Tender Value
₹8.5 L
Closing Date
22 Sept 2021, 4:00 pmClosed
Executive Engineer,ERD,CWC,BBSR
O/o The Executive Engineer,ERD,CWC,Plot no A 13 14,Bhoinagar,Bhubaneswar,751022
Construction Renovation of Compound Wall at Mahanadi Bhawan under MERO, CWC, Bhubaneswar
2021_CWC_647245_1
ERD/JE-HQ/NIT/1728-31
Open Tender
Civil Works
120 days
Bhubaneswar
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
24 Nov 2021
8 Sept 2021
23 Sept 2021
8 Sept 2021
22 Sept 2021
8 Sept 2021
Amount
DISMANTLING
Demolishing B.W manually /by mechanical means including stacking of serviciable material and disposal of unserviciable material within lead 50 mt as per direction of Engineer-In- Charge. In Cement Mortar
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Scraping and removing of steel work on existing surface.
Dismantling Wire mesh in fencing including making rolls and stacking within 50 metres lead.
NEW WORK FOR DISMANTLED COMPOUND WALL
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge). All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form work for foundations, footings, bases for columns.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric water proofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand)
12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand)
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work sqm
Cutting of Tree of 3 m dia meter including removing of trunk , branches etc and stacking with cleaning as per instructions of Engineer in charge
RENOVATION OF EXISTING BOUNDARY WALL
Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand). Raised and cut pointing
12 mm cement plaster of mix. 1:6 (1 cement: 6 fine sand)
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications. Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work sqm
WIRE MESH FENCING OVER EXISTING COMPOUND WALL
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work sqm
CHITTA RANJAN DASH
GAURANGA CHARAN MOHAPATRA
NIRANJAN BEHERA
AKSHYA KUMAR PATRA
G.C. BEHERA
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid