Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹34.8 L
EMD Value
₹1.7 L
Closing Date
9 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Manager
PROJECT MANAGER, 19 MARUTIPURAM, FAIZABAD ROAD, LUCKNOW
CONSTRUCTION OF 200 BEDED BOYS HOSTEL (PHASE-I) AT NEW CAMPUS, LUCKNOW UNIVERSITY, LUCKNOW
2020_UPPRC_488979_5
19/PCL/PM/Unit-8
Open Tender
Machineries
Item Rate
30 days
Lucknow
CONSTRUCTION OF 200 BEDED BOYS HOSTEL (PHASE-I) AT NEW CAMPUS, LUCKNOW UNIVERSITY, LUCKNOW
2 documents required · 2 mandatory
₹2,950
Project Manager, Unit-8
₹1.7 L
20 Jul 2020
1 Jul 2020
9 Jul 2020
1 Jul 2020
9 Jul 2020
1 Jul 2020
30 days
Amount
Labour charges for R.C.C work with cement approved coarse sand & 20 mm guage approved stone grit in the proportion of 1:1.5:3 in Plinth, Column, Beam, Slab, Steps, Projection, Lintel, excluding necessary centering & shuttering, supply of reinforcement, material but including labour T&P etc.required for proper completion of work.
Providing & fixing centring & shuttering including strutting, propping etc. in all type of work and removal of form of all height as per CPWD Specification no. 5.9 Note- 1. New materials shall be used in centring and shuttering. 2. Old material shall not be allowed in shuttering and centring. 3. All the material shall be removed within 3 days from the date of removal of shuttering and centring.
Labour charges for steel reinforcement in R.C.C. Work including cutting, bending, binding and placing for required shape but excluding cost of all steel.
Labour charges for first Class brick work in 1:4 (1: cement and 4: coarse sand of 2.25 F.M.) mortar in Super structure including all labour, tools and plants etc. required for proper completion of the work. Including curring complete)
Labour charges for first Class brick work in 1:6 cement and coarse sand of 2.25 F.M. mortar in Super structure and plinth including all labour, tools and plants etc. required for proper completion of the work. (1:6 cement & coarse sand) (curring complete)
Providing and injecting chemical emulsion for PRE-CONSTRUCTIONAL Anti termite treatment and creating a chemical barrier under and around the columns pits, wall trenches basement excavations top surfaces of Plinths filling junctions of walls and floors along the external perimeter of building , expansion joints surroundings of pipes and conduits etc. complete plinth area of the building at ground floor only shall be measured as per IS 6313 ( part -II ) Aldrine emulsifisble concentrate or any other approved material such as chloropyriphos or Heptrachlor or chlordance will be used. The rates of (1) Treatment for Masonary & foundation 5 liters per / 100 Sqm. (2) Back fill in immediate contact with foundation 7.5 liters per / 100 sqm. (3) Treatment of top surface of plinth filling 5 liters per / 100 sqm (4) Treatment junction of wall and the floor 7.5 liters per / 100 sqm (5) Treatment of soil along External perimeter of building 7.50 liters per / 100 sqm. (6) Treatment of soil under Apron along external perimeter 5 liters per / 100 sqm
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, ramming, dressing etc rate to include cost of all materials, labour and T & P etc required for proper completion of the work.
Labour charges for laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 Stone ballast 40 mm nominal size) including all labour T & P etc, but excluding cost of all material required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. (curring complete)
GST extra as applicable
YASH BUILDERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .