
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil.7.50 mtrs to 9.00mtrs lift
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Brick flat soling.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate
12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_365041.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_365041.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid